2010/01/251) Approval of the December 14, 2009 Community Services Minutes.
2) REPORTS:
FIRST MEETING
Monday, January 25, 2010
4:00 p.m.
City Hall, Committee Room #2A & B
STAFF CONTACT:
a) TS- 2010 -07
Tourist Area Parking Demand Study Karl Dren
b) MW- 2010 -03
Mewburn Road Bridge
(Mewburn Road - Concession 6 Road) Geoff Holman
c) MW- 2010 -01
Tender #2009 - 179 -06 Downtown,
Infrastructure Revitalization - Phase 1 Geoff Holman
d) MW- 2010 -06
Sidewalk Winter Maintenance
Service Requests and Policy Review Geoff Holman
e) TS- 2010 -13
St. Clair Avenue Tourist Bus Loading Zone Karl Dren
f) TS- 2010 -02
Park Street — Traffic Operations Review Karl Dren
g) TS- 2010 -03
Forestview Boulevard and Kalar Road
Traffic Operations Review Karl Dren
h) TS- 2010 -04
Kalar Road — Parking & Bicycle Lane Review Karl Dren
i) TS- 2010 -06
McLeod Road — Speed Limit Review Karl Dren
j) TS- 2010 -08
Authority for the Temporary Installation of Regulatory Signs Karl Dren
Community Services Committee - January 25, 2010
k) PRC- 2010 -01
Proposed 2010 Cemetery Fee Schedule Karl Dren
1) PD- 2010 -03
Commercial Building & Facade Improvement Application
5841 -5845 Ferry Street
Hillside Holdings Inc. (Emidio Maroti and Peter Conte) Alex Herlovitch
m) PD- 2010 -04
Commercial Building & Facade Improvement Application
5894 -5900 Main Street
1302771 Ontario Ltd. (Adam Newington) Alex Herlovitch
n) PD- 2010 -05
Commercial Building & Facade Improvement Application
6036 Main Street
1254552 Ontario Inc. (Victor and Anthony Fraone) Alex Herlovitch
o) PD- 2010 -06
Commercial Building & Facade Improvement Application
6022 - 6026 Main Street
1254225 Ontario Inc. (Victor and Anthony Fraone) Alex Herlovitch
p) PD- 2010 -07
Commercial Building & Facade Improvement Applications
5769 Ferry Street
2211257 Ontario Inc. (Chris Rudan) Alex Herlovitch
3) NEW BUSINESS:
4) ADJOURNMENT:
a) Resolution to go into Closed Meeting.
► ESSI +
Seventeenth Meeting, Monday, December 14, 2009, Committee Room #2, 6:15 P.M.
PRESENT: Councillor Carolynn loannoni , Chair; Mayor Ted Salci, Councillors Jim
Diodati, Shirley Fisher, Vince Kerrio, Bart Mayes, Wayne Thomson,
Janice Wing and Victor Pietrangelo.
STAFF:
MINUTES OF COMMUNITY SERVICES COMMITTEE
Ken Todd, Ed Dujlovic, Ken Burden, Geoff Holman, Dean lorfida, Ken
Beaman, Todd Harrison, Trent Dark, Serge Felicetti, Denyse Morrissey,
Alex Herlovitch, Karl Dren, Lee Smith, Kathy Powell and Steno -
Marianne Tikky.
GUEST: Gary Beck, 483 Wing RCAFA, 9200 Sodom Road, Niagara Falls, Jim
Doherty, 483 Wing RCAFA, 6039 St. Anthony Crescent, Niagara Falls.
PRESS: Corey Larocque, Niagara Falls Review.
1 MINUTES:
Niagara Its
MOVED by Councillor Fisher and seconded by Councillor Kerrio the minutes of the
November 30, 2009 meeting be adopted as recorded.
Motion: Carried
Action: Recommendation submitted to Council December 14, 2009.
2. REPORTS:
a) MW- 2009 -86
Niagara Falls Armoury
MOVED by Mayor Salci and seconded Councillor Pietrangelo;
1. That the Niagara Falls History Museum (former Lundy's Lane Historical
Museum) be permitted to operate temporarily from the Niagara Falls Armoury
during the construction phase of the Museum expansion project from January
2010 to end of construction phase of the project.; and
2. That the City enter into a lease agreement with the Niagara Falls Military
Museum.
Motion: Carried
Conflict: Councillor Wing
Action: Recommendation submitted to Council December 14, 2009.
MOVED by Councillor Fisher and seconded by Councillor Mayes;
1. That Council approve the revised Arena Payment and Cancellation Policy.
2. That the revised Arena Payment and Cancellation Policy be effective January
1, 2010.
Motion: Carried
Action: Recommendation submitted to Council December 14, 2009.
PRC- 2009 -35
Gale Centre Arena Construction Update
MOVED Mayor Salci and seconded by Councillor Diodati that the Gale Centre
arena construction update report be received for information purposes.
Motion: Carried
Action: Recommendation submitted to Council December 14, 2009.
d) BDD- 2009 -05
2010 Pan American Games
-2-
b) PRC- 2009 -36
Revised Arena Payment and Cancellation Policy
MOVED by Councillor Thomson and seconded by Councillor Wing that Council
authorize the Mayor and City Clerk to sign the 2015 Pan /Am Games Joinder
Agreement.
Motion: Carried
Action: Recommendation submitted to Council December 14, 2009.
e) TS- 2009 -52
Vehicle Replacement, Niagara Chair -a -Van
MOVED by Councillor Pietrangelo and seconded by Councillor Diodati;
1. That Council pre- approve the 2010 purchase of a Niagara Chair -A -Van vehicle
with the lowest bidder Overland Custom Coach; and,
2. That the Mayor and City Clerk be authorized to enter into an agreement to
purchase.
Motion: Carried
Action: Recommendation submitted to Council December 14, 2009.
f) PD- 2009 -99
CB &FIG -2009 -013, CB&FIG-2009-014 and
CB &FIG - 2009 -015 4532 -4534 Queen Street,
4544 Queen Street & 4536 Queen Street
Applicant: Argiri Rigas
MOVED by Councillor Thomson and seconded by Mayor Salci that the Council
approve the three applications for Commercial Building and Facade Improvement
Grants subject to considering the properties as different parcels and satisfying the
Downtown CIP program requirements.
Motion: Carried
Action: Recommendation submitted to Council December 14, 2009.
g) PD -2009 -101
CB &FIG- 2009 -016, Commercial Building & Facade
Improvement Grant Application
Applicant: 1049474 Ontario Inc. (Anthony Kreze)
4529 -4531 Queen Street
MOVED by Councillor Diodati and seconded by Councillor Pietrangelo;
1. That the Commercial Building and Facade Improvement Grant Application for
4529 -4531 Queen Street be approved subject to the owner satisfying the
program requirements and,
2. That the Mayor and City Clerk be authorized to execute the grant agreement.
Motion: Carried
Action: Recommendation submitted to Council December 14, 2009.
4) ADJOURNMENT:
-3-
MOVED by Councillor Pietrangelo and seconded by Mayor Salci that Committee
adjourn to at 6:28 p.m. and enter into an In- Camera Session.
N agira,jl M
C.h�SDA
REPORT TO:
SUBMITTED BY:
SUBJECT:
RECOMMENDATIONS
Councillor Carolynn loannoni, Chair
Members of the Community Services Committee
City of Niagara Falls, Ontario
Transportation Services
TS- 2010 -07
Tourist Area Parking Demand Study
TS- 2010 -07
January 25, 2010
1) That the Tourist Area Parking Demand Study be adopted.
2) That staff proceed with the public process to amend the Zoning by -law to
incorporate the new parking standards and recognize existing approvals (built and
unbuilt) through site specific provisions.
3) That the Official Plan be amended to eliminate the submission of Parking Demand
Studies to rationalize further reductions to parking requirements.
4) Parking Demand Studies continue to be accepted for land uses not surveyed.
5) Developers will continue to have the benefit of contributing toward cash -in -lieu for
parking if unwilling or unable to provide the required parking, subject to the property
being located within an approved cash -in -lieu area.
EXECUTIVE SUMMARY
The Parking Demand Study authorized by council was undertaken to assess actual parking
needs in the tourist area and was commissioned in response to parking reduction requests
for new applications. Thus, in lieu of developers having to provide site specific parking
studies to justify a reduction, over 3000 field surveys were conducted to obtain the
parking /travel modes of patrons visiting over 50 establishments. The surveys were carried
out over 3 tourist peak seasons. The results of the study indicate that the parking
requirements for the majority of land uses in the tourist area are over - represented in the
current zoning by -law. Therefore, the majority of developments will benefit by applying the
new rates. There is however one land use, hotels /motels, where the parking requirements
may be somewhat higher. These rates, however are justified and validated through the
surveys and represent the needs of our tourist community. To provide additional parking
relief for hotels /motels a bus substitution has been introduced and is encouraged as a form
of Transportation Demand Management.
Transportation Demand Management (TDM) is a general term for various strategies that
increase transportation system efficiency. It emphasizes the movement of people and
goods, rather than passenger passenger cars and gives priority to more efficient modes
(such as walking, cycling, public transit, ride sharing) particularly under congested
conditions. Managing parking availability, both public and private is one method of
� I4Y�:'� . k1a_n 'i Y h , £ 3 __ k . ,t °.
l and Use; Category Proposed parking Ra te PFOpcsed
Rats' Change
Restaurants 1 space per 5 seats 1 space per 10 seats 4,
Retail store 1 space per 25 m 1 space per 60 m
Motel
Hotel
Motel
1 space per 1.3 rooms
Hotel
1 space per 2.0 rooms
1 space per 10 seats
1 space per 5.5 m
assembly
1 space per 25 m2
substitution currently not
available
Base Room Rates for Motel
= T
t
4,
4
New
1 space per 1.25 rooms
Base Room Rates for Hotel
1 space per 1.25 rooms
Ancillary Restaurant
< 300 seats = no additional spaces
> 300 seats = 1 space per 15 seats
Ancillary Meetinq /Convention
Room
< 1400 m = no additional spaces
1 space per 66 m for 1400 m
AncillaryRetail Area
no additional spaces
Bus Parking Space Substitution
1.0 bus parking space = 20
passenger cars parking spaces.
Maximum substitution of 40
spaces.
Museum 1 space per 50 m 1 space per 150 m 4,
Tattoo parlor 1 space per 40 m - 1 space per 2 seats N/A
Amusement game **
establishment
1 space per 5 person
lawfully occupied
1 space per 75 m
N/A
Theatre /cinema 1 space per 5 seats 1 space per 10 seats ,I,
January 25, 2010 -2- TS- 2010 -07
transitioning towards and encouraging alternate travel modes ie. transit, walking etc.
Again, as previously stated, the results of the surveys indicate that the parking requirement
in the tourist area is typically Tess than the current Zoning By -law requirements. This is
primarily due to the concentration of establishments which in turn encourage drivers to park
in one location and walk to various sites rather than driving to each site. Therefore
statistically, each establishment is responsible for a portion of a parking space, rather than
having to provide what would typically be one full parking space. This is the prime factor
in justifying the lower parking requirement in the tourist area, and is reasonable given that
the majority of establishments are not destinations in themselves.
The recommended parking rates for the tourist core as defined by the attached study area
drawing is summarized in the following table:
N/A - Comparison not available due to unit type difference
** The Amusement game establishment category has been amended since the previous report to reflect a requirement
of 1 parking space per 75 square metres from 30 square metres.
BACKGROUND
Further to report TS- 2009 -02 Tourist Area Parking Demand Study presented to Committee
on April 20, 2009 a public meeting was subsequently held on June 17. Five members
from the public, several staff members and a representative from the consulting firm Totten
January 25, 2010
-3- TS- 2010 -07
Sims Hubicki attended the meeting to answer questions and address concerns. Following
the public meeting, correspondence was received from the legal firm of Sullivan Mahoney
suggesting revisions and additions to the recommended parking requirements for
developments, in lieu of what was presented on April 20, 2009. The correspondence
received consisted of eight (8) suggestions as noted in their attached letter.
Upon reviewing the suggestions /comments staff have the following responses to the eight
(8) comments:
1. The request to revise the definition of "Gross Leaseable Floor Area" may better be
addressed through a Zoning Bylaw amendment which is in currently in draft form,
as this definition would be applicable Citywide, and would not be specific to this
study.
2. A rate for uses defined as an "amusement game establishment" was developed
and calculated at 1 space per 75 square metres.
Developers will still have the option of submitting Parking Demand Studies for uses
classified as "amusement park" type activities. Given the multitude of potential
variables in this category, it is virtually impossible to provide an overall parking rate
for the category. Instead an analysis of each amusement ride /activity will need to
be carried out with attention to ride /activity duration, capacity for a peak hour
operation, and overall park area to assess circulation and the interactivity of the
proposed rides /activities.
3. The resulting rate for the two restaurant classifications was:
a. Fast food - restaurant offering only counter service: 1 parking space per 12.1
seats.
b. Quality food - restaurant offering table service: 1 parking space per 7.8
seats
The aggregate rate of both restaurant type classifications is 1 space per 10 seats.
Adopting an aggregate rate rather than separating the rates results in a more liberal
rate as the majority of restaurants in the area provide table service. Furthermore,
separate rates would require developers to identify the restaurant classification type
during the site plan and /or zoning application approval process, often which is not
identified or known by the developer until later in the process.
4. Hotel developments that have previous site specific zoning approvals, but are
currently unbuilt, can be addressed during the implementation stage where new
parking standards are to be introduced. The approach which will be advanced to
the public meeting stage is that any pre- existing site specific zoning will have a
special provision which will include parking ratios for hotel rooms, meeting rooms
and restaurants at the current 79 -200 rates. In the event the site specific zoning
contained a special parking ratio or exempted certain uses from providing parking
these will be brought forward. The revised standards will also be added a a special
provision giving the developer the choice of using whatever standard is less at the
time of building permit.
January 25, 2010 -4- TS- 2010 -07
5. The 2 -bus parking space substitution in lieu of 20 parking spaces per bus, resulting
in a maximum of 40 Tess parking spaces is included as a strategy to promote Travel
Demand Management (TDM) and to encourage alternate modes of transportation.
At this time, our surveys indicate that the majority of patrons do still arrive to hotels
by passenger cars in the peak tourist season. Thus providing an arbitrarily higher
or unlimited bus substitution rate not supported by studies, is n'ot considered
prudent at this time, as there is insufficient evidence to support a modal shift
towards even more bus travel during the peak season. Implementing an arbitrary
number may result in a parking shortage at hotels during the peak season of July
and August when the majority of passenger cars periods. Therefore, until there is
a mode shift towards higher bus travel to hotels during the peak period, the 2 -bus
parking space substitution is equitable. In the future, when and if a mode shift
occurs and is justified through studies, the bus substitution rate could at that time
be reconsidered.
6. Any property which has site specific zoning and which had been constructed (in
whole or in part) can be recognized through site specific provisions including current
parking requirements under 79 -200. The approach which will be advanced will be
to include site specific provisions for parking rations at the current 79 -200 rates for
all rooms, restaurant seating and meeting space at current ratios. This will ensure
the operation remains a legal use and does not create a legal non - conforming
situation. An application for building permit(s) to achieve full build -out of the site as
permitted under zoning will be subject to the site specific zone provisions of the site.
Any new rezoning application for expansion will be considered under the zoning
provisions in place for the site at the time the application is submitted.
7 The collected data indicates that a 300 -seat restaurant within a hotel was the
threshold which separated ancillary use eateries from a destination type restaurant.
A destination restaurant is expected to attract hotel guests, walk -by traffic as well
as a number of patrons from the community that choose to drive specifically to the
restaurant. Thus, the parking rate of 1 space per 15 seats is applied to all seats in
the restaurant given the anticipated patronage. Smaller eateries, with less than
300 seats are relieved from providing parking as their patronage is expected to
primarily consist of hotel guests and walk -by traffic.
A stand -alone restaurant rate is proposed as 1 parking space per 10 seats.
Recognizing that a destination restaurant located within a hotel attracts patrons
staying within the facility as well as outside patrons, the corresponding ratio is 1
parking space per 15 seats. Thus, larger restaurants within hotels still benefit by a
reduction of an additional 50% in comparison to standalone restaurants. The same
rationale was applied to conference facilities exceeding 1400 square metres in size.
8. Findings from our studies indicate that results tend to widely fluctuate when
individual site specific parking studies are carried out. Fluctuations in study results
occur due to a variety of reasons, such as study day, study month, weather
conditions etc. The parking rates proposed in this report are weighted averages of
several studies that were carried out at the same locations for various land uses and
are thus considered to be more accurate than results from one study alone.
Therefore, unless a specific land use has not been surveyed, there is no reason for
January 25, 2010 -5- TS- 2010 -07
accepting site specific parking studies, as sufficient data is available. However, for
land uses that have not been surveyed, developers will continue to have the option
to submit Parking Demand Studies.
A meeting was held with Ms. Gilberti, Planning and Transportation staff in January.
