Loading...
2008/09/22 ~ r_ v _ COMMUNITY~SERVICES'. COMMITTEE AGENDA;: h. 6 SEVENTEENTH MEETING Monday, September 22, 2008 - - - 5-00-p:m. - City Hall, Committee Room #2A & B 1) Approval of the September 8, 2008, 2008 Community Services Minutes. 2) REPORTS: STAFF CONTACT. a) CAO-2008-04 Service Delivery Review -Water & Wastewater Services Geoff Holman Dale Morton b) MW-2008-57 City of Niagara Falls Rail Line Ad Hoc Committee Terms of Reference Ed Dujlovic c) MW-2008-46 2008 Loose Leaf Collection Program Geoff Holman d) MW-2008-53 Revisions to Contract 2008-205-08 2008 New Sidewalk Program Geoff Holman e) TS-2008-48 Feasability of Reopening Main Street Karl Dren Environmental Assessment 3) NEW BUSINESS: 4) ADJOURNMENT: MINUTES OF COMMUNITY SERVICES COMMITTEE MEETING MONDAY, September 8, 2008, CITY HALL, ROOM 2 AT 4:00 P.M. PRESENT Chair Councillor Carolynn loannoni -Mayor Ted Salci, Councillors: Jim Diodati, Vince Kerrio, Victor Pietrangelo(4 35 p.m.), Bart Maves, Wayne Thomson, Janice Wing and Shirley Fisher STAFF John MacDonald, Ken Burden, Ken Beaman, Karl Dren, Geoff Holman, Denyse Morrissey, Dean lortida, Alex Herlovitch, Serge Felicetti, Trent Dark, Marianne Tikky- Steno. GUEST Mr Todd MacDonald, Performance Concepts Consulting Ltd ,Stamford Kiwanis Club Members Brian McKeoun, Stephen Larames, Howard Gord, John Prentice, Michael Sproule. NUSC Members: Donna Mantesso (president), Dan Santin, Andrew Howcroft and David Jovanovic. PRESS. Corey Larocque, Niagara Falls Review MINUTES It was ORDERED on the motion of Councillor Fisher and seconded by Councillor Wing, that the August 18, 2008 minutes be approved REPORTS a) FS-2008-35 Building and Planning Fees Review It was ORDERED on the motion of Councillor Diodati and seconded by Councillor Wing that; 1 That Committee recommend the report and consultant's presentation for information 2. That the Chief Building Official be directed to hold public meetings as required by Bill 124 so as to increase building permit fees effective January 1, 2009 3 That staff be directed to hold public consultation meetings with the public including the development community and to provide Council with recommendations for the establishment of new planning and engineering fees effective January 1, 2009 Motion: Carried Action Recommendation submitted to Council September 8, 2008 -z- b) R-2008-30 Fees for the New Artificial Turf Sports Field at Kalar Park 'Home for Niagara United Soccer Club' The Director of Parks, Recreation and Culture advised that the hourly rate listed in the report on page two for Non Resident Minor/Youth Sport Organization should - -read $80.00-not-$60 00-as-listed - - - It was ORDERED on the motion of Councillor Wing and seconded by Councillor Kerrio that, 1 That the fees for the artificial multi-purpose sport field for the period September 8, 2008 to April 31, 2009 be approved. 2. That all net revenues generated from the rental ofthe field (excluding lighting fees) to other users in the years 2008, 2009, 2010 and 2011 be dedicated to and applied entirely to the project costs of the field and reduce each party's contribution equally Motion Carried Action. Recommendation submitted to Council September 8, 2008 c) R-2008-27 Review of Request -Ban of Plastic Bags It was ORDERED on the motion of Councillor Wing and seconded by Councillor Fisher that; 1 That the City of Niagara Falls play a leadership role in educating and encouraging all businesses, retailers, and residents to significantly reduce and strive to eliminate their use of plastic bags 2. That an educational campaign and implementation strategy be developed through the Park In the City Committee, and the recommended educational campaign and implementation strategy which would include the budgetary requirements be outlined in a future report to Council. Motion: Carried Action Recommendation submitted to Council September 8, 2008 d) TS-2008-44 Request for Extension - Kiwanis Agreement It was ORDERED on the motion of Councillor Pietrangelo and seconded by Councillor Diodati that; 1 That, the request to extend the existing agreement a further five years (2010 to 2015), be approved, and, 2 That the City dedicate up to $6,000 00 for concrete pad installations, to -3- facilitate the installation the Kiwanis benches, at mutually agreed upon transit stops. Motion. Carried Conflict: Councillors. Thomson and Kerrio (members of the Fallsview BIA) Opposed Councillor Wing _Action._ Recommendation_submitted_to_Council_September_8, 2008._ _ _ 3) NEW BUSINESS' a) It was ORDERED on the motion of Councillor Thomson and seconded by Mayor Salci that the trees in the vicinity of 5701 Prince Edward Avenue be removed by City forces. Motion. Carried Action Recommendation submitted to Council September 8, 2008. b) It was ORDERED on the motion of Councillor Wing and seconded by Mayor Salci that the police be requested to provide enforcement on Preakness Street due to speeding concerns. Motion Carried Action: Recommendation submitted to Council September 8, 2008 c) It was ORDERED on the motion of Councillor Wing and seconded by Councillor Kerrio that staff review the corner parking restriction at the corner of Culp Street and Orchard Avenue. Motion. Carried Action Recommendation submitted to Council September 8, 2008 4) ADJOURNMENT a) It was ORDERED on the motion of Councillor Maves and seconded by Mayor Salci that the regular meeting of the Community Services Committee be adjourned 6'00 p.m. and the resolution entering into a In-Camera Session be approved Motion Carried b) It was ORDERED on the motion of Councillor Wing and seconded by Councillor Kerrio that the Chief Administrative Officer be assigned the duties of the City Clerk during the Closed In-Camera Session. Motion: Carried September 22, 2008 CAO-20D8-04 City Hall 4310 Queen Street _ P.O. Box 1023 Chief Administrative Officer ~ Niagara Falls, ON L2E 6X5 web site: www.niagarafalls.ca (905) 356-7521 Ext. 5100 Fax: (905)374-3557 jmacdonald@niagarafalls.ca Councillor Carolynn loannoni, Chair and Members of the Community Services Committee City of Niagara Falls, Ontario Members. Re CAO-2008-04 Service Delivery Review -Water & Wastewater Services RECOMMENDATION: 1) That the recommended changes to the operation of the Water/Wastewatersecbon, as set out in this Service Delivery Review Report, be approved 2) That staff be authorized to move forward with implementation BACKGROUND• The Service Delivery Review of Water and Wastewater Services commenced in May 2007 More than 40 meetings were held with the Service Delivery Review Team, water and wastewater staff, and various union and management staff during this process. The purpose of service delivery review is to ensure municipal programs and services are provided in the most efficient, effective manner to best meet the needs of the community, and to help in finding long-term sustainable solutions to ongoing budget challenges. This review comprehensively assessed the City's water distribution and wastewater collection services to ensure the best use of staff and municipal resources The attached report summarizes the review findings with regard to the City's water distribution and wastewater collection services. As reflected in the attached report, the following key changes to the City's water and wastewater services are recommended • anew mission statement and organizational structure that provide the framework for a more effective section • greater emphasis will be placed on preventive maintenance of these systems to extend the life of the infrastructure September 22, 2008 - 2 - CAO-2008-04 • key operating principles to guide future decisions affecting the operation of the section • renaming the section "Environmental Services" • development and implementation of Standard Operating Procedure (SOP's) for each activity in the section. In all, 56 SOP's, plus associated forms and reports, have been developed. • defined levels of service and performance measures for water and wastewater emergency and preventive maintenance programs • contracted work should be reclaimed, whenever possible within staff's ability and where financially feasible • comprehensive training and soft skill development for all leadership positions in the section • change in the management approach to a participatory management model to increase staff engagement • cross -training of leadership staff • development of a communications plan for the section • one new management position, Environmental Services Coordinator, to plan and coordinate the administrative, meterand locates staff, and to monitor and maintain performance measurement data and statistics • increasing the union complement by four positions to facilitate uninterrupted preventive maintenance program activity The increase in labour costs resulting from the reorganization will be approximately $385,000 Thefunding required to support the additional positions and to accomplish these changes will be generated through reduced reliance on contracted services, an estimated cost saving of more than $400,000 per year As a result of employing the aforementioned strategies, it is anticipated that the changes will not result in increased costs t the Corporat~io jn. Respectfully submitted: Jo acDonald, Chief Administrative icer D Morton i Niaga;ra~irlls Water /Wastewater Service Delivery Review Report September 22, 2008 Service Delivery Review The purpose of service delivery review is to ensure municipal programs are provided in the most efficient, effective manner to best meet the needs of the community The Service Delivery Review - - - - Process- - - - - ~ Form Service Delivery Review Team Prepare purpose statement Establish baseline description Identify performance indicators & levels of service Evaluate current performance v Identify issues v Review best practices Our System 420 km distribution water mains 2,894 fire hydrants 4,594 valves 422 km sanitary sewers (includes combined) 345 km storm sewers 6,290 catch hasins 27,379 sanitary sewer laterals 27,379 water services 5,398 sewer maintenance holes 4,410 storm maintenance hales Trends and Challenges WaterlWastewater Challenges and Emerging Trends n Addressing our aging infrastructure and infrastructure deficit. n Licensing and certifcetion of new employees and the upgrading of licenses far existing staff which requires financial and staff resources on an annual basis. v the "hidden infrastructure" aspect of the water/wastevrater sector which causes residents to undervalue the service provided. v Improving staff skills and training to get ahead of the industry change. 'r Responding to the ever changing and increasingly stringent regulatory framework at the provincial and federal levels. r Replacement of retired highly skilled employees. Study Challenges > Overcoming cultural resistance to change (the "if it ain't broke don't fix it" mentality). n Establishing the relevance and potential benefits of management improvement options. n Establishing appropriate performance expectations and associated performance measurement approaches. Mission Statement - ~i - •IProvide areliable and_ i'Protect human health, ~ PtoJide a well- dependable drinking theemlionment;and=- fiunctloningsanltacyand water;systerrithafcan public propertyin,. stormsewersystemthat deliver safe, potable ,Niagara Falls. =can remove all types of{. water. waste in an • Gomplywith applicable environmentally • Operate the drinking legislation and acceptable manner. water system efficiently. regulations. • Operate the -Maintain and- wastewater system continually improve the efficiently and cost- City's Drinking Water effectively. Quality Management System(DWOM$)' SWOT Analysis "Experience Communication puality Service + Lack of Common Focus or Values (a Knowledge ?StaHing Structure, Le•rels,antl Position Descriptions ~ Treining and Educational Opportunities Morale Lack of Team Work i Ceditication ~ Limited JOb Knowedge Re: Core Services w +Responsihilities ?Organization of Work Flows and Processes ~ +Equipment ?AfterHours Response Youtlr ? Knowledge ? Limited Resources 0~ m Changing Legislation(PSAB etc.) Meeting Changing Legislationand Standards ~ IJew Tachnologyi.e Trenchless ?Gcmpetltion from Contractors, Possiblythe Region L Training and Certification ?Limited Funding QI 'CHy Growth Provgesblew Sources of RCVenue Mismformatian Provided [o the PUhlic by Media K ?Highai Profile of WaterNJastevster Sarviees ?DlHiculty Fillin90vertime Shlftc tl.l + Health and Safzty Issuas-New Threats to Employees . Attitudes-Complacency, Lack of Respect Key Operating Principles nri,Re>,~ns Mission Statement Key operating Prinaples n.H.m.x wn«. cw.m.. ~ •..r.NruM ~..ex. .Y.umi«n ceTN`nn ~ M umu a.w.~uiro ~cwnr.aun c«xm~ ww..M.u.. Standard Operating Procedures In cooperation with water and wastewater staff, we developed: ? 43 Standard Operating Procedures for Water ? 13 Standard Operating Procedures for Wastewater ? 24 new or revised forms and reports ~ Undergoing Peer Review by UEM ? To be updated yearly ~,.a~na~ anu „,.,.Q. - - - ~d„~., W.«~,. ,a:~~ SAMPLE ,E - .a~.a;~~oms,~.~,....,.,~,~.P ,~.n,,~,,,m,ro p 9 aE~so,~. - - StandardO eratin °°:~°~^°°;a - Procedures (SOP) .WaE 4~~vmm~~w~vaYwgv~mnm Document Format ' ~~~eA ^~'~=ate' m'~~~~ wapgmxx.n~ea~nnso~d ~ 5 wn~t VV~uYmuna aiwq ~m ;Fn.vmnCauCW i :AUde4ea 'xemm~ Bne~ao-em,'i naxann . _ PM_MUe_ _ _ _ i _ Wbs~a+~' _ _ wem amep4~ smmndrn~pltl. Service Delivery Survey y Undertaken by Urban & Environmental Management Inc. ~ Included 8 comparable Ontario municipalities similar in system and size. y Provided level of service and structure information for comparison to Niagara Falls. Program Planning Emergency response and preventative maintenance programs have been identified for the water distribution and wastewater collection systems with the associated levels of service and performance indicators. Emergency Repairs & Preventative Maintenance Programs -Water Distribution New Programs Increased level of Service Activity Description 8 Purpose Program Benefits /Level of Service Performance Indicator(s) (Mnual) Emergency Water Main Emergency water main repairs are required as a Emergency Repairs to the water distribution number of service interrulptions due to Repairs result of any unexpected interruptions or breaks in network will be made as soon as possible, but water main breaks the water delivery system that impact service. For within 24 hours of the identification of the length of service interrupttions due to water the purpose of this exercise, emergency repairs problem or deficiency. main breaks I are divided into day and after hours activities. average response time to water main DWQMS will provide a rating system for breaks criticality of water main breaks in order to prioritize repairs. Emergency Water Emergency water service repairs are required as Emergency Repairs to a water service will be number of service interruptions due to Service Repair a result of any unexpected interruptions or breaks made as soon as possible, but within 3 water service breaks in the water service that impacts a private service. working days of the identification of the length of service interruptions due to water For the purpose of this exercise, emergency problem or defciency service breaks repairs are divided into day and after hours average response time to water service activities. breaks ~I New Water Services New water services involve extension of pipe into Work is undertaken on a planned basis. number of new services installed areas of redevelopment and inf Iling ' Water Service Planned replacement of existing deteriorating or Work is undertaken on a planned basis, number of water services replaced Replacement on Road undersized water service. according to budget. Allowance Main Valve Repair Repair of City valves on water mains, when the Valves are repaired on a planned basis. number of main valve repairs valve is broken (open or closed) the valve is leaking, the valve is stiff, or is difficult to operate, or does not hold. Main Valve Distribution valve replacement on water mains Valves are replaced on a planned basis. number of main valves replaced Replacement when the valve is broken (open or closed), the valve is leaking, or the valve is stiff, or difficult to I operate, or does not hold, and cannot be repaired. ' Tapping Water Services When City staff are excavating and adding a large Water services are tapped on an as needed number of water serviced tapped -Complete water service or hydrant, a tapping valve and basis. I sleeve may be installed. I i Emergency Repairs & Preventative Maintenance Programs -Water Distribution New Programs Increased Level of Service Activity' Description & Purpose Program Benefits /Level of Service Performance Indicator(s) (Annual) Tapping Water Services When contractors are adding a large water Water services are tapped on an as needed number of water services tapped for for Contractors service or hydrant, City staff may be required to basis. contractors install a tapping valve and sleeve only. Curb Stop Box Repair Repair or replacement of a damaged curb stop Curb Stop Bozes are repaired or replaced on number of curb stop boxes repaired & Replacement box that covers the curb stop. an as added needed basis number of curb stop boxes replaced Curb Stop Repair & Repair or replacement of the curb stop used to Curb Stops are repaired or replaced on an as number of curb stops repaired Replacement connect the public water distribution system to added needed basis number of curb stops replaced private property Water Main Flushing Over time, the interior of water mains become Water mains should be Flushed on an as