Discussions revolved primarily around the implementation of the by -law and the impact to
specific developments. Ms. Gilberti stressed that the following conditions were of
significant importance.
1. Developments with existing approvals, that are not yet built should be able to use
the parking standards in either 79 -200 or the new standards, whichever is less.
2. Until the new standards are formally adopted in the zoning by -law, developers will
still have the opportunity to use the standards in 79 -200.
3. The new standards apply only to the expansion of a future development.
4. The 2 -bus parking space substitution in lieu of 40 passenger cars be in increased
to 5 bus spaces for larger hotels based on a prorated system dependant on the
number of hotel rooms.
5. Bus parking spaces may be accommodated in off -site lots.
6. The parking standard of 1 space per 15 seats for restaurants in hotels exceeding
300 seats, should apply only to the number of seats over 300, with the first 300
seats requiring no parking spaces.
The response to Sullivan- Mahoney addresses several of the above issues. In general,
staff is supportive of Ms. Gilberti's requests # 1 through #3. Staff is also supportive of #5
subject to the development having off -site parking tied through zoning to the hotel
development. Staff is unable to support #4 and #6 at this time, given the results of the
study.
ANALYSIS /RATIONALE
Developments in all land uses other than hotels /motels will unquestionably benefit by the
new rates. This is reasonable given that these facilities are not "destinations" in
themselves. Alternately, land uses that are more of a "destination" source tend to not
benefit greatly ie. Hotels and motels (particularly those with limited ancillary uses) as the
rate for rooms has increased from 1/2 parking space per room to .80 parking space per
room. However, the room rate is offset by the elimination of a corresponding parking ratio
for each ancillary use in hotels /motels ie. Retail, restaurants with 300 seats or less,
breakfast areas etc. Also, to further reduce the parking requirement at hotels /motels, a
substitution of 40 parking spaces is available if 2 bus parking spaces are provided.
Although it is recognized that the majority of patrons still travel to hotels via passenger cars
during the peak season, the substitution is a method of encouraging alternate modes of
transportation by incorporating a Transportation Demand Management strategy.
The following chart provides examples of various existing hotels, and the respective
number of parking spaces currently required under by -law 79 -200. (Given the information
January 25, 2010 -6- TS- 2010 -07
on the site plan used). Also, the number of parking spaces based on the new standards
are provided, which also capture the 2 -bus substitution (subtracting 40 parking spaces),
under the heading "with bus substitution ". These are examples only to show the
difference in parking standards. There is no intention to request existing establishments
that are built to comply with the new standards should they show an increase in parking
requirements. However, if the existing property benefits from a lower rate, an opportunity
to use the new standards will be available when adopted.
Facility
Cash -in -Lieu Overview
By -law 79 -200 vs. New Standards
Parking Requirement Examples
Parking Requirements Parking Requirements
Based on 79 -200 Based on New Standards
Without Bus Substitution With Bus Substitution
Difference Difference
Imperial Hotel 110 114 +4 74 -36
Clarion Hotel 131 153 +22 113 -18
Sheraton Fallsview 380 312 -68 272 -108
Westin 328 414 +86 374 +46
Best Western 119 129 +10 88 -31
Doubletree 199 179 -20 139 -60
Days Inn 147 111 -36 71 -76
Embassy Suites (Phase 1) 337 420 +83 380 +43
Marriott & Ext. 296 349 +53 309 +13
Hilton(full buildout) 1053 815 -238 775 -278
Oakes Inn 164 192 +28 152 -12
HOCO Property 815 747 -68 707 -108
(Information based on plans, and actual numbers may vary given site plan amendments)
There may be instances where developments are not able to physically accommodate the
required parking, and /or would prefer to maximize the building footprint. In this case, the
existing cash -in -lieu policy may be applied subject to certain conditions being fulfilled. The
following is an overview of the policy.
• This policy was developed in 1973, updated in 1991 and in 2002
• Was developed to encourage re- development and revitalization in established areas
• there are 4 cash -in -lieu areas within the city
• Tourist commercial core
• Downtown central business district
• Chippawa commercial area
• Main /Ferry business area
• Cash -in -lieu is not a right but the exception to the rule which may be granted when
• hardship prevails
• a change of use in an existing structure is proposed
• a development is contributing to the revitalization of the area
• for developments that will have a "minor impact" on the area
Cash payments are 1 /2 the estimated cost of providing each required parking space. In
2001, an assessment of land values in the cash -in -lieu areas was undertaken with a
January 25, 2010
resulting cost of $24,000 for a parking space within the tourist commercial area. Thus,
subject to a property qualifying for cash -in -lieu, an applicant would have the option of
contributing 1 /2 equating to $11,900 per space for parking relief. The payments may also
be made in installments with a maximum of 5 annual equal payments. The cash -in -lieu
funds deposited to the city are for use towards the construction of future parking lots.
Many properties within the tourist area currently do not meet the parking standards of 79-
200 as they preexisted the by -law. These properties are credited the non- existent parking
spaces which are termed "grandfathered ", and upon redevelopment these parking space
credits are transferred to the new development. Also, there are a number of properties that
are completely exempt from providing parking. Thus, the properties that fall into one of the
above categories will always have a deficit in actual parking needs for their establishment.
At this time, the combination of parking spaces available in municipal lots and on- street,
private commercial parking lots and on private property adequately accommodates the
parking needs during the peak tourist season. However, should private developments not
provide adequate parking spaces for their needs, and /or private commercial parking lot
operators redevelop their properties to a use other than for public parking, a parking
shortfall may potentially result in the future. Thus, it is of significant importance to
continue collecting cash -in -lieu payments from developers for the parking space shortage
that they do not physically provide. Otherwise, the onus may then be on the City to
construct additional parking facilities, financially burdening the taxpayers, as cash -in -lieu
contributions have been waived.
LIST OF ATTACHMENTS
Study Area drawing
Correspondence from Sullivan Mahoney dated June 24, 2009
Recommended by:
Approved by:
Respectfully submitted:
/r“.4
-7- TS- 2010 -07
Karl Dren, Director of Transportation Services
4,ic
Alex Herlovitch, Q!rector of Planning & Development
)2-4--74/N-A
Ed Dujlovic, Executive Director of Community Services
Ken Todd, Chief Administrative Officer
� TS- 2010 -07
Tourist Area Parking
Niagaraj3alls Demand Study
Limits of Study Area
NORTH
January 20, 2009
via fax #905 - 357 -9293
City of Niagara Falls
4310 Queen Street, P.O. Box 1023
Niagara Falls, ON L2E 6X5
Attention: Councillor Carolynn Ioannoni, Chair
Members of the Community Services Committee
Dear Ms. Ioannoni and Members of the Community Services Committee:
Re: TS- 2010 -07
Tourist Area Parking Demand Study
Please reply to the Niagara Falls Office
As you may be aware, we represent a number of stakeholders who have a keen interest in the Tourist Area
Parking Demand Study (the "Study ") which has been presented to you for adoption.
Given that the undersigned will be on holidays from January 20, 2010 through to January 26, 2010, we are
requesting that this matter be deferred so that we may have an opportunity to review the Study with our
clients and make representations to the Committee.
Although it is acknowledged that the Study's recommendations have been revised in a positive manner on
a number of points, we have some ongoing concerns with the following recommendations:
1. That, irrespective of whether a hotel, for example, has five hundred (500) rooms or fifty (50)
rooms, a maximum of two (2) bus parking space substitutions in lieu of twenty (20) parking spaces
per bus is proposed;
2. That a parking standard of one (1) space per fifteen (15) seats per restaurant in hotels exceeding
three hundred (300) seats will apply to all seats rather than only to the number of seats over three
hundred (300); and
3. That parking demand studies will no longer be accepted for land uses such as restaurants, hotels,
retail stores, museums, etc. notwithstanding the fact that a number of recent parking demand
studies in the tourism area have been adopted by Council with substantially reduced parking
requirements than that which is being proposed. Should this recommendation prevail, a
stakeholder who has insufficient parking shall only have the option to pay cash in lieu rather than
40 Queen Street, P. O. Box 1360, St. Catharines, Ontario L2R 6Z2 Telephone: 905 -688 -6655, Facsimile: 905- 688 -5814
4781 Portage Road, Niagara Falls, Ontario L2E 6B1 Telephone: 905- 357 -0500, Facsimile: 905- 357 -0501
waw.sullivan- mahoney.com
V.F. Muratori, Q.C.
J.M. Gottli
S J. Premi
L.KParsons
P.B. Bedard
Culliton
C. D'Angelo
CJ. Bittle
T.A. Richardson
J.R. Bush
R. Vacca
J.P. Maloney
P.M. Sheehan
P.A. Mahoney
T. Wall
S.E.Wells
Of Counsel (Commercial Law): M.D. Kriluck
W.B. McKaig
B.A. Macdonald
K.A. Book
M.D. Atherton
J. Dallal
M.J. Bonomi
B.J. Troup
D.A. Goslin
G.W. McCann
M.F. Adams
Yours very truly,
SULLIVAN MAHONEY LLP
Per:
Rocco Vacca
RV:jb
c.c. Alex Herlovitch, Planning Department
Dean Iorfida, City Clerk
Marzenna Carrick, C.E.T. Manager of Traffic Operations
Niagara 21' Group Inc.
HOCO Limited
Niagara Clifton Motor Limited
Page 2
Thank you in advance for your consideration of our request. We remain hopeful that new parking ratios,
which are long overdue, will be achieved through a process of communication, consultation and consensus
with the stakeholders.
January 20, 2009
via fax #905 - 357 -9293
City of Niagara Falls
4310 Queen Street, P.O. Box 1023
Niagara Falls, ON L2E 6X5
E VAN MAH N EY,.
LAWYERS
Attention: Councillor Carolynn Ioannoni, Chair
Members of the Community Services Committee
Dear Ms. Ioannoni and Members of the Community Services Committee:
Re: TS- 2010 -07
Tourist Area Parking Demand Study
As you may be aware, we represent a number of stakeholders who have a keen interest in the Tourist Area
Parking Demand Study (the "Study ") which has been presented to you for adoption.
Given that the undersigned will be on holidays from January 20, 2010 through to January 26, 2010, we are
requesting that this matter be deferred so that we may have an opportunity to review the Study with our
clients and make representations to the Committee.
Although it is acknowledged that the Study's recommendations have been revised in a positive manner on
a number of points, we have some ongoing concerns with the following recommendations:
1. That, irrespective of whether a hotel, for example, has five hundred (500) rooms or fifty (50)
rooms, a maximum of two (2) bus parking space substitutions in lieu of twenty (20) parking spaces
per bus is proposed;
2. That a parking standard of one (1) space per fifteen (15) seats per restaurant in hotels exceeding
three hundred (300) seats will apply to all seats rather than only to the number of seats over three
hundred (300); and
3. That parking demand studies will no longer be accepted for land uses such as restaurants, hotels,
retail stores, museums, etc. notwithstanding the fact that a number of recent parking demand
studies in the tourism area have been adopted by Council with substantially reduced parking
requirements than that which is being proposed. Should this recommendation prevail, a
stakeholder who has insufficient parking shall only have the option to pay cash in lieu rather than
V.F. Muratori, Q.C.
J.M. Gottli
S.J. Premi
L.KParsons
40 Queen Street, P. O. Box 1360, St. Catharines, Ontario L2R 6Z2 Telephone: 905- 688 -6655, Facsimile: 905 - 688 -5814
4781 Portage Road, Niagara Falls, Ontario L2E 6B1 Telephone: 905- 357 -0500, Facsimile: 905 -357 -0501
www.sullivan-mahoney.com
P.B. Bedard
R.B. Culliton
C. D'Angelo
C.J. Bittle
T.A. Richardson
J.R. Bush
R. Vacca
J.P. Maloney
P.M. Sheehan
P.A. Mahoney
T. Wall
S.E.Wells
Of Counsel (Commercial Law): M.D. Kriluck
W.B. McKaig
B.A. Macdonald
K.A. Book
M.D. Atherton
Please reply to the Niagara Falls Office
J. Dailal
M.J. Bonomi
B.J. Troup
D.A. Goslin
G.W. McCann
M.F. Adams
Yours very truly,
SULLIVAN MAHONEY LLP
Per:
Rocco Vacca
RV:jb
c.c. Alex Herlovitch, Planning Department
Dean Iorfida, City Clerk
Marzenna Carrick, C.E.T. Manager of Traffic Operations
Niagara 21 Group Inc.
HOCO Limited
Niagara Clifton Motor Limited
Page 2
Thank you in advance for your consideration of our request. We remain hopeful that new parking ratios,
which are long overdue, will be achieved through a process of communication, consultation and consensus
with the stakeholders.
June 24, 2009
Dear Ms. Carrick and Mr. McGill:
V.F. Muratori, Q.C.
J.M. Gott li
S.J. Premi
N.L. Paduraru
P.B. Bedard
R.B. Culliton
C. D'Angelo
L.K.Parsons
SULLIVAN MAHONEYLLP
L_ AWYLRS
Via Fax #905 -353 -0651 & Email: mcarrick(i)niaRarafalls.ca
City of Niagara Falls
4310 Queen Street, P.O. Box 1023
Niagara Falls, ON L2E 6X5
Attention: Marzenna Carrick, C.E.T. — Manager of Traffic Operations
Via Fax #905- 682 -4495 & Email: john. mcjiilaaecom. com
AECOM formerly (Totten Sims Hubicki Associates)
30 Hannover Drive
St. Catharines, ON L2W ()Al
Attention: John McGill, P. Eng., PTOE
Re: Tourist Area Parking Demand Study
Public Information Meeting — June 17, 2009
This letter is written further to our attendance at the Public Information Meeting on June 17, 2009 in
respect to the Tourist Area Parking Demand Study (the "Parking Study ").
As you are aware, we represent a number of affected stakeholders. Although our clients are generally in
support of the recommendations contained in the Parking Study, we would like to take this opportunity
to suggest some revisions or additions to the recommendations keeping in mind that Council has the
jurisdiction to make certain policy decisions including the exemption of certain areas within the tourist
area from the proposed parking rates and /or the exemption from parking for certain uses within the
tourist area. Our clients will be considering their position in this matter once we receive your response
to the issues outlined below.
Our comments in respect to the Parking Study are as follows:
1. A number of the parking rates are based upon the area occupied by the use referred to as the
"Gross Leaseable Floor Area ". Section 2.22 of Zoning By -law 79 -200 defines this term as
generally being the aggregate of the horizontal areas of each floor in a building measured to and
including the outside walls. We reiterate our comment from the Public Information Meeting that
the definition of this term ought to be revised to exclude those areas which are not accessible by
the public generally being the "back of house" including storage areas, office areas, employee
break rooms and washrooms, etc.
40 Queen Street, P. O. Box 1360, St. Catharines, Ontario L2R 6Z2 Telephone: 905- 688 -6655, Facsimile: 905- 688 -5814
4781 Portage Road, Niagara Falls, Ontario L2E 6B1 Telephone: 905- 357 -0500, Facsimile: 905- 357 -0501
www. sul l ivan- mahoney. com
T.A. Richardson
J.R. Bush
R. Vacca
C.J. Bittle
P.M. Sheehan
P.A. Mahoney
T. Wall
J.P. Maloney
Of Counsel (Commercial Law): M.D. Kriluck
W.B. McKaig
B.A. Macdonald
K.A. Book
S.E.Wells
Please Reply to Niagara Falls Office
J. Dailal
M.J. Bonomi
B.J. Troup
D.A. Goslin
G.W. McCann
M.F. Adams
2
2. Currently, there is no specific parking rate for uses such as "miniature golf courses" or indoor or
outdoor "amusement rides ". As such, in these cases a Site Specific Parking Demand Study is
required. This runs contrary to one of the stated purposes for the Parking Study which is to
reduce the need for Site Specific Parking Demand Studies. Therefore, we are suggesting that
parking rates be established for these uses and similar uses in consultation with the stakeholders
before this matter proceeds to Council.
3. With respect to the proposed parking rates for restaurants, it is noted that no distinction is being
made between fine dining restaurants and fast food restaurants. The results of the surveys
summarized in the Parking Study illustrate that the parking needs for fine dining restaurants are
substantially greater than fast food restaurants. It is further noted that a recent Site Specific
Parking Demand Study completed by Delcan in respect to the former Pilgrim Inn site on Clifton
Hill recommended a 50% reduction in the parking rate for fast food restaurants versus fine
dining restaurants. Accordingly, we are requesting that you consider the same reduced parking
rate for fast food restaurants.
4. It is noted that in the case of hotels with no ancillary services, parking rates will increase by
30 %. It is further noted by Mr. Herlovich that even those sites that have received Site Specific
Zoning By -Law Approvals from Council but have yet to receive Site Plan Approval or have
commenced construction, will be required to provide parking in accordance with the new
parking rates. We are requesting that consideration be given to not applying the new parking
rates to sites which have previously received Site Specific Zoning Approvals in the case where
the new parking rates will result in an increase in parking requirements (ie. hotels with no
ancillary services). We believe that there is justification for this position on the basis that said
sites were previously approved by Council with parking demands and needs considered at that
time. In our considered opinion, an increase of 30% in parking requirements for a site may
result in a development not proceeding at all.