number of water main locations Flushed encrusted on the inside reducing the inside needed basis. Flushing water mains help to number of km of water main Flushed diameter. This program vrill remove the most avoid stagnant water and low chlorine recent sediment and mineral deposits, improving residuals. There are particular areas that the water quality as well as the hydraulic carrying require more frequent Flushing, for example, capacity of the pipe. dead ends and older mains. Hydrant Opening, Hydrant opening and inspection ensures that the All fire hydrants will be opened and inspected number of hydrants opened and inspected Inspection, and Testing hydrant is operational, with adequate fre flow at least once a year, and after each use, to number of hydrants identifed as requiring pressure. Flow testing may be undertaken. provide assurance that they will be fully service functional when needed • number of instances where fire fighting was impeded by low pressure Hydrant Repairs It is important to identify and put back into service Fire hydrant repairs will be undertaken within number of hydrants repai~lred any hydrants not functioning at the required 24 hours of the identifcation of a deficiency. number of hydrants repai2d within 24 capacity as soon as possible to ensure availability Hydrants where water mains with insufficient hours of identification of deficiency for f re fighting use. fire flows exist will be taken out of service and The need for repair is identified through the bagged, and the main scheduled for Hydrant Inspection, Testing and Flushing program replacement. or water modelling, or identified after a recent use. Emergency Repairs & Preventative Maintenance Programs -Water Distribution New Pfograms Increased Level of Service Activity Description & Purpose Program Benefits /Level of Service Performance Indicator(s) (Annual) Hydrant Flow Testing To determine the available f re flow/pressure for Hydrant flow testing will take place as needed. number of hydrants flow (tested new development and sprinkler systems, water ~ model confirmation or to isolate valves. Black Ring Hydmnts A black band or ring on any hydrant indicates a Black Ring hydrants will be inspected and number of black ring hydlrants inspected hydrant is not self draining. These hydrants must drained as required. and'!or drained be drained manually to ensure they do not freeze. Hydrant Replacement The City of Niagara Falls is responsible for Usually, the replacement of the hydrant is pre- number of hydrants replaced servicing and maintaining fire hydrants located planned. The Hydrant Inspection and Flushing across the City. Program generally determines which hydrants to replace. Hydrants without breakaway flanges hit by vehicles may require i emergency replacement Replacement in a timely and effcient manner, while minimizing disruption in service. Thawing Frozen Sub-zero weather conditions may lead to frozen Hydrants are thawed on an as needed basis. number of hydrants thawed Hydrants hydrants that require thawing. Microbiological To take samples on a routine basis from the water Microbiological sampling is mandated by the number of samples taken Sampling distribution system, and to test the samples for Provincial government. A total of 88 samples appropriate chlorine levels. must be taken each week. Sampling also number of samples indicating adverse occurs after an event such as a water main water quality break, or hydrant usage. This may help identify localized problems before they become a system wide concern. Water Sample Station Water Sample stations are installed where there is A water sample station simulates a private number of water sample (stations installed Installation no convenient access point to take a service sample. microbiological sample for a particular area. Lead & Heavy Metals Water samples are taken to determine the levels number of samples taken Sampling of lead and heavy metals number of samples taken with adverse readings I Emergency Repairs 8r Preventative Maintenance Programs -Water Distribution New Programs Increased Level of Service i Activity Description 8 Purpose Program Benefits /Level of Service Performance Indicator(s) (Annual) Meter Inspection & Water meters are inspected, and then repaired if Inspection and repair of water meters is number of water meters maintained Repair necessary The purpose is to ensure that meters undertaken on an as needed basis.. continue to read accurately and are properly I maintained. This may involve testing the meter I which is done by an independent company I New Meters New meters are installed in areas of new Installation of new water meters is undertaken number of new meters installed development and infill situations. City staff inspect on an as needed basis. the new meter and widng, seal the meter, install the touch pad and take a reading. Meter Change- Outs Meter change-outs are undertaken when the Change-out of water meters is undertaken on number of meter changeouts completed service life of the meter has been surpassed or an as needed basis. the meter is malfunctioning (broken, leaking, frozen) and cannot be repaired. Water Quality Water quality concerns generally include Water quality complaints will be addressed on number of water quality complaints Complaints diswloration, smell, changes in taste, low the same working day of their receipt. number of adverse water) situations pressure, turbidity or no water They are dealt with effciently and with I minimum disruption tc the customer Shut Offliurn On Water service to a residence, commercial or Shut off and turn on of water service is number of services shut off Services industrial use may be shut off for a variety of undertaken on an as needed basis. I reasons including arrears in payment, as a result number of services turned on of work orders from Hydro or Fire, for main repairs or other emergencies, and at vacant properties or for vacationing property owners. Blow Off Installations Where no hydrant is available for flushing Blow Offs are installed as needed. number of blow off installations purposes, a blow off is installed, normally during ~ the construction phase of development. Locates When undertaking work underground, services Locates are performed on an as needed basis number of locates performed including telephone, cable, gas and existing water according to a priority system, where and sewer lines must be located before the dig. emergency repairs take precedent. Emergency Repairs & Preventative Maintenance Programs -Water Distribution ~ New Programs Increased Level of Service Activity Description & Purpose Program Benefits / Levef of Service Performance Indicator(s) (Annual) Restoration Any landscaping, grounds or roadways damaged Restoration of property damaged as a result of number of restorations performed or disturbed as a result of work undertaken by emergency or planned work will be undertaken Water section staff during the repair ,installation in May or June if the work took place from number of restorations performed within or replacement of items related to the water November to April, or within 2 weeks if the the allotted time frame distribution system must be restored. work took place from May to October Hydrant Painting Hydrant barrels are painted red and caps painted Hydrant will be painted, as a minimum, once number of hydrants painted appropriate colours based on flow rates every flue years. determined from flow tests and hydraulic modeling. The colour code allows Water Section and Fire staff to immediately identify the capacity i of the hydrant in liters per minute. Valve Exercising Valves need to be operable to isolate breaks in All valves will be operated annually. Valve number of valves exercisled Program the system. Implementing a valve maintenance chambers are checked for defciencies at the number of valves identified as requiring program provides for more efficient more efficient same time. repair emergency repairs extends valve life and results Any defciencies with valves or valve i in long term savings to the system. chambers will be repaired on a priority basis. Bulk Water Station Inspection of bulk water stations including Once per year to ensure proper accounting inspection of bulk water station Inspection and calibration and backflow prevention check. for water use and to prevent cross Maintenance Ensures a reliable source of water to bulk water contamination of the water distribution system. haulers for the City's rural customer Small Meter Life cycle replacement of aging residential or Residential and small commercial meters have number of meters replaced Replacement Program small commercial meters. a maximum 15 year life cycle, and will be i (50 mm or smaller) replaced within that time frame. i I Emergency Repairs & Preventative Maintenance Programs -Water Distribution New Programs Increased Level of Service Activity Description & Purpose Program Benefits /Level of Service Performance Indicator(s) (Annual) Large Meter Inspection It is imperative to ensure accurate measurement Large commercial and industrial meters will be number of large meters i II spected Program of all water delivered. inspected once each year, and replaced on an number of meters identifed as requiring (Larger than 50 mm) as needed basis. replacement On average, water meters have a useful life of approximately 15 years and larger meters require i maintenance and calibration on a regular basis. it This program strives to ensure that all large i meters continue to read accurately and are properly maintained. Even small mistakes in accuracy can result in thousands of dollars of lost revenue for the City In addition to lost revenue associated with poorly maintained meters, accurate accounting of water consumption has proven to aid in water conservation efforts. When customers are appropriately billed for water used, they quite often undertake conservation efforts to reduce their use. Leak Detection Leak detection activities are used to quantify the The Leak Detection Program will target the number of km of distribution system tested Program amount of water leaving the distribution system entire City s water distribution network in 2008. number of leaks identified through cracks and joints in the distribution piping and to identify areas with excessive levels of real Defciencies identified are repaired on a estimated number of liters of water lost water loss. priority basis once identifed. through leaks This program is an effective way to reduce operating and maintenance costs. ' I Emergency Repairs & Preventative Maintenance Programs -Water Distribution New Programs Increased Level of Service Activity Description & Purpose Program Benefits /Level of Service Performance Indicator(s) (Annual) Commercial Backflow Backflow prevention ensures that water delivered To be determined To be determined Prevention Program to a premise cannot flow backwards into the City's Backflow prevention on private hydrants is a water distribution system and present any threats to other customers or the system itself. In older, critical control. Prevention of cross connection established cities such as Niagara Falls, with a to the City's water system will be targeted. variety of industrial, commercial, and institutional facilities a robust water backflow prevention program is critical in demonstrating a desire to protect water quality. i An initial investigation will be undertaken in 2009 ~ to establish a methodology for implementing a backflow prevention program in commercial areas. Water Conservation Water conservation and water efficiency programs To be determined per capita residential water use are used to reduce the volume of household and industrial water and wastewater entering per capita wastewater generation combined and sanitary sewers. This lowers the risk of combined sewer overflows and sewer surcharges during rainy weather. A formal program will be established to educate the community and encourage and promote water conservation. Unauthorized Uncontrolled use and connection to the water To be determined. Elements of the program To be determined Consumption of Water system must be itlentifed and stopped. include a Backflow Prevention By-law and ~ public education. Private Fire Hydrant There are 222 multi-residential, institutional, To be determined To be determined Maintenance commercial and industrial establishments that Strategies to address unauthorized use and have private hydrants. These hydrants may be potential for maintenance program at a cost to susceptible to malfunction, uncontrolled water owners exists. consumption form the hydrant, and water loss through leaks, if not maintained. III Emergency Repair and Preventative Maintenance Programs -Wastewater Increased Level of Service New Program Activity Description 8 Purpose Program Benefits I Level of Service Performance Intliwtor(s) - .(Annual) Emergency Repairs - Repair or replacement of sewer lateral that is Emergency repairs to sewer laterals are made as number of sewer lateral backups Sewer Lateral Repair & broken, or has become blocked with tree root soon as possible but within 24 hours of the average response time to sewer lateral Replacement growth, foreign objects etc. identif cation of the deficiency in critical cases. back ups • number and value of claims against the City resulting from sewer lateral back ups Emergency Sewer - Repair of sewer mains that have broken or have Emergency repairs to sewer laterals are made as number of emergencyll repairs to main Main Repairs deteriorated, or have become blocked with tree soon as possible but within 24 hours of the line sewers i root growth, foreign objects etc. identifcetion of the deficiency in critical cases. average response time for emergency repairs to main line sewers • number and value of claims against the City High Pressure Main High pressure main line sewer cleaning reduces Main line sewers are cleaned once every five number of km of main) line sewer Line Sewer Cleaning blockages by cleaning debris from the bottom of years. cleaned the sewer thereby increasing capacity. Areas subject to chronic blockage problems are cleaned more frequently on an as needed basis. Sewer Lateral Cleaning Sewer Lateral cleaning removes sewer Sewer laterals are cleaned on an as needed number of sewer laterals cleaned obstructions that can be caused by tree roots, basis. pipe condition, and foreign objects, reducing the potential for future back ups.. SSET N Inspection N inspection provides an indication of the Every sewer lateral cleaned is N inspected at number of sewer laterals N inspected and Tracing condition of the sewer or sewer lateral. This data the same time. number of main sewer lines N is used to determine the need for maintenance, Main sewer lines are TV inspected once every inspected rehabilitation, or replacement of the pipe. ten years. Monitoring and Sanitary sewers are monitored in areas at risk of Reduced basement flooding during rainfall number (and estimated volume where Pumping Sanitary flooding during high intensity or long duration min events. available) of untreated discharges to Sewer Overflows and events. Should emergency levels be reached surface water Sewage Sampling pumping is initiated to reduce or prevent Monitoring and pumping take place on an as number of hours of untreated waste basement flooding, needed basis. released ~ Sewage samples are taken when overflows are pumped to the storm sewer or river Catch Basin Repair Catch basin repair generally involves the repair if Repair improves catch basin function, and number of catch basins repaired deteriorating, damaged or tilted asphalt frames eliminates sink holes and cracks around catch surrounding the catch basin, or broken bricks basins in roadways. inside the catch basin. Emergency Repair and Preventative Maintenance Programs -Wastewater Increased Level of Service New Program Activity Description & Purpose Progrem Benefits I Level of Service Performance Indicator(s) (Annual) Culvert Cleaning Culvert maintenance includes the removal of Culvert maintenance is undertaken to extend the number of culverts cleaned accumulated debris (e.g., logs, boulders, garbage, life of the structure and to ensure that it functions I ice build-up) that prevents the efficient passage of as designed, improving flows and reducing surface flooding. water through the structure. Restoration Any landscaping, grounds or roadways damaged Restoration of property damaged as a result of number of restorations performed or disturbed as a result of work undertaken by emergency or planned work will be undertaken in number of restorations performed within waste water section staff during the repair , May or June if the work took place from the allotted time frame installation or replacement of items related to the November to April, or within 2 weeks if the work wastewater collection system must be restored. took place from May to October Visual Inspection of Using Zoom camera technology, allows for Allows for immediate identification and evaluation number of visual inspections of sanitary Sanitary Sewers immediate visual inspection of sanitary sewers. of problems. sewers Maintenance Hole Repair of maintenance holes often includes repair Repair improves maintenance hole function, and number of maintenan I holes repaired Repair of modulac and ladder rungs. Maintenance hole eliminates sink holes and cracks around catch covers may also have to be replaced. basins in roadways. Cleaning & Clearing of Cleaning and clearing of catch basins and storm Areas subject to chronic blockage problems are number of catch basins cleared