5. The Parking Study recommends a bus parking space substitution whereby one (1) bus parking
space would be equal to twenty (20) vehicle parking spaces to a maximum substitution of forty
(40) spaces (ie. two bus parking spaces). Although the inclusion of a substitution provision is a
positive improvement, we have two points of concern. First, the bus parking space is not
allowed to be offsite. As you are aware, a vast number of the high rise hotels in the City operate
with offsite parking lots incorporated in its zoning and site plan approval. We see no reason
why a bus parking space could not be located offsite given that the bus would drop off and pick-
up guests at the entrance of the hotel in any event. Second, it is not equitable in our opinion to
have a hotel with one hundred (100) rooms being treated the same way as hotel with five
hundred (500) rooms in respect to the opportunity to substitute bus parking spaces for vehicle
spaces. Accordingly, we are suggesting there be a maximum substitution of forty (40) spaces
for a hotel with one hundred and forty (140) or less rooms and for every seventy (70) rooms
thereafter a bus parking space substitution would be allowed with no maximum substitution.
6. Based on comments by Mr. Herlovich at the Public Information Meeting, it is our understanding
that if the proposed new parking rates are approved by Council, the new parking rates will apply
to any existing uses within the tourist area automatically without the need for any action to be
taken by the owner. On the other hand, if the use has specific parking standards set out in its
Site Specific Zoning By -law without any reference to By -law 79 -200, then the owner will need
to bring an Application for Zoning By -law amendment or variance presumably to enjoy the new
parking rates. Please confirm that this writer's understanding is correct on this issue.
7. With respect to the parking rates which would apply to restaurants in hotels and meeting rooms
in hotels, it is understood that if the aggregate of restaurant seats is less than three hundred (300)
8. It is our understanding that the proposed recommendations include a proposed official plan
amendment to prohibit any Site Specific Parking Demand Studies within the tourism area for the
uses considered in the Parking Study. We have concerns with this recommendation. We believe
the door should be left open to any proponent to pursue reductions in parking demand on a site
specific basis. Although we agree that the proposed parking demand rates will result in fewer
Site Specific Studies, a prohibition on this issue should not be put in place. For example, it is
noted that the survey results for restaurant uses on Clifton Hill justify a range of parking demand
rates from one (1) space per thirty (30) seats to one (1) space per ninety -five (95) seats.
However, the parking demand rate being recommended is one (1) space per ten (10) seats.
Based on these results, it would only exaggerate the resulting inequity to prohibit a property
owner on Clifton Hill to pursue a Site Specific Traffic Demand Study in this case. We trust that
there are a number of other similar cases within the tourist area.
and the aggregate of meeting room area is less than 1400 square metres, then in each case, no
parking would be required. However, if the opposite were true, then in each case the proposed
parking rates would apply to all of the restaurant seats and all of the meeting room space. With
respect to the issue of the restaurants, the rationale given was that any restaurant with more than
three hundred (300) seats could be characterized as a destination type restaurant rather than an
ancillary use within a hotel and therefore there is a parking need. Applying this rationale, we
would suggest that the aggregate of the number of restaurant seats be of no relevance and that
the proposed parking rates of one (1) per fifteen (15) seats would apply only to a restaurant
within a hotel with greater than three hundred (300) seats. Also, clarification should be made to
exempt from the parking rates any breakfast room or restaurant which is only open to guests of
the hotel. For instance, many major hotel chains now offer a complimentary breakfast to its
guests in a designated area which otherwise is not used as a restaurant and which is not open to
the general public.
Thank you for the opportunity to provide comments on behalf of our clients. We look forward to
receiving your position on the matters noted above in due course. We remain confident that new
parking ratios, which are long overdue, will be achieved through a process of communication,
consultation and consensus with the stakeholders.
Should you require any additional information or clarification on the above, please do not hesitate to
contact this writer.
Yours truly,
SULLIVAN MAHONEY LLP
Per:
Rocco Vacca
RV:jb
c.c. Alex Herlovich, Planning Department
Niagara 21 Group Inc.
Hoco Limited
Niagara Clifton Motor Unlimited
3
Niagara, a s,
rx��irA
REPORT TO: Councillor Carolynn loannoni, Chair
Members of the Community Services Committee
City of Niagara Falls, Ontario
SUBMITTED BY: Community Services Department
EXECUTIVE SUMMARY
MW- 2010 -03
January 25, 2010
SUBJECT: MW- 2010 -03
Mewburn Road Bridge (Mewburn Road - Concession 6 Road)
Resolution from the Town of Niagara -on- the -Lake
RECOMMENDATION
That staff be directed to pursue funding assistance for the demolition and replacement of
the Mewburn Road Bridge and further that By -Law No.2009 -172 be amended to restrict
access to the structure by all users. In addition, staff be directed to install signage and
barriers that will preclude any physical access to the structure and that notice of this
decision be given to the property owners, CN Rail, Canadian Transportation Agency and
the Town of Niagara -on- the -Lake.
and that Mr. Iseppon's comments be referred to staff to investigate ownership & cost
sharing for replacement of the rail bridge
The Mewburn Road Bridge has been closed to vehicular traffic since last April pending the
outcome of a Municipal Class Environmental Assessment (EA). This process is nearing
completion with the preferred alternative yet to be selected. In any case, the removal of the
existing structure will be necessary as its condition is beyond repair.
At its meeting on November 2, 2009, Council considered the recommendation set out in
report TS- 2009 -44 and subsequently passed By -Law No. 2009 -172. At that time Council
made a decision to allow access for pedestrian purposes only.
The Public Works staff at the Town of Niagara -on- the -Lake has been actively engaged in
the closure and the EA process given the structure's location on an important connector
road between the two municipalities. City Council's decision was forwarded to the Town's
Director of Public Works for information. At its meeting on December 14, 2009, the Town
of Niagara -on- the -Lake Council passed a resolution offering their support for Federal or
Provincial funding assistance and requested that the City reconsider its position with
respect to the continued use of the bridge for non - vehicular traffic.
Municipal Works staff continues to have concerns about the structural integrity of the
bridge and the false impression that it may be safe to use despite the installation of
warning signs advising pedestrians to use at their own risk. Staff also believes that a full
closure of the structure raises the urgency of this matter and strengthens the City's position
in its pursuit for funding from external sources.
The EA is expected to be completed within the next 2 -3 months and, barring any Part it
Order Requests, the preferred solution will be identified after the feedback from the public
January 25, 2010 -2- MW- 2010 -03
and various agencies is considered. Given the preliminary assumption that the costs will
range from $1 to $3 million it is not likely that the City will be in a position to afford this
expenditure this year without a significant contribution from other external funding sources.
BACKGROUND
City Council adopted the recommendations set out in report MW- 2009 -42 on June 8, 2009
which provided for the temporary closure and investigation of solutions for the replacement
of the Mewburn Road Bridge over the CN Railway. On August 31, 2009, City Council
approved the initiation of the Municipal Class Environmental Assessment process and
engagement of the consulting firm DelCan Corporation for this purpose (see report MW-
2009-59). On November 2, 2009, Council approved the recommendations in report TS-
2009-44 passing By -Law No. 2009 -172 being a by -law to temporarily remove the public
right of passage over a highway. This by -law included provisions to "allow temporary
passage of pedestrians and human powered vehicles."
These resolutions were forwarded to the Town of Niagara -on- the -Lake as both
municipalities have a vested interest in reestablishing the safe and functional use of this
inter - municipal connector road. The Town Council, at its meeting of December 14, 2009
adopted the recommendations of its Public Works Advisory Committee requesting the City
to reconsider its position regarding the continued use of the bridge for non - vehicular traffic.
In addition, the Town offered its support to the City in any application for Federal or
Provincial Funding for the replacement of the structure.
A Public Information Centre was held on Thursday, January 14, 2010. The details of this
session will be provided in a future report.
FINANCIAL IMPLICATIONS
Upon completion of the EA process staff is recommending that the City make application
for funding to the Gateways and Border Crossings Fund (GBCF) administered by Transport
Canada. Under this program, the Federal Government will contribute up to 50% of the
eligible costs of the project. The remaining share could be split in accordance with the cost
apportionment formula specified in the Canada Transportation Act for grade separation
projects (i.e., bridges). The application will be made immediately upon the completion of
the EA. For budget purposes the following cost - sharing formula should be used;
GBCF Funding (50%) $1,500,000
CN Rail Share (7.5 %) $ 225,000
City's Share (42.5 %) $1,275.000
Total Project Cost (est.) $3.0 million
The City's portion of this project is not included in the five -year Capital Forecast and in
order to accommodate this investment in the 2010 Budget it will be necessary to defer one
or more tax - supported projects. A decision in this regard is premature until a more accurate
cost estimate and the funding eligibility for this project have been confirmed. These
preliminary figures are being provided for information only and subject to change.
' January 25, 2010 -3- MW- 2010 -03
COMMITMENT TO COUNCIL PRIORITIES
The recommendation contained in this report is consistent with Council's priorities to
identify and evaluate alternative sources of revenue and to establish infrastructure
investment priorities.
ATTACHMENTS
1. Report MW- 2009 -42
2. Report MW- 2009 -59
3. Report TS- 2009 -44
4. By -Law 2009 -172
5. Letter from the Town of NOTL, December 15, 2009.
Recommended by:
Approved by:
Respectfully submitted:
Geoff Holman,
Ed Dujlovi9, Executive Director of Corporate Services
ector of Municipal Works
Ken T dd, Chief Administrative Officer
June 8, 2009
His Worship Mayor Ted Salci
and Members of the Municipal Council
City of Niagara Falls, Ontario
Members:
RECOMMENDATION:
BACKGROUND:
Niag araFalls
Re: MW- 2009 -42
Mewburn Road Bridge Over CN Railway
Temporary Closure - Status Report
Working Together to Serve Our Community
MW- 2009 -42
The recommendation(s)
contained in this report were
adopted by City Council
That this report be received for information and that staff be directed to meet with
representatives from CN, the Region of Niagara and the Town of Niagara -on -the -Lake to
address emergency response and road maintenance issues on an interim basis.
On April 22, 2009, Municipal Works staff received a report from Ellis Engineering Ltd.
recommending that "the City close the road immediately unless structural repairs are
completed and it can be shown that the bridge can support the posted load limits. Once
repaired we can then recommend Toad capacity evaluation (LCE) in order to determine a
safe Toad carrying capacity. The structure should be scheduled for replacement with
another bridge or level crossing NOW."
The closure was implemented immediately and Council was advised of the temporary
detour pending a full inspection by the structural engineers at CN. The Town of Niagara -
on- the -Lake was notified so that arrangements for signs and emergency response to the
immediate area could be coordinated.
Staff has received notice that the Town's Public Works Advisory Committee passed a
motion on May 11, 2009 requesting "the Region and the City of Niagara Falls and the Town
staff meet with CN to discuss the closure of the Railroad Bridge on Concession 6 /Mewburn
Road and to come back to Committee with scenarios to reopen."
On May 21, 2009, CN completed a reassessment of the structure and advised our staff
that the needed repairs are "too expensive and will not be completed." This means that
any hope of reopening the roadway this year (even at a reduced load limit) is not likely.
Community Services Department
Municipal Works
June 8, 2009
The single -lane structure needs to be reconstructed to meet the current Ontario Bridge
Code. To complicate the matter further, the Region's Transportation Sustainability Review
(see report MW- 2009 -30 attached) identified this section of Mewburn Road as being a
candidate for transfer to the Region of Niagara due to its inter - municipal connector
function. The cost of replacing the existing structure with a new bridge is approximately
$2,000,000. Funding for an expenditure of this nature has not been included in the 5 -year
Capital Forecast.
The next step is to arrange a meeting with each of the stakeholders to coordinate a short
term and long term operating plan to reopen the bridge. The full range of alternatives
including the construction of a level crossing, will be examined. Given the importance of
this road section, permanent closure is not considered to be a practical option. Staff will
prepare a recommendation for Council's consideration once the discussions are completed
later this Summer.
Recommended by:
• Approved by:
Respectfully Submitted by:
Attach:
Geoff Holm.: n, Di ctor of Municipal Works
Ed Dujlovic, E "- utive R'rector of Community Services
- 2 - MW- 2009 -42
Ken Todd, Chief Administrative Officer
S: \REPORTS \2009 \MW - 2009 -42 - Mewburn Road Birdge Over CN Railway Temporary Closure.wpd
Office of the Town Clerk
TELEPHONE 905- 468 -3266
FACSIMILE 905 -468 -2959
May 26, 2009
Canadian National Railway Company
4 Welding Way
P.O. Box 1.000
Concord ON L4K 1B9
Yours truly,
Holly Dowd
Town Clerk
Copy: Regional Clerk
City of Niagara Falls V
Town Public Works
• The Town of
iagara
Attention: Mr. John MacTaggart, P.Eng.
Engineering Services
First Capital of Upper Canada - 1792
n=rhe -lake
Dear Mr. MacTaggart:
Re: Railway Bridge on Concession 6 Road /Mewburn Road, Niagara Falls
Please be advised that the Council of the Corporation of the Town of Niagara -on-
the -Lake, at its regular meeting held on May 25, 2009, approved the following
motion:
that the Region, the City of Niagara Falls and Town staff meet with
Canadian National Railway to discuss the closure of the railway
bridge on Concession 6 Road /Mewburn Road and come back to
Committee with scenarios to reopen.
Please contact Mr. Ewald Kuczera, Director of Public Works at 905- 468 -3278 to
schedule a meeting.
1593 FOUR MILE CREEK ROAD
P.O. Box 100
VIRGIL, ONTARIO
LOS ITO
Niagara ails
Mewburn Road Bridge Over CNR
wasomin Subject Area — Municipal Boundary
I.MO Other Municipalities Ortho Imagery ca. 2006
August 31, 2009 MW- 2009 -59
His Worship Mayor Ted Salci
and Members of the Municipal Council
City of Niagara Falls, Ontario
Members:
Re: MW- 2009 -59
Mewburn Road Bridge - Temporary Closure
Status Report and Next Steps
RECOMMENDATION:
BACKGROUND:
Niagaraflalls
CANADA
Working Together to Serve Our Community
The recommendation(s)
contained in this report were
adopted by City Council
That the Town of Niagara -on- the -Lake, Region of Niagara and affected area residents be
notified of the extension of the temporary closure of the Mewburn Road Bridge pending the
completion of a Municipal Class Environmental Assessment (EA) of alternatives.
That Delcan Corporation be engaged to complete the EA in accordance with their attached
proposal dated July 3, 2009 at an upset limit of $60,000 (plus GST and contingencies.)
The CN Rail Bridge on Mewburn Road has been closed on a temporary basis since late
April of this year pending the completion of a detailed structural analysis and load capacity
evaluation. Staff has met with representatives from CN, Region of Niagara and Town of
Niagara -on- the -Lake to investigate the possibility of completing interim repairs to allow the
overpass to be reopened with restricted load limits. CN has now confirmed that interim
repairs would not be practical and deemed the structure to have reached the end of its
service life.
There is considerable interest from the public to reopen the structure as soon as possible
and a need to coordinate proper signage, emergency and maintenance responses until
such time as full access can be reinstated. The replacement of the existing structure
requires the completion of a Schedule `B' Municipal Class EA which will examine the
feasibility of all practical alternatives including a permanent closure, a level crossing and
a new structure. Staff has requested a proposal from Delcan Corporation and has jointly
developed a work plan to achieve this end.
At its meeting on June 8, 2009, Council approved report MW- 2009 -42 which directs staff
to meet with CN, the Region apq the Town of Niagara -on- the -Lake officials to address
emergency response and lance issues on an interim basis.
4310 Queen Street, PO. Box 1023, Niagara Falls, ON, Canada L2E 6X5 905 -356 -7521 www.nia arafalls.ca
Community Services Department
Municipal Works
- - MW- 2009 -59
A meeting was held on June 16, 2009 resulting in a verbal commitment from CN to
complete a detailed structural analysis to determine if it was feasible to repair the bridge.
On August 5, 2009, staff received an email from Mr. John McTaggart (Sr. Engineering
Services Officer) stating;
"We have discussed the fate of this bridge with our Structural Department and the
repairs required to put the bridge back to a temporary 6 tonne capacity are too high
to consider as an option. While an exact estimate is unknown, the cost is likely well
in excess of $500,000. The funds that the Railway had protected for this year would
not be sufficient to reinstate traffic considering the advance state of deterioration of
this structure.
Since our funding would not provide any effective improvement to the bridge, we
have re- assigned the funds to other areas. At this time, the Railway considers the
bridge to have reached the end of its service life. 1 do not have the original date of
construction for this bridge but do know that is was reconstructed under Board
Order No 33714, dated June 1, 1923."