and Catch Basins and water restrictors is undertaken to ensure their long cleaned more frequently, on an as needed basis. cleaned Storm Water Restrictors term operation. Improved operation results in the number of storm water restrictors prevention of blockages and surface flooding and cleaned and cleared reduced sediments released to the environment. Combined Sewer Clearing of Combined Sewer Overflow s will CSO will be inspected on a yearly basis, and number of combined seewer overFlOws Overflow Inspection ensure operability and unrestricted flow when corrective action is taken as required. inspected and maintained and Maintenance required. Cross Connection Where there are unwarranted physical Regular inspection, testing and education are To be determined Control connections of storm sewers to sanitary sewers, required to eliminate cross connections. infltration and extraneous flows may occur Sewer Lateral Sewer lateral relining provides "minimal dig" Relining of Sewer laterals extends the life of the number of sewer laterals relined Re-Lining rehabilitation lateral, corrects problems, reduces the potential for future problems. Weeping Tile To redirect weeping file Flowing to sanitary sewers Weeping file disconnection will reduce: wet To be determined Disconnection to storm sewers or surtace drainage. weather flows to the sanitary sewer basement percentage of homes inspected for Flooding, flows treated at the sewage treatment weeping file disconnection plant, and the cast to the City far treatment. ~i This is a fve year plan. I Emergency Repair and Preventative Maintenance Programs -Wastewater Increased Level of Service New Program - _ i Activity Description 8 Purpose Program Benefits /Level ofService Performance Indicator(s) (Annual) Roof Leader To remove eMraneous Flows in the sanitary sewer To be determined. To be determined Disconnection system from roof leaders. The goal is to have all roof leaders directed away from building foundations. I I Key Recommendations Improve the Effectiveness and n Standard Ocemling Procedures n Responslbilily and Accountability Efficiency of Work Processes (SOP's)were developed for all water 8 wastewater work processes rCUStomer Service r a greateremphasis has been placed on preventative maintenance y Regulatory COnpliana activities to extend the life of the water 8 wastewater systems z best practice Information nos > Health 8 Safely utilizetl b determine appropna[e direction fa sernces and to itlenlify .Fiscal Responsibility new rnethoddogles or technologies z revised leadership position descriptions will result in better clarity and increasetl eHidency =oppodunilies tc reclaim wnlmded work were identifietl n levels of service have increased in some areas iie. restoration) antl new maintenance prog2ms have been developed Key Recommendations Develop Systems to 8¢Iter Plan a defined responsbihty at each Responsibility and Accountability and Measure Work leadership level r developed Levels of Sernce far work processes r identified certorrrence measures for each work process i best practice review for levels of serwce Through service delivery review survey z New maintenance management systems will enable better tmeking of processes and measurement of progress. New accounting rules will help better define the wmelation between money spent and work done. n the new Environmental Services Coordinator position will aitl in the planning and coordination of wodr in meters and IOpatea antl will be responsible for maintaining pertormance rtanagemenl data. Key Recommendations Develop Systems 1o Better Plan n comprehensive (raining and soft Responsibility antl Accountability and Measure Work, con}inued... skill development for management stall and aspiring managers will improve work (law n lead hand Iralning wlll assist in clarification of roles and responsibilities n annual reports will be prepared that provide section response [o pedwrtunce measures antl levels of seance v at each organizational level, Ne planning time frame antl responsibilities have been identified. Once implemented, this should result in the appropnale advance planning by the fight individuals. Key Recommendations - Improve Leadership Approach n recognition of need for change in ResponsibJity and Accountability and Capabilities to Rebuild managemeN approach Trust and to Trensform the Culture n recommended shill to a partippalory approach to management n leaders will be held rtwre accountable, in part Through pertormance management goal to enhance the ppaaty of the workforce to meet the challenges of change vAlh compehensrve training and soH skill development for management stall and aspiring managers Key Recommendations Improve Leadership Approach v encouraging menlonng antl Responsibility and Accounlabilily and Capabilities to Rebuild coaching will support aria sustain a Trust antl t0 Transform the richer teaming environment Culture, wntinued... s leaders to become more atlept a[ the meaningful Involvement or all employees in how decisions are made and m developing innovation a supernsors and lead hantls will be cross-Irainetl to provitle experience for those who may wish to atlvance n al each organizational level, the planning lime frame antl responsibilities have been idenlifed. Key Recommendations Improve Leadership AppmaCh i work to rrininvze grievances that Responsibility and Accounlabilily and Capahilities to Rebuild waste time, talml, energy and money Trust and to Transform the Culture, wntinued... Key Recommendations Develop an Organizational n better tlefined roles, rResponsibihty and Accountability Structure, Levels and Position responsibllites,ontl levels of authority Descriptions Suited 10 the through Ne new organizational nSUStainabilily delivery of quality water and strucure will provide danty for staff wastewater services nRegulalory Compliance n position tlesaiplions have been developed for new roles n with the tlevelopmenl of Slandar0 Operating Procedures far each section !unction, position tlescriptipns will be uptlatetl antl re~evalualetl by the JJEC to ensure equitable recognition far position responsibilities Key Recommendations Develop an Organizational n esfablishing areas vnlhin the n Responsibility antl Accountability Structure, Levels and Position structure to toms on preventative DCSCdptionS Suited to the maintenance re0ec15 irtpprtanm of n Suslainabilily delivery of quality water and these initiatives wastewater Services, s Regulatory Compliance continued... n dig crews have been paced untler one supervisor to take atlvanlage of economies when increases in emergency work wartanl and fo aHOrd Goss-training opportunities Addre55 Emergency Afler HOUrs n an Emergency Afler Hours n Pisral Responsibility Response Response Policy is being developed through the Drinking Water Quality n Customer SerNce Management System (DW~MS] Plan. a RegulatoryCOmpliance n Health & Safety of Workers Key Recommendations Elevate the Image Of the Water > rename the Water& Wastewater n Responsibility and Accountability 8 Wastewater $¢¢1100 section, the Environmental Services Section v Records Control & Documentation n report annually to Council on the section's achievements, highlighting the importance of the section's mantlale Key Recommendations Improve COmm001C21100 Within Communicelions will be improvetl nResponsibility and Accountability the Section Ihrpugh: a Customer Service n tlevelopmznf of a comrtunications plan that includes strategies focusing on internal antl exlemal communiptions > better tletlnetl roles, responsibilities, antl levels of authority through me new organizational structure, should help to provide clarity for staff > comprehensive training and soft skill tlevelopment for leatlership stag and aspiring leatlers Key Recommendations Address the Lack of Common v the mission statement tleveloped Responsibility and Accountability FocusNalu¢s will help provide focus for the sedion. v the key operating pdndples will farm a comrtwn basis for derision making moving forward r a preliminary values set has been recommended as the implementation process begins. AcoPOrate-wide values identification exerrise will be undertaken in late 2008. Key Recommendations Improve Morale and the Lack Of n better planned antl organizetl work Responsibility antl Accountability Teamwork through adtliticnal antl improved management will improve teamwork n the communiwlions plan will Identify internal communications melhotls inpacting rtprale and teamwodc for the better lie. tailgate discussions, planned work schedules etc.) v a new management approach will, over time, combat tlisengagement on the part of same s[aH Key Recommendations Increase Knowledge Regarding n atltlitipnal and better (raining, as a Responsibility and Accountability Core Services identi(eQ will help improve job knowledge r Health & Safely r crosst2ining, where appropriate. n Regulatory Compliance will be encouraged a rolalim of staff with more flexible positions will encourege well rounde0 knawletlge a resuming serNCes preNOUSIy contracted aut will, for same intliNduals, require brcatlening their knowledge base and learning new skills r develop a succession planning strategy o~,.om~.mrw MuniGral WOrka-epere4one WatB!