Mewburn Road is an inter - municipal connecting link with the Town of Niagara -on- the -Lake
which also provides access to the Pine Tree village Mobile Home Park and other
agricultural and estate residential properties. Closing the roadway on a permanent basis
will have significant social impacts. It would be prudent to commence the EA process
immediately to expedite the implementation of a preferred alternative. The EA process is
expected to take up to six months barring any complications.
This project was not anticipated and therefore not included in the City's 2009 -2013 Capital
Projects Budget. The completion of the EA is the first step in advancing a solution to this
matter and funding from reserves will be necessary.
FINANCIAL CONSIDERATIONS:
Since this project was not considered in the 2009 Capital Budget and given the urgent need
to initiate the Mewbum Road Bridge EA, staff is recommending making changes to the 2009
Approved Capital Budget based on this new information. Specifically, this project should be
added to the approved capital works projects. The required funding of $80,000 to perform
the EA will utilize a portion of the Special Purpose reserve set aside for the Willodell Road
Bridge Replacement.
To facilitate this change a change in timing of the Willodell Road Bridge replacement will
be required. Specifically, the engineering for the project will still proceed as scheduled
however the actual construction phase of the project will need to be re- prioritized as part of
the upcoming 2010 Capital Budget deliberations. The Willodell Road Bridge replacement
project was included in the 2009 Capital Budget with $20,000 set aside for engineering in
2009 and $150,000 in costs planned for 2010 in the construction of a structure that would
provide non - vehicular access only.
The proposed action is consistent with the City Council's Strategic Priorities namely;
• establish infrastructure investment priorities, and
• develop and implement a comprehensive transportation plan.
August 31, 2009 - 3 - MW- 2009 -59
LIST OF ATTACHMENTS:
• MW- 2009-42
• Proposal for Engineering Services - Declan Corporation (August 21, 2009)
Recommended by:
Approved by:
Respectfully Submitted by:
Ed D jlovic, Executive Director of Community Services
Ken Todd, Chief Administrative Officer
S:1REPORTS120091MW- 2009 -59 - Mewbum Road Bridge Temporary Closure.wpd
, Director of Municipal Works
REPORT TO:
Councillor Carolynn loannoni, Chair
and Members of the Community Services Committee
City of Niagara Falls, Ontario
SUBMITTED BY: Transportation Services
SUBJECT: TS- 2009 -44
Mewburn Road - Road Closure
RECOMMENDATION
EXECUTIVE SUMMARY
BACKGROUND
TS- 2009 -44
November 2, 2009
The reoamniendntion(s)
contained in this report were
amendedivco mittee and
ratified by City Council
That Council approves the by -law appearing on tonight's agenda to prohibit passage over
the Mewburn Road rail bridge. With an amendment to allow temporary passage of
pedestrians and human powered vehicles.
A bylaw to authorize the closure of Mewburn Road at the rail bridge has been prepared.
The bylaw will be in effect until bridge remediation is completed and traffic is again allowed
to pass over the rail corridor. The detour signs will be removed and replaced with "No Exit"
signs, and supplementary information signs identifying the closure at the bridge.
At its meeting on June 8, 2009, City Council adopted the recommendations set in report
MW- 2009 -42 regarding the temporary closure of the Mewburn Road Bridge over the CN
Railway. On August 31, 2009, City Council approved the engagement of Delcan
Corporation to complete the Environmental Assessment that would examine options for
reopening the roadway. (See MW- 2009 -59)
Recent discussion with Emergency Services and Operations staff has identified the need
to make the road closure signage more visible and durable so that they will not be
jeopardized during winter conditions. The issue of pedestrian activity has become a
concern to staff given the uncertainty of the structural integrity of the bridge. This bridge
is identified as part of the Bruce Trail and staff continue to have concerns about the use
of the bridge by pedestrians and non - motorized vehicles.
Since the bridge is owned by CN, staff requested their position regarding the use of this
structure even by non - motorized vehicles and pedestrians to which staff received the
following response. "We have discussed the matter of permitting pedestrian use only and
are of the opinion that no traffic of any kind be permitted to use the bridge. It appears that
any safety factors with the load capacity of the bridge no longer meet standards. We are
not concerned at this time that the structure will collapse since it was handling heavy traffic
a short time ago. We will continue to monitorthe bridge for signs of failure and movement."
John MacTaggart, P.Eng., Senior Engineering Services Officer.
November 2, 2009 -2- TS- 2009 -44
The Notice of Study Commencement for the Environmental Assessment has been
advertised and the first Public Information Centre is scheduled for mid - November.
ANALYSIS /RATIONALE
It may be another two years before remedial action is completed which would allow traffic
to traverse the rail corridor. Municipal works have identified a concern regarding the quality
of snow plowing on Mewburn Road around the large road - closed sign. Furthermore,
detour signing is normally not used for durations that extend beyond one year In the
interim, Staff is suggesting that the street be signed with a "No Exit" sign supplemented
with the star burst "New" sign on top. An information sign stating "Mewburn Road Closed
at Bridge" will also be posted for driver information. Section 35 of the Municipal Act gives
municipalities the authority to pass a bylaw to restrict the common right of passage over
highways.
The opposite end of the road segment, north of the rail bridge, is located within the Town
of Niagara -on- the -Lake. Staff has updated town staff on the City's undertakings. As the
bridge is entirely within Niagara Falls, town officials would only need to install similar
signage at the ingress to the road segment.
FINANCIAL/STAFFING/LEGAL IMPLICATIONS
The installation of the signs is carried out by Transportation Services staff. The labour and
material costs are accounted for in the Approved 2009 General Purposes Budget. Cost
studies estimate that the cost to manufacture and install the signs is approximately $725.
LIST OF ATTACHMENTS
1. Study Area drawing.
Recommended by:
Approved by:
Respectfully submitted:
J. Grubich
Karl Dren, Director of Transportation Services
Ed Dujlovic, Executive Director of Community Services
Ken Todd, Chief Administrative Officer
Location
of Qverpass
TS-2009-44
Mewburn Road
Road Closure
NORTH
HCQ TO BCAI1
CITY OF NIAGARA FALLS
By -law No. 2009 - 172
A by -law to temporarily restrict the public right of passage over a highway.
WHEREAS Section 35 of the Municipal Act, provides, in part, that the Council of every
municipality may pass by -laws to temporarily restrict the public right of passage over a highway;
AND WHEREAS the Council of The Corporation of the City of Niagara Falls now deems it
expedient to pass this by -law;
THE COUNCIL OF THE CORPORATION OF THE CITY OF NIAGARA FALLS ENACTS
AS FOLLOWS:
1. The public right of passage over Mewburn Road, from 1.5 kilometres north of Mountain
Road to 1.7 kilometres north of Mountain Road, is hereby temporarily restricted to passage on foot
or by means of human powered vehicles.
2. The Mayor and Clerk are hereby authorized to execute all documents that may be required
for the purpose of carrying out the intent of this by -law and the Clerk is hereby authorized to affix
the corporate seal thereto and to deliver such documents.
Passed this second day of November, 2009.
First Reading:
Second Reading:
Third Reading:
November 2, 2009.
November 2, 2009.
November 2, 2009.
--1
DEAN IORFIpA CITY CLERK R.T. (TED) SALCI, MAYOR
Office of the Town Clerk
TELEPHONE 905 - 468-3266
FACSIMILE 905.468 -2959
December 15, 2009
The City of Niagara Falls
City Hall, PO Box 1023
4310 Queen Street
Niagara Falls ON L2E 6X5
Attention: Dean lorfida, City Clerk
Dear Mr. lorfida:
The Town of
agara- n -
ar
Town of Niagara -on- the -Lake
Public Works Report PW -09 -067
Concession 6 Road — Mewburn Road Bridge
Please be advised that the Council of the Corporation of the Town of Niagara-on-the-
Lake, at its regular meeting held on December 14, 2009, approved the following
recommendations contained in Public Works Report PW -09 -067:
1.1 That Public Works staff be instructed to install a sign on Concession 6 Road,
south of Warner Road, for southbound traffic advising that the Mewburn Road
Bridge is not safe for pedestrian or other non - vehicular traffic, and to place a
notice in the local newspaper and on the Town's website warning residents of
Niagara -on- the -Lake not to use the bridge; and,
1.2 That the Town Clerk prepare a letter to be sent to the City of Niagara
Falls advising of the steps that the Town intends to take with respect to
the bridge and asking them to reconsider their position with respect to
the continued use of the bridge for non- vehicular traffic; and
1.3 That the letter from the Town Clerk include that the Council of the Town
of Niagara -on- the -Lake supports the City of Niagara Falls in any
application for Federal or Provincial funding assistance towards the
replacement of the structure; and,
1.4 That the letter be copied to both the Canadian Transportation Agency and CN
Rail for their information.
A copy of Report PW -09 -067 is attached for your reference.
First Capital of
Upper Canada 1792
1593 FouR MILE CREEK ROAD
P.O. Box 100
VIRGIL, ONTARIO
LOS 1TO
cc:
Page 2 Concession 6 — Mewburn Road Bridge
In view of the Town of Niagara -on- the - Lake's intent outlined in Report PW -09 -067, on
behalf of Council, I respectfully request the City of Niagara Falls to reconsider its
position regarding the continued use of the bridge for non - vehicular traffic.
Furthermore, the Council of the Town of Niagara -on- the -Lake supports the City of
N g r a } any application for Federal or Provincial funding assistance towards the
s tructure. ,
yo 0
y, ul' favourable response.
Holly Dowd,
Town Clerk
information please contact Ewald Kuczera, Director of Public
G. Hare, Chair and CEO, Canadian Transportation Agency
F. Binder, Regional Manager, CN Rail
J. Mactaggart,Senior Engineering Services Officer, CN Rail
G. Holman, Director of Municipal Works, City of Niagara Falls
Hon. R. Nicholson MP
Hon. J. Bradley, Minister of Transportation
K. Craitor MPP
M. Dilwaria, Delcan Corporation
T. Senesi, Niagara Bruce Trail Club
E. Kuczera, Director, Public Works, Town of Niagara -on -me -Lake
Public Works
Telephone (905) 468 -3278
Facsimile (905) 468 -1722
Report: PW -09 -067
Report To:
Subject:
Report : PW -09 -067
PW- 3
Committee Date:
Due in Council:
Public Works Advisory Committee
Concession' 6 Road - Mewburn Road Bridge
December 07, 2009
December 14, 2009
1. RECOMMENDATION
It is respectfully recommended:
1.1 That Public Works staff be instructed to install a sign on Concession 6 Road,
south of Warner Road, for southbound traffic advising that the Mewburn Road
Bridge is not safe for pedestrian or other non- vehicular traffic, and to place a
notice in the local newspaper and on the Town's website warning residents of
Niagara -on- the -Lake not to use the bridge;
1.2 That the Town Clerk prepare a letter to be sent to the City of Niagara Falls
advising of the steps that the Town intends to take with respect to the bridge and
asking them to reconsider their position with respect to the continued use of the
bridge for non - vehicular traffic; and
1.3 That the letter from the Town Clerk include that the Council of the Town of
Niagara -on -the -Lake supports the City of Niagara Falls in any application for
Federal or Provincial funding assistance towards the replacement of the structure.
1.4 That the letter be copied to both the Canadian Transport Agency and CN Rail for
their information.
2. PURPOSE /PROPOSAL
The purpose of this report is to obtain Council's authorization to notify res
Niagara -on - the -Lake of an identified safety concern.
idents of
3 Lorraine Strret
P:0 Box 100
Virgil, Ontario
LOS 1TO
Page 1
3. BACKGROUND
The City of Niagara Falls recently completed a study of all its bridges and determined
that the bridge over the CN mainline, located on Mewburn Road, has significant
deficiencies and is unsafe to cross. A more detailed condition survey of this specific
structure was completed and a copy of which is appended to this report.
Mewburn Road is the extension;, of Concession 6 Road into Niagara Falls. The
structure is located 0.5 kilometres south of Warner Road. The only alternative route for
traffic which is destined to or originating from the area bounded by the CN mainline,
King's Highway 405 and the Queen Elizabeth Way, is via Concession 6 Road bridge
over Hwy 405. This presents a concern for a number of servicing issues including
emergency services.
The Town's Public Works Advisory Committee passed a motion on May 11, 2009 to
request that "the Region and the City of Niagara Falls and the Town staff meet with CN
to discuss the closure of the Railroad Bridge on Concession 6 /Mewburn Road and to
come back to Committee with scenarios to re- open." That meeting was held on May
25, 2009 and a follow -up memorandum was provided to Council (see attached June 22,
2009 memorandum).
Since that meeting, the City of Niagara Falls has blocked vehicles from accessing the
structure and commenced a Class Environmental Assessment Study for the Mewburn
Road Bridge. The Notice of Study Commencement states: "Ultimately, the study will
select the preferred alternative for the crossing which will provide safe, efficient and
effective movement of vehicular, pedestrian and bicycle traffic, while remaining
sensitive to the needs of adjacent land uses ".
4. DISCUSSION / ANALYSIS
On October 27, 2009, the Town's Director of Public Works and Roads Supervisor
attended a meeting with City staff to discuss the placement of road closure signs and
alternative servicing arrangements for winter control. The City and Town Fire Chiefs
had previously discussed fire response coverage for the Niagara falls properties
located between the CN tracks and the Town boundary limits.
Niagara Falls Community Services Committee held a meeting on November 2, 2009 at
which time a report (TS- 2009 -44) from Transportation Services dealing with the subject
bridge closure was discussed (see attached notice and report dated November 2,
2009).
Subsequently, the City's Director of Municipal Works has advised that City Council
approved the use of the Mewburn Road Bridge for pedestrian purposes only. Their
staff have been instructed to install -a maze barrier at either end of the structure and to
install signage that indicates "Road Temporarily Closed - Pedestrians Use At Own
Report : PW-09-067
PW' -'4:
Risk ".
Although vehicles will not be able to negotiate the crossing, the concern lies with the
fact that, despite the signs, residents of and visitors to Niagara-on-the-Lake may be
falsely led to believe that the structure is safe to cross on foot not knowing the true
condition of the structure.
As a professional engineer, the writer has expressed his concern in an e-mail to the
City's Director of Municipal Works. Furthermore, staff have contacted the Town's
solicitor to obtain his legal opinion from a due diligence standpoint.
After receiving the Solicitor's input, staff is seeking Council's authorization as follows:
1. Installation of a sign on Concession 6 Road south of Warner Road for southbound
traffic advising that the bridge is not safe for pedestrian or other non- vehicular traffic;
2. Placement of a notice in the local newspaper warning residents' of
Niagara -on- the -Lake not to use the bridge; and,
3. Correspondence to be sent to the City of Niagara Falls advising of the steps that the
Town intends to take with respect to the bridge and asking them to reconsider their
position with respect to the continued use of the bridge for non - vehicular traffic.
5. FINANCIAL IMPLICATIONS
The cost the sign and notice is estimated at $200.00 and $150.00, respectively.
6. COMMUNICATIONS
The communications effort is described by this report.
7. CONCLUSION
Mewburn Road Bridge, which has commonly been used by many of the local residents
of Niagara -on - the -Lake and those living or working outside of the community to access
parts of Niagara -on- the -Lake has been rendered unsafe for use. In addition to being an
inconvenience, there is the real concern for the residents in the immediate area to be
landlocked should there be a blockage on Concession 6 Road to the north of Warner
Road. Replacement of the structure should proceed with haste. As such, the Town
Council should support the City of Niagara Falls in its quest for financial assistance from
the upper levels of government. At the same time, the Town has a duty to discourage
pedestrians from using a structure which is at risk of failure as evidenced by the
structural engineer's report.
Report : PW -09 -067
PW -5
Page '3
Respectfully submitted,
E.J. 'Ku P zera, Mme. P.Eng.
Director of Public Works
First Capital of Upper Canada - 1792
A`t HM NTS
Memo. Conc. 6. Mewburn Railway Bridgezpdf
PW =6
Don Smith
CAO
Report : PW -09 -067 Page 4
REPORT TO: Councillor Carolynn loannoni, Chair
and Members of the Community Services Committee
City of Niagara Falls, Ontario
SUBMITTED BY: Community Services Department
SUBJECT: MW- 2010 -01
Tender - Downtown Infrastructure Revitalization - Phase 1
Queen Street - Crysler Avenue to Erie Avenue
St. Lawrence Avenue - Queen Street to Park Street
St. Clair Avenue - Queen Street to Park Street
Contract # 2009 - 179 -06
RECOMMENDATION
MW- 2010 -01
January 25, 2010
1. The contract be awarded to the lowest bidder Peter's Excavating Inc. at the
tendered price of $1,691,354.40.
2. That the Mayor and City Clerk be authorized to execute the necessary contract
documents.
EXECUTIVE SUMMARY
The replacement of the existing aging sanitary sewers, watermains and storm sewers at
key locations within the project area was previously identified as the important first phase
of a larger program of Public Realm improvements for the Downtown Area. Tenders for
this contract were opened on Tuesday, December 22, 2009 and the lowest bid of $
1,691,354.40 received from Peter's Excavating Inc. is being recommended for acceptance.