-Wastewala! VlaRarnJrlls Existing Organizational emamasemeW Chart +.o..i. aa,°rlan. n..°.: m-:.-+m a+mnai Municipal D D Works w° Operations Water Wastewater Municipal Works Enviromental Services Division Niagara,F;alls Municipal Works Service Centre Operations Superintendent Environmental DWQMS ' ServIC@S Compliance Manager/ORO" coordinator Environmental Environmental Environmental Environmental Services Services Services Services Coordinator Supervisor Supervisor Supervisor Environmental services Lead Hand Lead Hand Preventative Locator Lead Hand Maintenance ~ Restoration Dig Crew Dig Crew Wastewater i Water Meter Backhoe Repairer (2) Preventative Backhoe OperatorRruck Backhoe Equipment Driver 2 Maintenance Operator/Truck OperatorlTruck Operator 2 Water Driver 2 Driver 2 'Environmental Sewer Services Clerk Sewer Equipment ~"USO (3) "~USO (2) ~~USO Equipment Helper Helper Service Centre Labourer Front Office ~ Seasonal Staff (3) Environmental Sewer (2) Services Pipelayer Lateral Maintainer (4) Maintainer (2) ~ Plumber Maintenance ~~~USO + Positions relocated from other sections Repair (Water Sampling) ORO -Overall Responsible Operator Person (3) USO -Underground Service Operator Leadership Positions- Levels of Responsibility Lead Hand Today Directs work teams Supervisor 1 Day to 3 Months s Day to day service delivery y Front line supervision Manager 3 Months to 1 Year Ongoing service coordination and delivery Superintendent 1 to 5 years Service development and overall coordination given division program and service priorities Environmental Services -Proposed Changes Manapero(BUibinB $arvkas EnNmnmenW SaMpea Overall msponsiMlitymrlbe ~ResponsiMliN, AanumaWiN .r lOperalbna Planner Manager/Overall RUponslCle sysl¢m; Operaror (ORO~ SudalnaMliry Mu5 MN a ceJi5cale ceual b whlpharlhan the dassdme Fisrel ResporaiMlity subsystem: R~WaloryOampiarca Operamr, with ceNfiare one doss bwar~~antne d~ssdme wbsyst¢m, mayassume Ws resporiMdlay mruprol5p Jays a yeast hadwp Mien ORO v.,tA Ne alMm Wok ¢palfiwtlors Is absent ar anode m ad. Environmental Services Proposed Changes Wakr or Waslawakr Envlmnmenml SaMaa Supervisan vAllMCross Resppnsbi5ly, AOZUnkMIiN $UpeMSOr $upeMaor sralr~edm ma~mpe both water 3fN W2dCNdiM plOal3nadM CYSlgnaf$a1VKC M1Nitip: Heats 85afeN of WaAers Enades R~penisors rtare fidJ time: RepMabry Gmglars CapadNlo hableim aseJ rtga4np regdremerts: Pm+mes forbmw gannig aM pryaleziiq of xod erc.; Miiwnun Le+el 11 cel$ficelion is regVlreJ. Environmental Services Proposed Changes LuO Hand fq ' EnWmnmandl SeMpe Leaf Qu LUtl HaM aosNw115 RespotaibilAY~Aavumadlily Hantl f9) b&tq OlswMnued In me wastewmerprevematlve Gabmer Servke maimenance area, az ro acs ~On site OlretlbnfullOme; HuI1h8Salery of WOMers Leatl HaM posAbn Eesctlgbn R~Jmory comglame Is bNnp roevaluatetl b more acolydle^/rt11BR posiuan respomibilNU; Dual ceAArauon Is repuretl, aNpLyh a Braoa PetloO MII M Given to IMlvkluals m wmgy. Environmental Services Proposed Changes flecartle Clark Envlronmenfal Servlaa Clerk RdopleCb Emuorcna'Yal C~mner5ervice Servlcesfiom MUniopal Wolhs oevdopmem5etlionbrcneR Aaoumagliry, ResporSiGlAy posabn fuirttlon Tlils posilbn tluvipYOn roll he mlMMlo better refletl Ilse actual posbbn. Water Meter RepalretlRl Water Meter Repalrerft~ There are aneltly M:o Wmx Feat Respmvbiftly Meter Repairer PusiAOre: GMpmff Service SamVAro haz been m pveE fmm th poshbn msportibilNes. Environmental Services -Proposed Changes Certlfletl SaMCa Malntalnar EnNmnmeMal SeMCec TNSInsi4on tlesaip4on w111 be ResponsibiHy. ACmumadliry Locator fEltll9]onlY. fo bd(er reflMlM1e aCUal posnbn. Cusbmer Service Plumber Plumber Rebcal~to Emimmneraal Cuslmner Service Services fiom Buipiiq Services Io reflH.i paS'NOnfuM1lOn ReslbMiGrM.AQlnmaMlify Sewer Fqulpment Helper (31 Sewer EpulPment Helper (31 TMa posiponvall be upgrabetl SwaainaHlM aM reaulrea DZ Licence Cuslomer5ervice WIII pnwbe backuplor Equipmatl Openrtat2 Environmental Services Proposed Changes SewerLMeMl MalnWner(1) EewerlaleMl Mmnlafrwr(xl ~~The PSSig2n[Se vLaleM Responsidliry, AOVUrdadlity Mairaainer pmNpn wil l DQ upgratleGbeSewar Later) CpAgner Service Mai~rtallwr pg51 W n to assume similarsHls aM respoMiMfNes MNis positlon. AseiMaM Sewer LaLeMI The Aealeaan[Sewer Lateral RespoMlbAM. AOnuMabilM MafMalner MalnUlrwr poekon willM OlsporMnueE. ae mtetl above. CuSaner Servk Environmental Services New Position Summary g - SewerlalerelMalnrelnarRruck UntleryreuM Service Operebr Tha Sower larerel RespersidlM. AanurnadlM OUVert pl MalnbinerRmpk OrHer2 poaHbn M1a Men tllwonpnuetl Cualomer Servke entl Il Me been replaatl wild a USO ppYlbnm pmNtle HealpBSafety of WOMen mare MxlblllM. UntlerBropntl Servke Operator A nex USO pogitlon pas been ReaponsidlM,Am~unladlM (1) uealeE laubenaiielM aaliy tlibnlm reslauas, Customer5ervire miuodgapical samgiry ela leatl teaWq. Healb85aery pfWO~kers Environmental Services New Position Summary EnvlrenmanUl Servlpa Four new poakon are beilq SaaallmdlM Malnlalnerl<I «emmmerede epafive ImplemerAalbn of Ne waist RepWalary Gxngia'ite pe+erfaWe mart narce pmpams. Emlmnmenfal $eMpg ResporabiNyb manapelM ReaponsldlM.A¢pmrtaWM CpoNlnalor bples,m9er,fmRORCB pYmM¢I; RemNe COnadaM OJLYmegalian OireCS Me 9aben~q aN mmgla0on olEmnon'neda Cisbmm Smite $aNlfea: RemNS anp moNlnates PSAB IMwmaYOn mlledipn. Changes to Compliment Staff Positions # Details Existing 5 Non•Union Proposed 6 New-Environmental Services Coordinator rtilir .5_ Existing 25 Relocated [o Envlronmenlal $ervl¢as s¢cllon- Union former RecoN Clerk, Plumber antl 3 Administrallve SlaH PropOSed 34 New 4 Environmental Service Maintainers and 2 USOs Dlscontlnuetl -1 Leatl Hand and Sewer Lateral Maintainer/rruck Driver 2 Financial Considerations Cost of Contracted Services -Water 2005 $292,600 5208,800 2006 $379,500 $203,100 2007 $453,500 $270,500 2008 $462,500 ~ 2009 $250,000 7 • Contracted services included hydrant replacement and leak detection. • Reliance on contracted services can be reduced to approximately $250,000 for 2009 through efficiencies gained by better planning, preventative maintenance and system knowledge. Financial Considerations Cost of Contracted Services -Wastewater 2005 $948,400 $632,600 zoos $1.oalAOO 51.oeas66 2007 $924,500 $1,013,900 2008 31,490,000 7 2009 51,240.000 ~ • Wastewater contracted services were mainly for emergency main and sewer lateral repairs, and SSET N inspections. • A cost reduction of $250,000, through undertaking work in-house that was previously contracted out, is expected in the 2009 Wastewater Budget. Financial Impact Analysis of work load versus labour costs revealed that there was a shortfall in the Water section, and capacity in the Wastewater section Cost savings will result from efficiencies and more effective allocation of manpower resources Increase in labour/benefit costs resulting from the reorganization will be approximately $385,000, which will be offset in savings in the amount of contracted services ~ Water or sewer rate increases will not be required to fund new service levels t Reduced reliance on contracted services will result in estimated savings of over $400,000 /year Conclusion Implementing the recommendations of the Service Delivery Review will result in: v Amore responsive organizational structure, suited to the needs of the Environmental Services section Consistent, better quality service, informed by customer feedback and monitored through performance measures v Enhanced levels of service, and a better maintained water & wastewater system, resulting in longer system life expectancy and requiring fewer emergency repairs over time Improvements to the organizational culture No additional cost to the Corporation Implementation Plan Initial Steps x September 2008 Service Delivery Review Report to Council & approval of additional positions (September 22) Environmental Services Section is established Posting of new positions -internal and eMernal v October 2008 Referral of all Water & Wastewater positions to JJEC Comprehensive training for leadership positions commences Environmental Services Communications Plan in place v November 2008 Hiring of individuals for new leadership positions s January 2009 JJEC completes review Recommendations for Council's - Consider-ation - - v That the recommended changes for the operation of the Water/Wastewater section, as set out in this report (CAO-2008-04), be approved v That staff be authorized to move forward with implementation September 22, 2008 MW-2008-57 Councillor Carolynn loannoni, Chair and Members of the Community Services Committee City of Niagara Falls, Ontario Members Re: MW-2008-57 City of Niagara Falls Rail Line Ad Hoc Committee Terms of Reference RECOMMENDATION That Council appoints a member to service on the Rail Line Ad Hoc Committee 1) That the terms of reference be amended to allow up to 3 citizens and accepted; 2) That Mr Red Iseppon be appointed as one of the citizen representatives; and 3) That Councillor Thomson be appointed as the Council representative. BACKGROUND• Mandate The Committee will be an Ad Hoc Committee of Council. Their mandate is to pursue the rerouting of the CN trains that currently operate through the built up area of the City of Niagara Falls. The objective to be achieved in rerouting of the trains is to reduce the traffic delays experienced at the various level crossings for the traveling public and emergency services The rerouting will also eliminate the need for the construction of the grade separations in the urban area of the City of Niagara Falls Term As an Ad Hoc Committee, the committee's term is finite The committee will cease when either the mandate of the committee is fulfilled or it becomes apparent that the goal of the committee is cannot be achieved Authority The committee is an advisory committee to Council. It has no power in and of itself The committee will make recommendations for Council's consideration The committee may provide status reports at regular intervals to keep Council apprised Working Together to Serve Our Corr:u:uuity Community Services Department Municipal Works September 22, 2008 - 2 - MW-2008-57 Membership The Committee will include the Mayor, one member of Council and one member of the public. The members of the Committee will be approved by Council. The Committee is to be chaired by the Mayor Staff Support The City's Transportation Division will provide professional and administrative support for the Committee. Meeting Format Meetings will be held at the call of the Chair The agendas and minutes will be prepared by the staff representative from the Transportation Division. Meetings will be called on an as required basis. Work Program The following list, although not exhaustive, lists the major tasks required in order to begin the process of having the CN trains rerouted. 1 Meet with representatives from CN 2. As rail operations are governed by the Federal government meetings will have to take place with staff from Transport Canada and the MP representing the City of Niagara Falls. 3 The rerouting may involve a change in which bridge crossing is used over the Niagara River Accordingly, the Committee will have to deal with the appropriate Canadian and US government agencies responsible for border security 4 Rerouting of trains will involve the use of tracks owned by CP Rail and possibly other rail companies. Hence meeting with those rail companies may be required Recommended by Ed Dujlovic, Executive Director of Community Services M`%y/ Gt Respectfully submitted n MacDonald, Chief Administrative Officer S:\REPORTS12008 ReportsSMW-20D8-57 -Rail Line Ad Hoc Committee -Terms of Reference.wpd September 22, 2008 MW-2008-46 ~TIl~~~m~~alIs c~~u~D,t Councillor Carolynn loannoni, Chair -and Members of the Community Services Committee City of Niagara Falls, Ontario Members Re. MW-2008-46 2008 Loose Leaf Collection Program RECOMMENDATION 1) That Council receive this report for information, and 2) That Council direct staff to investigate the delivery of this program. BACKGROUND• Municipal Works staff has finalized the schedule for the 2008 Leaf Collection program and will be commencing the first pass starting the week of October 20, 2008 This service targets some of the older residential areas where some of the City's more mature trees are located The collection program is broken down into twelve (12) areas that will be visited twice over an eight-week period The success of the program is dependent upon a number of factors that are beyond the control of City staff and as a result this service is supplementary and not intended to replace the weekly curbside Leaf and Yard Waste services currently provided by the Region of Niagara This program was successful in the removal of approximately 400 tonnes of leaf and yard waste over and above the bagged leaves collected by the Region As you are aware, the Region of Niagara has recently modified their Leaf and Yard Waste Collection Program as of September 1, 2008 and are no longer accepting organic waste in clear, orange or green plastic bags. They are, however, encouraging the use of rigid metal or plastic containers and/or Kraft paper bags designed for leaf and yard waste. This decision is consistent with a recent City Council resolution on September 8, 2008 directing staff to play a leadership role in educating residents to reduce and strive to eliminate their use of plastic bags Working Together to Serve Orer Community Community Services Department Municipal Works September 22, 2008 - 2 - MW-2008-46 It should be noted, however; that we have experienced challenges with the Loose Leaf Collection Program in the past related to the following; • the onset of cold and/or wet weather affects the efficiency and effectiveness of the vacuum equipment, • planning the start of the collection program to match the time at which the majority of the leaves have fallen to the ground, • informing residents as to when the collection equipment will be completing work in their immediate area, • leaves being placed on the roadways and blocking catch basins and drainage outlets, • confusing information regarding the City's program versus the Region's program, • requests to extend this service to other areas of the City Given the fact that this program is expected to be provided by residents next month and the recent changes to the Region's program, staff is recommending that the City provide this service for one more year and that staff be directed to investigate feasibility of continuing the service For the information of Council, funding in the amount of $122,000 is included in the 2008 Operating Budget for this program which includes approximately $77,000 in labor and $45,000 in vehicle costs. Recommended by Geoff Holma , Dir ctor of Municipal Works Approved by• Ed Dujlovic, Executive Director of Community Services Respectfully submitted 2 ai, n MacDonald, Chief A ministrative Officer S:\REPORTS12008 ReportslMW-2008-46 -Loose Leaf Collection Program.wpd I ' 'Don t Ler Your Leaves 4o fio Nlashe~ Niagara,Falls 2008 Leaf Collection Program µo~„zn,NPO ~ ° m 'Q,p 5y oQrt Loose Leaf Pick-Up - Only in the shaded areas of the map NOT GUARANTEED -WEATHER DEPENDENT ~a 8 The equipment leaf collection program is one of the biggest challenges for your Municipal ~ ~J ~ > 't° Works Department. The challenge consists of staying in advance of Mother Natures blend of m ~ R falling leaves in large volumes and possible freezing temperatures and snow. If we experience cold or snow, leaves will not be picked up. Only the shaded areas of the map may receive two pick-ups. Leaf collection i ill begin in Area 1 and continue through to Area 12. G THpRO1°RO ~E~GERa""E s First Pass Oct. 20`" to Nov. 14`h & Second Pass Nov. 17`" to Dec. 12`h ~ 55 i ~ ~ SRICGE ST This method of pick-up is meant for large quantities of leaves only If you live in the shaded ° areas, but only have a small amount of leaves, please put them out for container pick-up ~ .wRRS°n sT o M°RRiscR sT ~ instead. Rake leaves close to the road. but not on the road. If you miss the loose leaf ~ y`r~Y W"Y I ' collection crews cannot return! In this case please use the container/bag pick-up. ,fo /SRO hWY RGSERTS~ST ~ Areal N Leader Lane E River Roatl BF~yE~+ S Highway 420 W Vdoda Ave 4~ FERRY ST Container Area 2 N Highway 420 E River Road wRGr 94~NE I_ ? S McLeod Road W Stanley Ave ~ ~ ~x'+i~ 2 Piekupis Area 3 N Lundy's Lane E Stanley Ave \ ~ r ~ Guaranteed S Dunn Street W Dorchester Road ~ ?j ~ z N Mountain Road E Dorchester Road z ~ Gunn sT Area 4 z ° uu S ThorddstoneRoad W QEw ~ 10~~ ,,Pkh N Mountain Road E Portage Road ~ ° Area 5 S Thordd Bone Road W Ddrehester Road ¢crEGG-RG z HyO,a Area 6 N Mo i main Road E Stanley Ave 12 o pGRr~Oe x° ~qt4} S Thordd Stone Roed W Portage Road a N Lu nldy's Lane E Dorchester Road Area 7 S McLeod Road W 4L=VJ ~ \ Area S N Thordd Stone Road E Drummond Road ~ x`77 S Lundy's Lane W Beaverdams Roed AFea 9 N Thadd Bone Road E Stanley Ave S Ferry Street W Drummond Road ~ Area 10 N Durin Street E Stanley Ave ~ S Mcleod Roatl W Dorchester Road yyd+a Area 11 Vllage of Chippawa. Leaf Collection Hotline - 356-7521 ext. 5800 Area 12 N McLeod Road E Chippewa Parkway Check the Hotline for the area crews are working in. S Stanley Avenue W QEW i Area designatio s have been determined by leaf volumes. 