Council previously approved the recommendation to proceed with the Implementation of
the phased program forthe proposed Downtown Infrastructure Revitalization. This project
is to form part of the approved 2010 Capital Budget.
BACKGROUND
Niagara Falls City Council previously approved recommendations contained in Report MW-
2009-84 on November 30, 2009 directing staff to proceed with a phased implementation
plan forthe Downtown (Queen Street) Infrastructure Revitalization Project. As is noted in
that report, the first phase is the replacement of aging underground infrastructure in the
project area.
The existing sanitary sewer on Queen Street is in excess of 100 years old, and there are
known issues with respect to its severely deteriorated condition. With the recent
completion of the Trunk Storm sewer on Park Street, significant storm sewer drainage
areas could be removed from the sanitary sewer system through the construction of new
storm sewers on St. Lawrence Avenue and St. Clair Avenue from Queen Street to Park
January 25, 2010
Street. The existing watermains on St. Lawrence, Crysler, St. Clair and Erie Avenues
through the Downtown Area have all been rated as "very poor" and identified for
replacement. With an extensive program of Streetscaping and Surface feature
improvements planned for the public realm within the Downtown area for later in 2010, it
is prudent and cost effective to address any lingering and serious underground
infrastructure servicing issues in advance.
The Tender Opening Committee, in the presence of the Manager of Clerk's Services, Mr.
Bill Matson, opened tenders on at 1:30 p.m. Tuesday, December 22, 2009 for the above
noted contract. Tender documents were picked up by nine (9) Contractors and five (5) bids
were received.
Listed below is a summary of the totalled tendered prices, excluding GST, received from
the Contractors. The tenders were checked and the corrected bids are shown in bold and
marked with an asterisk ( *).
1. Peter's Excavating
2. Provincial Construction
3. Alfidome Construction
4. Centennial Infrastructure (Niagara)
5. Alfred Beam Excavating Ltd.
ANALYSIS /RATIONALE
- MW- 2010 -01
Stevensville
Niagara Falls
FINANCIAL IMPLICATIONS
Niagara Falls
Niagara -on- the -Lake
Fort Erie
$ 1,691,354.40
$ 1,988,696.00
$ 1,988,696.21*
$ 2,065,788.40
$ 2,065,793.40*
$ 2,185,832.00
$ 2,895,509.50
$ 2,895,459.50*
The lowest tender was received from Peter's Excavating Inc. in the amount of
$1,691,354.40. This contractor has performed similar type projects for the City. We are
of the opinion that this contractor is capable of successfully undertaking this project.
Timing of tenders for construction, when the planned schedule permits, can play an
important role in how competitive the market will be, based on prospective bidders work
loads. The project is scheduled to be completed by April 30, 2010, subject to weather
delaying restoration works.
This work is to be included in the approved Municipal Works Capital Budget for 2010. In
report MW- 2009 -84 the anticipated and cost and funding breakdown for Phase 1 were
listed as follows:
Federal - Provincial ISF Program
Water Capital Reserve
Sewer Capital Reserve
Roads Capital Reserve
Total Cost - Phase 1
$ 386,666
$ 367,500
$ 460,500
$ 33,334
$ 1,248,000
By accepting the lowest tender on this project it will be necessary to allocate an
additional $443,355 to cover the cost of this project. The largest source of funds will be
received from the Region for the CSO /MAP Funding program.
January 25, 2010
Recent discussions with Regional Niagara staff confirm that the Thorold Stone Road
Extension Phase 1 project will not be required in 2010 due to delays associated with the
acquisition of the property for the roadway by the Region. As a result the funding for this
project will not be necessary until 2011. The funding for the Thorold Stone Road
Extension Phase 1 project was approved in the 2009 Capital Budget.
As a result of the above mentioned delay, the funds previously earmarked for that
project from the sewer budget can be re- allocated to this project. This is consistent with
the increased scope of the project in regards to sewer separation
The recommended funding breakdown is as follows:
Federal - Provincial ISF Program (23 %)
Region of Niagara CSO /MAP Funding (22 %)
Water Capital Reserve (13 %)
Sewer Capital Reserve (40 %)
Roads Capital Reserve (2 %)
Total Cost - Phase 1
CITY'S STRATEGIC COMMITMENT
Implementation of this Capital Project meets the intent of Council's Strategic Priorities
to establish infrastructure investment priorities, and to strengthen and promote
economic development within the City.
ATTACHMENT
1. Location Plan
Recommended by:
Approved by:
Services
Respectfully submitted:
-3- MW- 2010 -01
Geoff Holman, Dir ctor of Municipal Works
Ed Dujlovic, Exe utive Director of Community
$ 386,666
$ 377,500
$ 217,613
$ 676,242
$ 33,334
$1,691,355
Ken Todd, Chief Administrative Officer
K. Schachowskoj
S: \REPORTS\2010 Reports \MW - 2010 -01 - Tender 2009 - 179 -06 Downtown Infrastructure Revitalization Phase 1.wpd
REPORT TO:
SUBMITTED BY:
SUBJECT:
RECOMMENDATION
1. It is recommended that Sidewalk Beat 6 be revised to include the short section of
municipal sidewalk on McLeod Road between St. Michael's Secondary School
entrance and St. Michael Avenue.
2. That staff investigates the implementation of a Citywide Sidewalk Maintenance By-
Law for Council's consideration later this year.
EXECUTIVE SUMMARY
Councillor Carolynn loannoni, Chair
Members of the Community Services Committee
City of Niagara Falls, Ontario
Community Services Department
MW- 2010 -06
Sidewalk Winter Maintenance
Service Requests and Policy Review
MW- 2010 -06
January 25, 2010
Municipal Works staff has received a number of phone calls from concerned citizens
requesting staff to extend the sidewalk winter maintenance program to include more
sections. The City currently has 6 sidewalk plow beats that target those sections meeting
the following criteria;
Heavily - traveled pedestrian routes along arterial streets including school and bus
routes,
In front of public buildings, including hospitals and churches,
Business Areas
School routes are plowed 12:00 a.m. to 8:00 a.m. - Monday through Friday. These sections
are plowed and salted once an accumulation of 8cm of snow has fallen and continuously
maintained until a bare condition is achieved. Current manpower and equipment resources
only allow us to cover about 177 km of sidewalk which represents about one -third of the
City's sidewalk assets. This program does not include any off road trails or pathways.
Annual reviews of the program are conducted and any changes are reported to City
Council for inclusion in the Operating Budget. While staff continues to look for efficiencies
by optimizing route plans, it has been increasingly difficult to add any additional sidewalk
sections without incurring additional delays in service delivery.
Staff believes that we can accommodate one short addition to the sidewalk on McLeod
Road near St. Michael's Secondary School without creating an impact on the existing
response times and the 2010 Operating Budget. Moving forward and for the benefit of
future budgets staff is also recommending that a full rationalization of this service is
January 25, 2010
- MW-2010-06
necessary including options to implement a By -Law that requires individual property
owners to assume responsibility for the clearing of adjacent sidewalks. This alternative,
which is common in other Niagara municipalities, also has its challenges which need to be
sorted out in advance of any new policy change affecting this service. Accordingly, staff will
need time to engage the public and examine the effectiveness of the best management
practices used in other jurisdictions. Service level changes and their corresponding budget
impacts will not affect the 2010 Operating Budget.
BACKGROUND
The City's Winter Maintenance Policy was updated and approved by City Council at its
meeting of December 10` 2007. Report MW- 2007 -134 included the following excerpts
pertaining to the provision of sidewalk plowing services using City forces.
The current minimum maintenance standard for road plowing is 8 cm or approximately 3
inches. Our past practice was to plow sidewalks once we start to receive snow
accumulation. This has set a very high service practice and created an even higher public
expectation. The City of Toronto had used the road policy as a guideline for sidewalk
plowing. Due to projected budget shortfalls they have just increased their side walk plowing
depth to 15 cm. Other municipalities have standards that range from plowing after 8 to 10
cm of accumulation, plowing only after the storm has finished, plowing sidewalks in a
priority pattern or having By -Laws that require residents and businesses to shovel the walk
in front of their property. The new standard proposed in this report is to commence
sidewalk plowing after there is an accumulation of 8 cm. (Same as roadway standard)
The City currently owns approximately 565 km of sidewalk which increases annually by
approximately 5 km, due to the assumption of Plans of Subdivision and infilling of missing
sidewalk sections. The current sidewalk program is designed (and budgeted) to maintain
only 177 km (less than one third).
Of the current 177 km that is maintained, there is a mix between main lines or class (2) &
(3) and secondary or class (4) residential roads. Sidewalks in residential areas are cleaned
to service walking routes for nearby schools. This program does not include trails.
Staff has received complaints from parents who believe that school routes should be
primary and that main line routes should be secondary. The public has difficulty
understanding that the secondary routes that service these schools connect to main line
routes. As well, the busy routes with higher traffic volumes and speeds, pose the greatest
risk to children's safety. Staff has experimented with plow routes in an attempt to address
these concerns.
Currently all sidewalks that are being maintained are receiving the same level of service.
This is to limit and mitigate liability exposure. The only exception to this is the mist area
around the Falls. This area is subject to rapid icing conditions that may require a machine
to be on regular patrol.
One of the public complaints is that machines are going over sidewalks that appear bare.
What the public does not understand is that once maintenance has begun we must
continue until bare sidewalks are achieved. Sidewalks that have been plowed are
subjected to a freeze /thaw cycle that will cause icing conditions.
January 25, 2010
-3- MW- 2010 -06
To prevent pedestrians from slipping and falling these conditions must receive an
application of salt over the entire length of the 177 -km route. There will be areas that are
bare, and other areas will be icy. This will not be known until the operator is on the site.
There are also times when staff will apply salt to address an approaching storm that may
consist of sleet or freezing rain.
The new Sidewalk Winter Maintenance Program is divided into six (6) routes. There are
seven (7) Trackless machines to perform this work. During an operation six (6) machines
are put out with one (1) machine being kept back as a spare. Sidewalk plowing and salting
takes 8 to 10 hours per route for an average storm with straight blade plows. Plows will
then be sent back out to try and remove all remaining traces of snow and ice by scraping
and reapplying salt.
When the snow fall is heavy or over a long period of time, the machines will need to
change from the standard straight plow blade to a blower attachment to handle the larger
volume. This attachment requires the operator to reduce the speed of the machine. It will
then take an average of 20 hours to complete a route due to the reduction of speed. Back
to back storms with heavy or wet snow may force sidewalks to be snow covered for a few
days, before a full and thorough cleaning can be fully completed.
Sidewalk Trackless machines are operated by two (2) full -time operators and four (4)
seasonal operators spread over three (3) shifts covering the city 24 hours a day 7 days a
week. The seasonal shift is from mid December until mid April. Additional operators from
spare lists are brought in to support the standard compliment once additional machines are
required or the normal operators have exhausted their hours of work. The recent changes
to the hours of work legislation have impacted our ability to cover these same routes as in
previous years.
One issue created by sidewalk plowing is lawn damage. Residents feel quite strongly
about this issue and staff receives numerous complaints from upset residents regarding
damage to the lawns. There is no simple solution to this issue. The machine plow blades
need to be wider than the machine wheel base or material would simply be pushed back
onto the walk by the wheels once the plow blade has gone by. In most cases the grass
adjacent to the walk is higher than the walk and the blade can peel it back.
Grass is most susceptible to damage, in the first few snow falls and the last few snow falls.
This is because there is no frost in the ground and the lawns are soft. Also until the routes
have been plowed to the point that windrows have been created operators can miss the
walk edge. Early snow falls can be heavy enough that the sidewalk disappears blending
into the surroundings. It then comes down to the drivers memory and land marks to
determine where the walk stops, starts or turns.
Lawn repair from plow damage runs from early May until completed. The more areas that
are plowed the more repair that will be required. This will be especially true if we were to
increase our residential plowing by going into areas that are only plowed occasionally.
These areas will not be familiar to operators and in all likelihood there would be a
substantial increase in lawn damage.
On November 17 2008, this policy was updated to reflect changes to the sidewalk routes.
Report MW- 2008 -68 recommended the removal of 9 sections and added 4 new ones.
ANALYSIS AND RATIONALE
Recommended by:
Approved by:
Respectfully submitted:
o l a
-
It is difficult for staff to measure the overall effectiveness of this service based solely on
public feedback because it is not provided to all residents. While this policy intends to
serve the community's needs there is continual pressure from seniors, physically -
challenged and recreation enthusiasts to improve and extend this service level.
In 2009, the City spent close to $359,000 and just over $247,000 in 2008. The expenses
are primarily manpower and equipment costs and are subject, of course, to weather
conditions in the first 4 months and last 2 months in any budget year.
Areas with sidewalk immediately adjacent to the curb pose additional challenges when
trying to coordinate the removal of snow from the road.
COMMITMENT TO COUNCIL PRIORITIES
The recommendation contained in this report is consistent with Council's priority to
continue to monitor and improve the efficiency of the Corporation.
ATTACHMENTS
1. Location Plan of new sidewalk addition
H n
Geoff ol ,, rector of Municipal Works
Ed Du'lovic, Executive irector of Corporate Services
Ken odd, Chief Administrative Officer
S:\REPORTS\2010 Reports \MW - 2010 -06 - Sidewalk Winter Maintenance 2010 Report.wpd
S
pH CRT
r
_KELSEY•CRES
N
FFORESTVIEW BCV ;
4STIAN
•
KUDLAC ====-,==:== 'f GLAVCIC_Ok'
UPPER CANADA DR
1 \\
WESTPORTOR
!!!At O
',p \� HEIKOOP CRS
z z q IELD C ES
N O ,MCGARFLY.
m -03-
73: ; •
3' CRT'
Niagara
January, 2010
KpALr� �. -- CHORUGY -
0 . ID_ FONLEE 9
< z rm
Nw�1 ' PAM F! I
i iOp
O VA(•- -E RIE. 10
COSTA�iL DR c nNt 2 � p wr�i
Tri 1
MAgCZ5t3 ST �'DF DR !,m0
WOODBINE ST
AINTREE OR; ° �VINDF
Ira' ( -
�l �v1 i�
60WAN; a1 p
or", ti �
M C RC �`O ..
'- p
T •
P
"0 - 010E DR_
'9S or C \R.
a q.-- 4i�ONG q e t x
w �9's
'
g�
mo c ' ;a
z ( . ,`.. otLE $T
m
-(
ORCHARD zAQVE.PKWY` �\ \.
: WOODSVIEW CRES
FO AVE s1 ' Qo 1,YNEy�ST
'HARVEST ORES ' S� II
SPRING BLOSSOM pR
LllNDY'S1ANE -
CATALINA ST ` pR
PIDEAU ST4 <n ALFRED
TAD ST
WESSYVOOD ST.
- a - ` . a >
\
ALEM S
T I
FIJ
� DR �� gs.3NRNdjl�Oti
13 FAIRFIELD PL
SIATGN CRT
O --
r
COVE RD ._-� RE
y 9 \
MCLEOD RD
INDUSTRIAL TT
1♦VANLESS
GRE NDAL&
i
ST to'
r i
SIDEWALK ROUTES - BEAT 6
tO p 0 a - ST' f . � 41 •� SHELDON ST
3 `'4 CRES \ ° �WOOD •
HOR yry44 t • -I, O m r > Q 0 1�RCY e
a �CREB m;t�rZ Ci ST m
%p t6LEN.QAT -
„AA w ti ISCOSI N T S _ 'C p 0 0�c m
C Re3 Qmi D: : 1 I �
riA 0,,c�./. 4RES
1 '.t m _ —
i CRE DIZ L � r - O i
cCRRE_�; AMLE
2DE � ) ICI{ Q:�CHERDRRYHI L`
'
�(O RT Aii u 1 �:
n '' , f I
■
MORRISON ST
min
------ . --- -- •
UNA PARK CRT
ETHE r y DEERkIEI:D CRES
sGPVEND, °. BAME7
'bIE11Fi6RT ° _ G PETRULLO CRT
A V ViAN
� 'z x. ' ri tLi t4
ST �.;i10 '47 Rv) STD
r
A
' c #1
mm ADGER P
CR ES
r.
K: \Standards \Maintenance Routes \Sidewalk Beats.map
_ LAMARSFST
BURDETTE DR i 7
9ROPP ST Sj - i
- 9RACKEN }` A tiL °
m
COACH DR
t1E
• 1 Q N
;Lao
S }oKES
6 -rP
d KEIFFER S3 O i - G 9 Auer
S DAWS -QN ST„ �` pAA.-
DC1 w O P_ O k.
m c =
\
_
DP • LEVUEST_�
#410wESt
i
.- FREDERI^ ST O SOP C ff RCOOK eri_
1`907, %GARDEN ST I O Z i
!(�t ' m` LEEST NG
°
Gill ST %
rn m
C O
03;
r _
Z
5T
GOODSIR
DIVSSION,ST
Z CEEMING'pS,
m° 0
mm 6
Schools
O i
12 W,LIAM ST`
• ' O PEfINS1ST
• 111
r
ALTHEA St
w
' CRES, { 2 \ •
, CatT ST.4
CABOT
°
STEVENS
VALLEY
Bt4K3NTE c
�, jv10NTE PJl`i'
•
• PROSPECT
M ' Z
ml I
D ? ,
MAETLAND ST
_m
UNDY'S LAANE',
BUCHNER PI
KER ST _
.. _BARKER -ST,_ - - --
MARANDAST -
_CUL.P.ST - „_ .;=.;;;;;.;=
TAYLOR ST
- MONROE ST _
ASH ST
HURRAY ST, -
•
M C MIL LAN D R - '5 �F 3.