1~ September 22,2008 MW-2008-53 ~Il~~~I~~t~a1~S cnnao~ - - - Councillor Garolynn-loannoni, Chair and Members of the Community Services Committee City of Niagara Falls, Ontario Members. Re: MW-2008-53 Revisions to Contract 2008-205-08 2008 New Sidewalk Program RECOMMENDATION 1 That staff be directed to proceed with the proposed modifications as stated below 2. That the unit prices submitted by Sacco Construction Ltd be accepted and ratified at the Council meeting later this evening 3 That the Mayor and City Clerk be authorized to execute the necessary agreement. BACKGROUND• On January 28, 2008 Council approved the 2008 New Sidewalk Program (MW- 2008-03) at the following locations: SIDEWALK LIST Paddock Trail Drive crossing the Hydro Right-of-Way Warden Avenue from Bonnie Street to Margaret Street Windermere Road from Isaac Street to Camrose Street Windsor Crescent from existing sidewalk to Royal Manor Drive Wentworth Avenue from Murray Street to Symmes Street Staff informed the residents in the affected areas by way of written letter and have received a considerable amount of feedback. In compiling this feedback, staff has determined that modifications should be made to two locations from the list shown above f W ol'king TogetJteY to Serve OuY Cotlt lttt771ity j Community Services Department Municipal Works t _ r ~pVJlX~ui~UYbIJ:lJ w•s-0'^"atiY"a°~~eR~..O '1 September 22,2008 - 2 - MW-2008-53 Wentworth Avenue. • five out of eight residents responded negatively regarding the proposed construction of a new sidewalk. • based on this negative feedback, staff has notified all residents that Wentworth Avenue_has_been_removed-from-this_year's-program.-- - - - - - - Windsor Crescent: • three out of four residents in the affected area requested the proposed sidewalk be moved to the opposite side of the road • staff has revised the original design to show the proposed sidewalk on the east side of the east leg of Windsor Crescent. As a result of these changes staff has established a need for additional streets requiring new sidewalk at the following locations: Kolar Road • due to safety concerns and based on numerous calls from residents at 4300 & 4336 Kolar Road, sidewalk was identified as being required in front of these properties. • it was determined that funds previously secured through the Marisa Subdivision are available to finance this missing sidewalk link. McLeod Road: • Mr John Dancevic of 8943 McLeod Road has requested the City to extend the existing sidewalk westerly from 8903 McLeod Road to coincide with his proposed lot improvements at the corner of Garner and McLeod • staff has determined that a transfer of land between Mr Dancevic and the City is required prior to the construction of the sidewalk extension. Union Avenue: • Union Avenue between Kitchener Street and Hunter Street was officially closed off as a result of the adjacent redevelopment creating missing sidewalks links on Kitchener Street and Hunter Avenue. As a result of these changes and to expedite the construction in a timely manner, the 2008 New Sidewalk Construction Program was tendered on Tuesday, September 2, 2008 with the following results: The Tender Opening Committee, in the presence of the City Clerk, Mr Dean lorfida, opened tenders on Tuesday, September 16, 2008 at 1.30 p.m. forthe above noted contract. September 22,2008 - 3 - MW-2008-53 Tender documents were picked up by five (5) Contractors and three (3) bids were received Listed below is a summary of the totaled tendered prices, excluding GST, received from the Contractor 1 Sacco Construction Niagara Falls $ 45,874 00 2. Alfidome Construction Ltd. Niagara Falls $ 48,249 00 3. Steed & Evans Niagara Falls $ 57,151 00 The lowest tender was received from Sacco Construction in the amount of $45,874 00 This contractor has previously performed similar type projects for the City We are of the opinion that this contractor is capable of successfully undertaking this project. The engineer's estimate for this contract was $ 50,000 00 Project Costs. Awarded Contract (excluding GST) $ 45,874 00 Total $ 45,874.00 Funding: New Sidewalk Construction $ 220,292.00 Total $ 220,292.00 The funding for this contract was provided from the 2008 New Sidewalk Program budget (Account No. G/L#12-3-310006-030000). This project is scheduled to commence construction September 29, 2008 and all work is to carry through until November 21, 2008 Council's concurrence with this recommendation wo Id be appreciated V Recommended by Geoff Holm n, Dire or of Municipal Works Approved by' 1 Ed Dujlovic, E/ utive irector o Community Services Respectfully submitted `~'G ~L, o n MacDonald, Chief Admi istrative Officer C. McLeod C:INoveIllGroupWisel.lMW-2008-53_Revisions to 2008 New Sidewalk Program.wpd September 22, 2008 TS-2008-48 ~ll~~~]Y'~l~'~d~IS cnvnDn Councillor Carolynn loannoni, Chair and Members of the Community Services Committee City of Niagara Falls Ontario Members Re. TS-2008-48 Feasibility of Reopening Main Street Environmental Assessment RECOMMENDATION For the information of Committee and consideration in the 2009 budget. BACKGROUND• This report is further to a motion executed at Committee's June 9, 2008 meeting for Staff to investigate the feasibility of reopening Main Street at Stanley Avenue. Evaluating the reopening of Main Street would require the initiation of an Environmental Assessment that would identify and evaluate alternatives including a do-nothing scenario through a technical assessment and public input. Environmental assessments must take into account all feasible alternatives rather than just focusing on one option. In fact, an Environmental Assessment commences with the identification of a problem statement or opportunity by which the study will be based upon, before formulating alternative solutions Stakeholder and public input along with input from technical review agencies remains an integral component of all environmental assessments in establishing a preferred solution. Alternatives are evaluated through an evaluation matrix, with no assumption of a predisposed outcome. Thus, the preferred alternative may range between a "do nothing" scenario to geometric road work revisions The original Main Street Environmenta{ Assessment study was initiated to rectify several operational and safety deficiencies at the Stanley Avenue and Main Street intersection including: • insufficient capacity to handle future growth, • lack of left turn lanes on Stanley Avenue, • complexity of operations with six approach legs; • severe intersection skew angle and sight distance issues; • mix of signal control for Main Street and stop controls on the Dixon Street approaches; and,~~ Community Services Department ,s:" i Transportation Services Working Together to Serve Oztr Cotszmtuzity September 22, 2008 - 2 - TS-2008-48 • an exclusive pedestrian phase was required across the whole intersection This meant that all vehicular traffic faced a red signal indication while pedestrians were afforded their own crossing time diagonally across the intersection. The preferred alternative of the previous Environmental Assessment consisted of geometric changes at intersections. Also included, was the installation of additional signs along Main Street for redirection to specific businesses and th_e renaming of_Main_Street. _ _ Construction and signage have been completed, however, the renaming of Main Street has yet to be undertaken. Should another Environmental Assessment be carried out the renaming of Main Street may be premature The Region of Niagara is not supportive of reopening the intersection of Main Street and Stanley Avenue to allow full movements, and has no desire to reexamine the intersection at this time Therefore, should the city wish to reexamine the traffic operations through the initiation of an Environmental Assessment the cost would be borne entirely by the City A cost estimate received from Totten Sims Hubicki for the Environmental Assessment is $65,611 00 This estimate includes five combined meetings with stakeholders and public agencies. However, it is foreseen that additional meetings will be required with individual stakeholders similar to the initial Environmental Assessment. Therefore, a more realistic estimate is considered to be $70,000 00 This cost does not include work for Part II Orders. The above information has been provided to Committee fortheir consideration The above project may be considered in the 2009 Budget. Recommended by Karl Dren, Director of Transportation Services S Approved by ~ Ed ujlovic, xecutive Director of Co ~ unity Services Respectfully submitted: 1 J n MacDonald, Chief Administrative Officer T.1General AdministrationVGA 1.01 Reportsl2008 Community Services109 Sep 22US-2008-48 Main Street EA Reopening.wpd