'f CHESTNUT T y m
�/IC5 �AT)>: _ CRES Z - DUNN ST
m
m LEAWOCR C i 'c
: YL CRES C OD aim ! m
RF
*kARgARF�S 1
m:. D p �w,” m ATL S T:
E ONNIE ST _R - to
¢ Z D CR ES. : �,r Q _ .. � - -. G CHU H ILL ST Z ._ . � ,
:>
D < y m SKIIPJER ST
r < i1 Winer ST i� / 1 Y;271:MPiry
w - 0.1 v ARAD ST v
Q'. C ENT E NNIAL STOONCtlRD ; P : _ - - -
Cy
1 pS CRES D ¢E m m m C $T_
F • . a �- -- D 3 Lq
0
DOUGLAS ST m , •
AWKINS ST -
-. ifL
r-...-k, r HAM<INS ST VIL '
MANN ST m MCLEOD RD - -
IN AVE... C ; CRI,yF
C COOPER RI$ 2' m W DR '9,q l , O � `\O, LPK
� \ sr suNl D '11, . � � cRF `� r te�?? 6
& CRES b D • p p BAR 1 i `e in$f E soo- HERA?• 4 ; •
A C ° 'RP w D;x r - •d TRILLIUM •GF
A JILL bRm . , 'c > 3� 1 O 4 _ .. ?� - - .- _
VALIANT S - ` CHELSEA BRf�T(Lz A 'b Q '' SON ,,s‘. WILDROSE OR
CRES) - RB A . m`" r..
'� 1 b 0
f
R!
M
- to OLDFIELD RD
•
Proposed Additional Plow Route
Sidewalk Plow Route
Scale 1:NTS
Niagara u ,s
REPORT TO: Councillor Carolynn loannoni, Chair
Members of the Community Services Committee
City of Niagara Falls, Ontario
SUBMITTED BY: Transportation Services
SUBJECT: TS- 2010 -13
St. Clair Avenue
Bus Loading /Unloading Zone
RECOMMENDATION
EXECUTIVE SUMMARY
BACKGROUND
TS- 2010 -13
January 25, 2010
That the tour bus loading /unloading zone on the east side of St. Clair Avenue between
Huron Street and Queen Street be reinstated to reflect 2 hour parking between 9am -5pm,
Mon -Fri, with No re- parking within 5 hrs of initial parking.
The removal the tour bus loading /unloading zone on St. Clair Avenue will be replaced with
vehicle parking spaces for use by the public.
In the spring of 2009 the downtown BIA requested that on- street loading /unloading be
provided for tour buses, primarily in the vicinity of the Gypsy Theatre and The Buttery.
Subsequently, staff met with downtown BIA representatives and agreed upon two side
streets that could accommodate tour bus activity. As recommended in report TS- 2009 -26,
a loading /unloading zone was established on the east side of St. Lawrence Avenue
between Huron Street and Queen Street and on the east side of St. Clair Avenue between
Huron Street and Queen Street. After unloading passengers buses would then proceed to
the Niagara Falls Transit terminal to park or have services performed, and then proceed
back to the loading area to pick up the passengers. The on- street designated areas were
not intended for bus parking.
Since the installation of the loading /unloading zones, several complaints have been
received from the public, primarily requesting that the spaces on St. Clair Avenue be
converted back to vehicle parking spaces. It was believed that the tour bus activity had not
materialized, and thus the spaces may best service the immediate needs of patrons of
nearby businesses. A meeting with the BIA indicated that they are supportive of removing
the bus loading /unloading area on St. Clair Avenue between Huron Street and Queen Street
and reinstating the vehicle parking spaces.
January 25, 2010 TS- 2010 -13
- 2 -
The BIA continues to actively market the downtown and anticipates that tour bus traffic will
materialize in the future. At that time, at the request of the BIA, potential bus
loading /unloading zones will again be reviewed.
ANALYSIS /RATIONALE
The recommendation supports the request of the downtown BIA, in addition to addressing
the parking needs of nearby businesses.
FINANCIAL /STAFFING /LEGAL IMPLICATIONS
The replacement of the signs is to be carried out by Transportation Services staff. The
labour costs are accounted for in the 2010 General Purposes Budget. Cost studies
estimate that to remove and replace the signs is approximately $300.00.
LIST OF ATTACHMENTS
Study Area drawing
Recommended by:
Approved by:
Respectfully submitted:
M.Carrick
fl
Karl Dren, Dir ctor of Transportation Services
Ed Dujlovic, xec
utive Director of Community Services
Ken Todd, Chief Administrative Officer
S: \General Administration \GA 1.01 Reports\2010 Community Services\01 Jan 25 \TS- 2010 -13 St. Clair Avenue Bus Loading.wpd
N
11
4
ST CLAIR AVE
t
i . 2
o
1 1
CRYSLER AVE
5T LAWRENCE AVE
BUCKLEY AVE
a
-1
W
ONTARIO AVE
ST am
CRYSLER AVE
CATARACT AVE ' CATARACT AVE
N
111
w
ZIMMERMAN AVE
ERIE AVE
I
1 III
MI
® 1
l if Il
MI III ■
CRYSLER AVE
Mil
MI NM Mir r
MO
al i •
1
lei
ZIMMERMAN AVE
1 ii
ONTARIO AVE
C✓
7
ERIE AVE ERIE AVE ERIE AVE ERIE AVE
11
z z
cu
tit
1111111.
ZIMMERMAN AVE ZIMMERMAN AVE ZIMMERMAN A
a z
R AVE
b
CRYSLER AVE
5T LAWRE AVE
BUCKLEY AVE
, 6.
a
11
re
f
NEN
_
O
8
ST LAWRENCE AVE
BUCKLEY AVE
2
0
r
O
X
ST CLAIR AVE
r
1 1 1
ST LAWRENCE AVE
1 1 f--
BUCKLEY AVE
z
f
H
Og
ONTARIO AVE ONTARIO AVE
11
ST CLAIR AVE
CRYSLER AVE
0
O
2
E
Q.
EC
o
o
• a'
O 0
c
m O
C
M o
� • Lc)
C
N
73
co a
o
Q
O
�z
/150'
Niagara, g11s
rn�.ign
REPORT TO: Councillor Carolynn loannoni, Chair
and Members of the Community Services Committee
City of Niagara Falls, Ontario
SUBMITTED BY: Transportation Services
SUBJECT: TS- 2010 -02
Park Street
Traffic Operations Review
RECOMMENDATION
That an all -way stop control is installed at the intersection of Park Street and Crysler
Avenue, and that staff request the NRP speeding reports and investigate a possible
second all -way stop along Park Street.
EXECUTIVE SUMMARY
BACKGROUND
ANALYSIS /RATIONALE
TS- 2010 -02
January 25, 2010
The warrants for an all -way stop at the intersection of Park Street and Crysler Avenue have
been fulfilled. There is a sight line impediment which cannot be rectified at this time. A
speeding problem was not identified on Park Street. The overwhelming majority of all
vehicles travelling on Park Street between St. Clair Avenue and Crysler Avenue are
passenger cars.
At the September 28, 2009 Community Services Committee meeting, traffic concerns on
Park Street were identified by a resident. The concerns stem from motorists and
commercial bus operators speeding on Park Street near St. Clair Avenue, and the existing
traffic control at the intersection of Park Street and Crysler Avenue. In response to these
concerns, staff carried out radar speed studies on Park Street to determine the operating
speed, and carried out an intersection control review at the intersection of Park Street and
Crysler Avenue.
Park Street is a two -lane minor collector roadway extending in an east/west direction from
Victoria Avenue to River Road. In the study area the roadway is 10 metres in width and
consists of a curb face concrete sidewalk on each side. Crysler Avenue is a local
residential roadway extending in a north /south direction from Bridge Street to Jepson
Street. In the study area the roadway is 8 metres in width and consists of a curb face
concrete sidewalk on each side. At this time, the intersection of Park Street and Crysler
Avenue is controlled by a stop sign facing northbound and southbound motorists on Crysler
Avenue.
The results obtained from radar studies on Park Street between Ontario Avenue and
Crysler Avenue revealed an operating speed of approximately 55 km /h. Although it was
January 25, 2010 - 2 - TS- 2010 -02
noted that some motorists are travelling in excess of the legal speed limit of 50 km /h, a
speeding problem was not observed.
A vehicle classification study on Park Street revealed that passenger cars comprise
approximately 97% of all traffic, with trucks, buses and tractor trailers accounting for the
remaining 3 %. A possible increase in commercial bus traffic on Park Street may be
attributed to commercial bus operators driving to the Niagara Falls Transit parking lot.
Signs are present near the established bus loading and unloading areas on St. Lawrence
Avenue and St. Clair Avenue directing commercial bus operators to the Niagara Falls
Transit parking lot via Park Street.
The results obtained from intersection control review at the intersection of Park Street and
Crysler Avenue reveal that all -way stop control is warranted. A technical assessment of
this intersection identified that the available visibility for northbound motorists on Crysler
Avenue stopped at Park Street is well below the minimum safety standard per the
Geometric Design Guide for Canadian Roads. The building on the southwest corner of the
intersection is situated abutting the property line and is within the driver line of sight.
Drivers must partially encroach into the intersection to acquire an unobstructed view of
oncoming eastbound traffic.
To improve safety at this location by reducing the potential of angle collisions between
northbound and eastbound motorists, an all -way stop control is recommended for
installation. The proposed all -way stop control will necessitate all motorists travelling at this
intersection to complete a full legal stop. Adequate visibility at this intersection can be
obtained through a future sidewalk widening on the south side of Park Street or the
removal of the building.
FINANCIAL /STAFFING /LEGAL IMPLICATIONS
The installation of the signs and the application of pavement markings is to be carried out
by Transportation Services staff. The labour and material costs are accounted for in the
2010 General Purposes Budget. Cost studies estimate that the cost to manufacture and
install the signs and apply the pavement markings is approximately $1200.
LIST OF ATTACHMENTS
Study Area drawing.
Recommended by:
Approved by:
Respectfully submitted:
Karl Dren, Director of Transportation Services
Dujlovic, xecutive
Director Dujl ector of Community Services
1
Ken Todd, Chief Administrative Officer
Tim Burshtein
S: \General Administration \GA 1.01 Reports\2010 Community Services \01 Jan 25 \TS- 2010 -02 Park Street - Traffic Operations
Review.wpd
a °
z
Niagara, ?a1 s
REPORT TO:
SUBMITTED BY:
SUBJECT:
RECOMMENDATION
BACKGROUND
Councillor Carolynn loannoni, Chair
and Members of the Community Services Committee
City of Niagara Falls, Ontario
Transportation Services
TS- 2010 -03
Forestview Boulevard and Kalar Road
Traffic Operations Review
TS- 2010 -03
January 25, 2010
That an all -way stop control is installed at the intersection of Forestview Boulevard and
Parkside Road.
EXECUTIVE SUMMARY
The technical warrants for an all -way stop control at the intersection of Forestview
Boulevard at Parkside Road have been fulfilled.
The Principal of Forestview Public School identified concerns with respect to drivers
travelling at excessive speeds on Forestview Boulevard and Kalar Road, increased
vehicular and pedestrian traffic on Forestview Boulevard resulting from subdivision
expansion, and motorist and pedestrian behaviour at the intersections of Forestview
Boulevard at Kalar Road as well as Forestview Boulevard at Parkside Road.
Forestview Boulevard is a collector roadway that is approximately 10.5 metres in width.
The road cross - section consists of a curb and gutter on both sides, with a grass boulevard
and concrete sidewalk on the north side only. A sidewalk will be constructed on the south
side of Forestview Boulevard following the completion of a townhouse complex. Stopping
restrictions are present on both sides of Forestview Boulevard adjacent to the school
property to prohibit motorists from stopping their vehicle in this area and impeding through
traffic.
Kalar Road is a City arterial roadway. South of Forestview Boulevard, the recently
reconstructed road consists of two through lanes in each direction, a left turns lane for
northbound traffic, with each side containing a bike lane, curb and gutter, grass boulevard
and sidewalk. The intersection of Kalar Road and Forestview Boulevard is signalized. Two
(2) school crossing guards supervise persons crossing the north leg of the intersection.
Forestview Public School is located on the north side of Forestview Boulevard. The school
has an on -site school bus loading zone, kiss and ride program, and 100 parking spaces.
The parking supply is double the City's Zoning Bylaw requirement.
January 25, 2010 2 TS- 2010 -03
ANALYSIS /RATIONALE
A traffic recorder was installed for the duration of one week on Forestview Boulevard in the
vicinity of Forestview Public School to record traffic volume and speed data. Traffic volume
results indicate average daily volumes of approximately 2,300 vehicles on Forestview
Boulevard between Kalar Road and Parkside Road. These volumes are typical of a
collector roadway.
Speed studies identify that the operating speed on Forestview Boulevard is 51 km /h in the
morning and 52 km /h in the afternoon. Given the 50 km /h speed limit, a speeding problem
was not identified. On Kalar Road, north of Forestview Boulevard, the operating speed is
57 km /h in both the morning and afternoon. South of Forestview Boulevard, the operating
speed is 56 km /h in the morning is 56 km /h and 60 km /h in the afternoon. Additional speed
limit signing has recently been installed on Kalar Road between Lundy's Lane and McLeod
Road to advise drivers of the legal speed limit.
Staff carried out observations in the study area. The majority of students walking to school
originated from the east side of Kalar Road. Motorists were observed yielding the right -of-
way to the school crossing guard when they are lawfully carrying out their duties. Due to
the large parking facility on the school property, drivers are able to find on -site parking and
did not have to stop on the road to discharge or pick up passengers.
Very few children were observed walking from the west. This may be due to the fact that
the subdivision is not fully developed. A majority of drivers were observed not completing
a full legal stop at the intersection of Forestview Boulevard at Parkside Road. The low
compliance rate warrants police enforcement. Staff has requested the Niagara Regional
Police to carry out stop sign compliance.
Four collisions have occurred at the intersection of Forestview Boulevard and Kalar Road
in the previous three years. However, three of the four collisions occurred before the traffic
signals were operational.
Staff carried out a review of the Forestview Boulevard and Parkside Road intersection to
determine whether the technical criterion for an all -way stop control is met. The
intersection carries approximately 150 vehicles per hour during the busiest hours of the
day. The traffic volume split is nearly equal between the two roads, which is typical at
intersections of two collector roads. No collision has been reported at this intersection in
the previous three years, nor is there a sight line problem. However, the traffic volume and
volume split ratio at the intersection has met the minimum criteria needed to satisfy the
City's Residential All -Way Stop Warrants. Staff is recommending that an all -way stop
control be installed at the intersection of Forestview Boulevard at Parkside Road.
FINANCIAL /STAFFING /LEGAL IMPLICATIONS
The installation of the signs and the application of pavement markings is to be carried out
by Transportation Services staff. The labour and material costs are accounted for in the
2010 General Purposes Budget. Cost studies estimate that the cost to manufacture and
install the signs and apply the pavement markings is approximately $1200.
January 25, 2010
LIST OF ATTACHMENTS
Study Area drawing.
Recommended by:
Approved by:
Respectfully submitted:
Bart Skiba
3
Karl Dren, Director of Transportation Services
Ken Todd, Chief Administrative Officer
TS- 2010 -03
Ed Dujlovic, Executive Director of Community Services
•�
eu
as ▪ II
o a)
m as
ce L
O co • 0
NY
N L - E-
I— l < 1—
;rr,
4: 1
•,•
Niagara„lalls
REPORT TO: Councillor Carolynn loannoni, Chair
Members of the Community Services Committee
City of Niagara Falls, Ontario
SUBMITTED BY: Transportation Services
SUBJECT: TS- 2010 -04
Kalar Road
Parking & Bicycle Lane Review
RECOMMENDATION
EXECUTIVE SUMMARY
BACKGROUND
ANALYSIS /RATIONALE
TS- 2010 -04
January 25, 2010
That the "no parking anytime" restriction on the west side of Kalar Road between McGarry
Drive and McLeod Road be maintained.
Exclusive bike lanes are in effect at all times and are designated through a municipal
bylaw. For parking to be allowed on Kalar Road with a dedicated bicycling facility, even
if it is only during the winter months, both uses would have to be independent of each
other. This could only be accomplished if the road width was widened to accommodate
the additional width for a parking lane, or converting one of the through lanes into a parking
lane and a bike lane. Widening the road would require property acquisition and further
reduce the driveway space available at each residential unit. Eliminating a through lane
is not feasible as the technical analysis compiled for the Kalar Road Environmental
Assessment identified the need for two lanes in each direction to meet projected traffic
volumes.
Cycling is a form of active transportation promoted in large and mid -sized jurisdiction. In
the Niagara Falls Transportation Master Plan, Kalar Road is designated as a commuter
bike route intended to provide an important link between future cycling facilities on Lundys
Lane and McLeod Road which in turn form a portion of the overall cycling network within
the city.
Following the adoption of TS- 2009 -42 in October 2009 (report attached) City Council
requested Staff to review the feasibility of allowing on- street parking during the winter
months abutting the residential dwellings on the west side of Kalar Road between McLeod
Road and Loretto /Kate S. Durdan school in addition to a review of the bike lane
configuration on St. Paul Street in St. Catharines to determine whether that configuration
could be incorporated on Kalar Road.
The Ontario Traffic Manual identifies that designated bicycle lanes which are signed with
reserved bicycle lane signs "must be used to designate on -road lanes reserved exclusively
January 25, 2010
for bicycles with no time -of -day
conditions." There is no time and /or
date restriction applied "because
bicycle lanes typically have narrow
lane widths" which are insufficient for
use by other travel modes.
Therefore, a designated bike lane is
not able to be in effect during only
the summer months. Therefore,
alternate configurations to
accommodate both parking and a
bike lane were considered.
Unlike St. Paul Street, Kalar Road is ..-
a major collector road consisting of
two lanes in each direction with a
1.5 metre curbside bicycle lane on y
each side of the road. As well,
cyclists are afforded their own lane
that vehicle traffic is not allowed to
use. If drivers were allowed to park
on Kalar Road in the winter, their
vehicle would occupy the entire
bicycle lane and a portion of the
adjacent vehicular traffic lane.
Although, there are a reduced
number of cyclists in the winter, the
regulations dictate that a cycling
lane that is by -lawed is reserved
-2-
TS- 2010 -04
St. Paul Street Configuration
St. Paul Street in St. Catharines is a
primary collector route located in a
built up urban Central Business District. It is a two -lane, two -way road consisting of one
lane in each direction with an operating speed below 50km /h. Cyclists use the same lane
as vehicle traffic; there is no reserved facility exclusively for bike use. However, the lane
is slightly wider (.25 -.5m) than a typical lane. A "Share the Road" warning sign alerts
motorists to the presence of bicyclists and encourages cooperative behaviour. To further
advise drivers that cyclists are also entitled to use the road, pavement markings with the
bicycle symbol and arrows are painted within the right half of the traffic lane. This type of
"Share the Road " scenario is primarily used in downtown /business areas where there is
a limited road right of way (road space)
On- street parking is accommodated in a parking bay, similar to the indented parking bays
that exist on both sides of Queen Street in downtown Niagara Falls. Motorists are able to
park their vehicle without conflicting with the adjacent traffic lane. St. Catharines City
officials adopted this approach given that an exclusive 1.5 metre wide bike lane could not
physically be accommodated within the existing pavement width. This is an alternative
method of advising motorists of cyclists sharing the road. The signs are only advisory and
not regulatory, thus not requiring a by -law.
January 25, 2010 -3- TS- 2010 -04
exclusively for bicycles with no time -of -day conditions. Dedicated bike lanes are preferred
on high volume roads to ensure sufficient lateral clearance and maximize safety.
For a "share the road" lane to be incorporated on Kalar Road as is on St. Paul Street, the
dedicated bike lane would be removed and replaced with a parking lane. As a parking lane
is typically 2.5m., the parking lane would encroach into the through lane, thus eliminating
one through lane on Kalar Road. The elimination of this lane would cause undue traffic
delays on Kalar Road, as the additional through lane is required to adequately service the
traffic volumes. This area of Kalar Road experiences higher traffic volumes due to the joint
school, city park and proximity to McLeod Road. Staff is of the strong opinion that the St.
Paul Avenue configuration is not a suitable alternative for Kalar Road, due to:
•
traffic volumes on Kalar Road that necessitate two full through lanes in each
direction as per the Environmental Assessment report
vehicle operating speeds on Kalar Road that necessitate additional clearance
between motorists and cyclists
Preferred Parking Lane and Bike Lane Configuration
To fulfill geometric standards to accommodate an independent parking lane and a
dedicated bike lane the pavement width would need to be widened an additional 2.5m.
This in turn would result in further reduced front yard and driveway space for local
homeowners and would require property acquisition. Although, this alternative would meet
the needs of both cyclists and homeowners, it is not considered feasible due to the
financial and residential property impacts.
The following comments were received from the Trails and Bike Committee regarding the
bike lane on Kalar Road. "Our committee would like the continued support of Council to
not allow on- street parking in the bike lane zone on Kalar Rd. south, west side, no matter
what season it is. On- street parking, over a bike lane should never be encouraged, even
in the winter months. And note to, that on- street parking can disrupt traffic, not just cyclists.
Photo of vehicle parked and partially obstructing
through lane forcing motorist to pass
Kalar Rd area is an expanding and high residential
area which encompasses (4) schools, Niagara Falls
Girls Soccer Club, Niagara Square Mall, McBain
Community Centre and the coming Boys & Girls Club
that are all within a 1.5 km radius of this bike lane.
This area, with planned expansion on McLeod and
Kalar north (beyond Rideau) is slated to become
a model commute route. We all must encourage
active transportation (year round) for our citizens
health and providing bike lanes only adds to the safety
of cyclists and motorists who are forced to share the
road. Kalar Rd is already designated a major bike route for cyclists in the network of
Regional Niagara, a better route to the busier Montrose Rd, Kalar provides access to an
alternate route of Thorold Stone or Lundy's Lane for cyclists to cross the QEW. We
disagree with comments from residents that they "never see bicycles on Kalar Rd." and
find that a false statement. Another comment received was that WE are taking parking
spots away from them, to that I'd, personally like to comment that in fact, THEY are taking
January 25, 2010 -4- TS- 2010 -04
a bike lane away from US. As an important side note, after the recent approved extension
of this lane portion, the Trails & Bikeway Committee, with the support of Regional Health
Niagara has actively began to spearhead a rolling /walking school bus program in this area,
full and safe access to bike lanes is a key component."
CITY'S STRATEGIC COMMITMENT
Dedicated on -road bicycle facilities build upon City Council's vision for a comprehensive
transportation plan that promotes active transportation and provides for alternate modes
of travel.
LIST OF ATTACHMENTS
Study Area drawing
Recommended by:
Recommended by:
Recommended by:
Approved by:
Respectfully submitted:
Karl Dren, Director of Transportation Services
t.w ll„J.Ir�
Alex Herlovitch, Director of Planning and Development
1744,e
Denys Morrissey, Director of/Parks, Recreation &
Culture
Ed Dujlovic, Executive Director of Community Services
Ken Todd, Chief Administrative Officer
J. Grubich
S: \General Administration \GA 1.01 Reports\2010 Community Services \01 Jan 25 \TS- 2010 -04 Kalar Road - Parking & Bicycle Lane
Review.wpd
TS- 2010 -04
Kalar Road
N'iagcirafalh Parking & Bicycle Lane Review
Existing "No Parking" zone
Existing "No Standing" zone
Existing "No Stopping" zone I
Existing Bicycle lane
NOTE: Existing parking control shown
for the west side of Kalar Road only.
agaraF0 1
t 4 St t [i A
REPORT TO:
SUBMITTED BY:
SUBJECT:
RECOMMENDATION
EXECUTIVE SUMMARY
BACKGROUND
ANALYSIS /RATIONALE
Councillor Carolynn loannoni, Chair
Members of the Community Services Committee
City of Niagara Falls, Ontario
Transportation Services
TS- 2010 -06
McLeod Road
Speed Limit Review
TS- 2010 -06
January 25, 2010
That the speed limit on McLeod Road between Parkside Road and Garner Road is
reduced to 50 km /h.
A reduction to the speed limit from 60km /h to 50km /h is warranted for the section of
McLeod Road between Parkside Road west to Garner Road, as this area within the urban
boundary has been experiencing rapid development. The reduced speed limit will be
effective adjacent St. Michael secondary school, a group institution building located east
of Garner Road and the proposed Boys and Girls Club.
Staff has been requested to review the speed limit and signing on McLeod Road west of
Kalar Road and on Kalar Road north of McLeod Road.
McLeod Road has a 60 km /h speed limit between Thorold Townline Road and Parkside
Road. East of Parkside Road, the speed limit is 50 km /h. Previously the area west of
Kalar Road was rural in nature with few access points and buildings. St. Michael school
previously located on Valleyway relocated to McLeod Road in 2003 -2004. The residential
area initially commenced expanding west of Kalar Road in late 1990's, and currently
extends to Garner Road. The area still under development results in increased traffic
volumes on both McLeod Road and on Kalar Road. Most recently Kalar Road was
widened to a 4 -lane cross - section with traffic signals being installed at the intersection of
McLeod Road and Kalar Road. McLeod Road at Kalar Road was also reconstructed to full
buildout design with the intention to widen McLeod Road east of Kalar Road to a 4 -lane
cross - section. Given the urbanization, traffic volumes, land uses and access points,
studies indicate that a 50km /h speed limit is justified for this section of McLeod Road.
Kalar Road between McLeod Road and Lundy's Lane is currently 50 km /h, and there is no
justification to warrant a lower speed limit.
Given the continued development in the area and that a school and community building
January 25, 2010 -2- TS- 2010 -06
is located within the study area, a 50 km /h zone is more appropriate for McLeod Road east
of Garner Road. West of Garner Road, which is currently controlled by an all -way stop, the
speed limit will remain at 60 km /h.
An investigation of the speed limit signing on Kalar Road identified that some signs were
missing during our observations, and have been since installed.
In the absence of speed limit signing, the default speed limit within the City is 50 km /h and
this applies to both urban and rural streets. Signs are installed at major entry ways into the
City indicating "50 km /h Unless Signed Otherwise" and advertisements were published in
the local newspapers in November to remind residents of the default speed limit within the
municipal boundary.
FINANCIAL /STAFFING /LEGAL IMPLICATIONS
The relocation of the signs is to be carried out by Transportation Services staff. The labour
costs are accounted for in the 2010 General Purposes Budget. Cost studies estimate that
the cost to relocate the signs is approximately $240.
LIST OF ATTACHMENTS
Study Area drawing
Recommended by:
Approved by:
Respectfully submitted:
J. Grubich
Karl Dren, Director of Transportation Services
Ed Dujlovic, Executive Director of Community Services
Ken Todd, Chief Administrative Officer
E
0
0
EJ
-
N
N
O co 0.
(O L U)
-c E�
EYE
`JO
O O
in -0 co
w O
175 0 -17)
'X ®
WLL.W
iag Iraj a .h5
co�a�:�
REPORT TO:
SUBMITTED BY:
SUBJECT:
RECOMMENDATION
That by -law 89 -2000 (A by -law regulating parking and traffic on City roads) appearing on
tonight's agenda be approved.
EXECUTIVE SUMMARY
The amendment of by -law 89 -2000 will authorize the Director of Transportation to install
regulatory signs on city roads on a temporary basis.
BACKGROUND
To expeditiously address the safety of the public on a temporary basis the Director of
Transportation Services may be required to authorize the immediate installation of
regulatory signs ie. stop sign, yield sign. Typically, an amendment to by -law 89- 2000(A by-
law regulating parking and traffic on City roads) is required prior to the installation and
enforcement of these signs. However, on the rare occasion, it may be necessary to install
these signs on a temporary basis and prior to by -law amendment approval. Section No.
205.02.14 of the Traffic and Parking by -law 89 -2000 currently authorizes the Director to
erect parking prohibition signs as follows:
"Where the Director of Transportation Services is of the opinion that, for some temporary
period, the safety of the public, the proper movement of traffic, or the proper and safe
performance of some vital function of the City requires the prohibition of limited parking."
Therefore, Staff is recommending that this same authority be extended to include all
regulatory signs.
ANALYSIS /RATIONALE
Councillor Carolynn loannoni, Chair
and Members of the Community Services Committee
City of Niagara Falls, Ontario
Transportation Services
TS- 2010 -08
Authority for the Temporary Installation
of Regulatory Signs
TS- 2010 -08
January 25, 2010
Under certain circumstances, it may be necessary to erect signs on a temporary basis to
ensure the safety of the public, the proper movement of traffic, or the proper and safe
performance of some vital function of the City. This situation has recently occurred at the
intersection of Queen Street and Erie Avenue where an all -way stop control was deemed
necessary to be installed on a temporary basis until the removal of the hoarding protecting
the former Rosbergs building. The hoarding restricts visibility at the intersection, primarily
January 25, 2010 2 TS- 2010 -08
viewing westbound vehicles.
FINANCIAL /STAFFING /LEGAL IMPLICATIONS
The Financial impact will be the actual cost to erect the necessary signs.
Recommended by:
Approved by:
Respectfully submitted:
Karl Dren, Director of Transportation Services
Ed Dujlovic, Executive Director of Community Services
Ken Todd, Chief Administrative Officer
Niagararalls January 25, 2010
CA \'1DA
REPORT TO:
SUBMITTED BY:
SUBJECT:
EXECUTIVE SUMMARY
BACKGROUND
Councillor Carolynn loannoni, Chair
and Members of Community Services Committee
City of Niagara Falls, Ontario
Parks, Recreation & Culture
PRC- 2010 -01
Proposed 2010 Cemetery Fee Schedule
PRC- 2010 -01
RECOMMENDATION
1. That the 2010 Cemetery Fees be approved effective March 1, 2010.
2. That the 2010 Cemetery Fee Schedule be forwarded to the Ministry of Consumer
and Commercial Relations, Cemeteries Branch, for review and approval.
3. That staffs continue to review revenue opportunities and operating efficiencies of
cemetery services in 2010; and that staff report back to Council on options and
potential directions to further reduce the annual operating subsidy.
The costs to operate the cemeteries are heavily subsidized by the tax payer annually. A
proposed increase of 10% on all fees is recommended to offset the operating budget
deficit. The estimated 2010 subsidy, as included in the draft General Purposes Budget is
approximately $977,000.
The major source of revenue for the municipal cemeteries is derived from the sale of
graves and interments, and the annual interest from the `care and maintenance fund'. The
City cemeteries include Fairview (77 acres), Lundy's Lane(16 acres), Stamford
Presbyterian (2 acres), Drummond Hill (4 acres) and Stamford Green Columbaria, in
addition to sixteen semi - active and abandoned cemeteries (2.65 acres collectively).
Overall, the annual cost to operate the cemeteries are heavily subsidized by the tax payer.
On December 8, 2009 a meeting was held with a number of Niagara Falls funeral directors
to outline and discuss the 2010 financial challenges of cemetery services. In particular the
declining revenues achieved each year from the 'care and maintenance fund' due to the
significant drop in interest rates, and the impact this has had on annual cemetery revenues
was discussed.
The recommended 2010 fee schedule includes an approximate increase of 10% on all Lot
Sales, Opening and Closings and Surcharges. The proposed fee schedule is estimated,
based on approximately 315 burials per year and 270 lot sales per year, to generate an
increase in revenue of approximately $54,000 which is currently not included in the 2010
General Purposes Budget. Additionally, staff has also identified approximately $48,000
in additional reductions to the draft 2010 operating budget.
January 25, 2010 - 2 - PRC- 2010 -01
Applying both the estimated increased revenue and the reduction in expenses would adjust
the estimated draft operating cemetery services budget to $875,000 (from $977,000).
Included in the fee schedule is the elimination of the complimentary tent service for each
full burial. Consistent with most cemeteries, there would be a fee of $200 for a tent to be
provided as part of the burial service.
Staff will also be completing a 2010 comparison with other municipal cemeteries including
approximately twelve (12) municipal cemeteries within the Niagara Region and a number
of municipal cemeteries outside the region including Oakville, Owen Sound and Chatham
Kent.
FINANCIAL/STAFFING /LEGAL IMPLICATIONS
The costs to operate the cemeteries are heavily subsidized by the tax payer annually. A
proposed increase of 10% on all fees is estimated to provide additional revenues of about
$54,000 and are recommended to offset the operating budget deficit.
CITY'S STRATEGIC COMMITMENT
One of the seven (7) strategic priorities, identified in 2007 by Council, was to `identify and
evaluate alternative sources of revenue'. Given the fiscal challenges faced in 2010 and
what is anticipated in future years, a review of potential new revenue sources for Cemetery
services was initiated in conjunction with the 2009 Budget.
LIST OF ATTACHMENTS
Appendix A - 2010 Proposed Cemetery Fee Schedule
Recommended by:
Approved by:
Respectfully submitted:
CR/das
2i' '
Den s 1'
Mit
e Morrissey, Dir tor of Parks, Recreation &
Culture
Ed Dujlovic, xecutive Director, Community Services
Ken 1%/1/4 1 \ )(
Todd, Chief Administrative Officer
RESIDENT - INTERMENT RIGHTS
(Lot Sales)
CEMETERY
FEE
3ARE & MTNCE
TRUST FEE
TOTAL
FEE
5% GST
TOTAL
CHARGE
Adult Single Lot
$642.00
$428.00
$1,070.00
$53.50
$1,123.50
Preferred Adult Single Lot
$702.00
$468.00
$1,170.00
$58.50
$1,228.50
Adult Two Lot Plot
$1,284.00
$856.00
$2,140.00
$107.00
$2,247.00
Preferred Adult Double Lot
$1,404.00
$936.00
$2,340.00
$117.00
$2,457.00
Adult Three Lot Plot
$1,926.00
$1,284.00
$3,210.00
$160.50
$3,370.50
Adult Six Lot Plot
$3,852.00
$2,568.00
$6,420.00
$321.00
$6,741.00
Child /Infant Single Lot (Fairview)
$180.00
$120.00
$300.00
$15.00
$315.00
Stillborn Single Lot ( Lundy's Lane)
$138.00
$92.00
$230.00
$11.50
$241.50
Cremation Plot (Four Lots)
$324.00
$216.00
$540.00
$27.00
$567.00
Preferred Cremain Plot
$384.00
$256.00
$640.00
$32.00
$672.00
RESIDENT - INTERMENT SERVICES
(Burial Fees)
CEMETERY
FEE
PROVINCIAL
FEE
TOTAL
FEE
5% GST
TOTAL
CHARGE
Adult Casket Burial (TENT IS EXTRA FEE)
$920.00
$10.00
$930.00
$46.50
$976.50
Child Casket Burial (TENT IS EXTRA FEE)
$380.00
$10.00
$390.00
$19.50
$409.50
Infant/Stillborn Casket Burial (TENT IS EXTRA FEE)
$240.00
$10.00
$250.00
$12.50
$262.50
Cremains Urn Burial (TENT IS EXTRA FEE)
$275.00
$275.00
$13.75
$288.75
Cremains Scatter Burial (Fairview)
$135.00
$135.00
$6.75
$141.75
Cremains Urn Burial - Double (Admin. Fee)
$50.00
$50.00
$2.50
$52.50
Interment Cancellation - Casket
$300.00
$300.00
$15.00
$315.00
Interment Cancellation - Urn
$125.00
$125.00
$6.25
$131.25
One Time Care & Mtnce Fee ** Per Lot (grave)
$100.00
$5.00
$105.00
NON - RESIDENT - INTERMENT RIGHTS
(Lot Sales)
CEMETERY
FEE
BARE & MTNCE
TRUST FEE
TOTAL
FEE
5 %GST
TOTAL
CHARGE
Adult Single Lot
$963.00
$642.00
$1,605.00
$80.25
$1,685.25
Adult Two Lot Plot
$1,926.00
$1,284.00
$3,210.00
$160.50
$3,370.50
Adult Three Lot Plot
$2,889.00
$1,926.00
$4,815.00
$240.75
$5,055.75
Adult Six Lot Plot
$5,778.00
$3,852.00
$9,630.00
$481.50
$10,111.50
Child /Infant Single Lot (Fairview)
$270.00
$180.00
$450.00
$22.50
$472.50
Stillborn Single Lot (Lundy's Lane)
$207.00
$138.00
$345.00
$17.25
$362.25
Cremation Plot (Four Lots)
$486.00
$324.00
$810.00
$40.25
$850.50
NON - RESIDENT - INTERMENT SERVICES
(Burial Fees)
CEMETERY
FEE
PROVINCIAL
FEE
TOTAL
FEE
5% GST
TOTAL
CHARGE
Adult Casket Burial (TENT IS EXTRA FEE)
$1,385.00
$10.00
$1,395.00
$69.75
$1,464.75
Child Casket Burial (TENT IS EXTRA FEE)
$575.00
$10.00
$585.00
$29.25
$614.25
Infant/Stillborn Casket Burial (TENT IS EXTRA FEE)
$365.00
$10.00
$375.00
$18.75
$393.75
Cremains Urn Burial
$415.00
$415.00
$20.75
$435.75
Cremains Scatter Burial (Fairview)
$202.00
$202.00
$10.10
$212.10
Cremains Urn Burial - Double (Admin. Fee)
$50.00
$50.00
$2.50
$52.50
Interment Cancellation - Casket
$450.00
$450.00
$22.50
$472.50
Interment Cancellation - Urn
$187.00
$187.00
$9.35
$196.35
PLEASE NOTE:
1) All Committal Service scheduling is at the approval of the Cemetery's Section based on location, weather, staff availability & the number of services requested t
2) Monday to Friday Interment Services (except on statutory or City Holidays) may be scheduled between 10:00 a.m. & 3:15 p.m. only.
3) Saturday Services may be scheduled between 10:00 a.m. and 2:00 p.m. only
4) Sunday & Statutory Holiday Interment Services may be scheduled between 11:00 a.m. & 2:00 p.m.
5) A "Scheduled" Funeral Late Arrival & other interment surcharges will apply as indicated in the Cemetry Fee Schedule - "Interment Surcharges ".
6) Funeral late arrivals (arriving after the scheduled time) will be subject to an additional "Funeral Crew Standby" fee.
7) Funeral Directors are responsible for advising families, in advance, of potential funeral late charges & applicable surcharges.
" One Time Care & Maintenance Fee is charged for an interment (Full Body or Cremation) that takes place in a lot (grave) that was purchased prior to 1955.
CITY OF NIAGARA FALLS
PARKS, RECREATION & CULTURE
CEMETERIES FEE SCHEDULE
Effective March 1, 2010
APPENDIX A
ADMINISTRATION SERVICES
CEMETERY
FEE
5% GST
TOTAL
CHARGE
Interment Rights Transfer
$50.00
$2.50
$52.50
Interment Rights Exchange
$50.00
$2.50
$52.50
Interment Rights Replacement/Duplicate
$25.00
$1.25
$26.25
Double Cremain Interment/Companion Urn
$50.00
$2.50
$52.50
Cemetery Records Search (charge per hour)
25.00 /hr.
$1.25
$26.25
MEMORIAL PROGRAM
Memorial Tree
$300.00
$15.00
$315.00
Memorial Bench with 3" x 6" plate installed on back of bench
$1,250.00
$62.50
$1,312.50
Memorial Bench with bronze plaque (8" x 10 ") & stand
$1,600.00
$80.00
$1,680.00
Memorial Marker - Maple Grove Memory Lane (includes inscription)
$350.00
$17.50
$367.50
INTERMENT SURCHARGES
Weekday Funeral Late Arrival Scheduled After 3:15p.m.
$100.00
$5.00
$105.00
Funeral Crew Standby - Weekdays - Funeral procession arrives after scheduled time
30.00 / 1/4 hr.
$1.50
$31.50
Saturday Casket Burial - Arrival Before 2:00 p.m.
$370.00
$18.50
$388.50
Sunday & Holiday Casket Burial - Arrival Before 2:00 p.m.
$525.00
$26.25
$551.25
Saturday Cremains Burial - Arrival Before 2:00 p.m.
$190.00
$9.50
$199.50
Saturday Scatterin Burial - Arrival Before 2:00 p.m.
$90.00
$4.50
$94.50
Sunday /Holiday Cremains Burial - Arrival Before 2:00 p.m.
$280.00
$14.00
$294.00
Funeral Crew Standby - Sat., Sun. & Holidays - Funeral procession arrives after scheduled
40.00 / 1/4 hr.
$2.00
$42.00
TENT RENTAL (Adult/Child /Stillborn /Cremains Burials)
$200.00
$10.00
$210.00
Less Than 8 Working Hours Casket Burial Order
$175.00
$8.75
$183.75
Less Than 8 Working Hours Cremains Burial Order
$90.00
$4.50
$94.50
Lower & Seal Concrete Vault/Liner Lid
$40.00
$2.00
$42.00
Lower Concrete Vault/Liner Box
$70.00
$3.50
$73.50
FOUNDATION /MARKER
INSTALLATION SERVICES
CEM. FEE
5% GST
TOTAL
CHARGE
Concrete Foundation Per Cublic Foot - Supply & Install
$19.00
$0.95
$19.95
Foundation Installation (Minimum Charge)
$223.00
$11.15
$234.15
Pre -Pour Foundation (Section Q & P Double Plots)
$310.27
$15.51
$325.78
Foundation Removal
$150.00
$7.50
$157.50
Veteran Upright Marker Setting
$80.00
$4.00
$84.00
Small Flat Marker Setting Under 172 Square Inches
$50.00
$2.50
$52.50
Large Flat Marker Setting Over 172 Square Inches
$80.00
$4.00
$84.00
Corner Markers Setting (Per Set of 4)
$45.00
$2.25
$47.25
MARKER CARE & MAINTENANCE FEE CARE & MTNCE
5% GST
TOTAL
Flat Marker Over 172 Square Inches
$50.00
$2.50
$52.50
Upright Marker Including Base Up To 4 Feet High /Long
$100.00
$5.00
$105.00
Upright Marker Including Base Over 4 Feet High /Long
$200.00
$10.00
$210.00
DIS- INTERMENT SERVICES
CEM. FEE
5% GST
TOTAL
Adult/Child Dis- interment Only *
$900.00
$45.00
$945.00
Adult/Child Dis- interment & Re- interment
$1,630.00
$81.50
$1,711.50
Infant/Stillborn Dis- interment Only *
$300.00
$15.00
$315.00
Infant/Stillborn Dis- interment & Re- interment
$500.00
$25.00
$525.00
Cremains Dis- interment Only *
$150.00
$7.50
$157.50
Cremains Dis- interment & Re- interment
$350.00
$17.50
$367.50
* Remains are removed from Municipal Cemetery
PLEASE NOTE:
1) Dis - interments will take place on a day and at a time determined by the Manager of Cemeteries or designate.
2) Dis- interments may be scheduled from May 1st to November 1st only
3) Dis- interments not in a vault will be contracted out & will be the responsibility of the Funeral Director
4) The Funeral Director is responsible for the scheduling & all related costs of:
- casket/urn /vault removal - vault/urn unsealing & resealing - Niagara Regional Health Unit
CEMETERY FEE SCHEDULE
OPENING & CLOSING
CEMETERY
FEE
BARE & MTNCE
TRUST FEE
TOTAL
FEE
5% GST
TOTAL
CHARGE
RESIDENT - NICHE LEVEL A & G
$200.00
$10.00
$210.00
Single Niche
$375.00
$100.00
$475.00
$23.75
$498.75
Double Niche
$760.00
$190.00
$950.00
$47.50
$997.50
*administration fee for the 2nd inurnment if taking place the same time as the first and in the same Niche
RESIDENT - NICHE LEVEL B - F
Single Niche
$480.00
$120.00
$600.00
$30.00
$630.00
Double Niche
$880.00
$220.00
$1,100.00
$55.00
$1,155.00
NON - RESIDENT - NICHE LEVEL A & G
Single Niche
$560.00
$150.00
$710.00
$35.50
$745.50
Double Niche
$1,140.00
$285.00
$1,425.00
$71.25
$1,496.25
NON - RESIDENT - NICHE LEVEL B - F
Single Niche
$720.00
$180.00
$900.00
$45.00
$945.00
Double Niche
$1,320.00
$330.00
$1,650.00
$82.50
$1,732.50
COLUMBARIA PRODUCTS
CEMETERY FEE
GST
PST
TOTAL
GLASS - Single Niche
$35.00
$1.75
$2.80
$39.55
GLASS - Double Niche
$60.00
$3.00
$4.80
$67.80
BRONZE - Single Niche
$440.00
$22.00
$35.20
$497.20
BRONZE - Double Niche
$560.00
$28.00
$44.80
$632.80
OPENING & CLOSING
CEMETERY FEE
5% GST
TOTAL
CHARGE
RESIDENT - Single Inurnment
$200.00
$10.00
$210.00
NON RESIDENT - Single Inurnment
$300.00
$15.00
$315.00
Double Cremain Inurnment*
$50.00
$2.50
$52.50
*administration fee for the 2nd inurnment if taking place the same time as the first and in the same Niche
COLUMBARIA FEES
Effective March 1, 2010
STAMFORD GREEN HERITAGE COLUMBARIUM
NICHE & PRODUCT SALES
STAMFORD GREEN COLUMBARIA
OPENING & CLOSING
RESIDENT
CEMETERY
FEE
3ARE & MTNCE
TRUST FEE
TOTAL
FEE
5% GST
TOTAL
CHARGE
Double Niche - A & F
$600.00
$150.00
$750.00
$37.50
$787.50
Double Niche - B & E
$680.00
$170.00
$850.00
$42.50
$892.50
Double Niche - C & D
$760.00
$190.00
$950.00
$47.50
$997.50
*administration fee for the 2nd inurnment if taking place the same time as the first and in the same Niche
NON - RESIDENT
Double Niche - A & F
$900.00
$225.00
$1,125.00
$56.25
$1,181.25
Double Niche - B & E
$1,020.00
$255.00
$1,275.00
$63.75
$1,338.75
Double Niche - C & D
$1,140.00
$285.00
$1,425.00
$71.25
$1,496.25
COLUMBARIUM PRODUCT - Trillium Court
CEMETERY FEE
5% GST
8% PST
TOTAL
Bronze Wreath - includes inscription & installation
$550.00
$27.50
$44.00
$621.50
RESIDENT
CEMETERY
FEE
BARE & MTNCE
TRUST FEE
TOTAL
FEE
5% GST
TOTAL
CHARGE
Double Niche - A & F
$800.00
$200.00
$1,000.00
$50.00
$1,050.00
Double Niche - B & E
$880.00
$220.00
$1,100.00
$55.00
$1,155.00
Double Niche - C & D
$1,000.00
$250.00
$1,250.00
$62.50
$1,312.00
*administration fee for the 2nd inurnment if taking place the same time as the first and in the same Niche
NON - RESIDENT
Double Niche - A & F
$1,200.00
$300.00
$1,500.00
$75.00
$1,575.00
Double Niche - B & E
$1,320.00
$330.00
$1,650.00
$82.50
$1,732.50
Double Niche - C & D
$1,500.00
$375.00
$1,875.00
$93.75
$1,968.75
COLUMBARIUM PRODUCT - Trillium Court
CEMETERY FEE
5% GST
8% PST
TOTAL
Bronze Wreath - includes inscription & installation
$550.00
$27.50
$44.00
$621.50
OPENING & CLOSING
CEMETERY FEE
5% GST
TOTAL
CHARGE
RESIDENT - Single Inurnment
$200.00
$10.00
$210.00
NON RESIDENT - Single Inurnment
$300.00
$15.00
$315.00
Double Cremain Inurnment*
$50.00
$2.50
$52.50
*administration fee for the 2nd inurnment if taking place the same time as the first and in the same Niche
MAPLE GROVE - TRILLIUM COURT
NICHE & PRODUCT SALES
MAPLE GROVE - PRIMROSE & PERRIWINKLE LANES
NICHE & PRODUCT SALES
FAIRVIEW - MAPLE GROVE
OPENING & CLOSING
PD- 2010 -03
NiagaraFalls January 25, 2010
CANADA
REPORT TO: Councillor Carolynn loannoni, Chair
and Members of the Community Services Committee
City of Niagara Falls, Ontario
SUBMITTED BY: Planning and Development
SUBJECT: PD- 2010 -03
Commercial Building & Facade Improvement Application
CB &FIG - 2009 -006, 5841 -5845 Ferry Street
Hillside Holdings Inc. (Emidio Maroti and Peter Conte)
RECOMMENDATION
1. That Committee support the approval of the Commercial Building and Facade
Improvement Grant for 5841 -5845 Ferry Street subject to the owners satisfying all
the program requirements including all necessary City permits and entering into an
agreement with the City.
2. That the Mayor and Clerk be authorized to execute the grant agreement.
EXECUTIVE SUMMARY
The application can be supported because:
•
the items to be improved are eligible under the Commercial Building & Facade
Improvement Grant program;
the funding will help restore a two storey building that has deteriorated over the past
few years; and
sufficient funds are available in the CIP reserve account.
BACKGROUND
The City has received an application for a commercial building and facade improvement
grant for 5841 -5845 Ferry Street within the Historic Drummondville CIP area. The property
contains a large two storey vacant building which has been used in the past as a furniture
store and offices.
The proposed improvements under the building component include a new roof and
replacement of three roof top HVAC units. The cost estimate for these improvements is
$61,735. The work described in the improvements are eligible items and the applicant will
be entitled to receive a maximum grant of $10,000.
The applicants wish to improve the facade of the building and will be making application
for a facade improvement grant in the near future.
January 25, 2010 - 2 - PD- 2010 -03
As part of the grant application, the applicant will be required to enter into an agreement
with the City. The agreement details the responsibilities of the applicant in order to receive
the grant.
FINANCIAL IMPLICATIONS
The funding for the grant application will come from existing reserves for incentives. The
program requires all work to be completed within one year of Council's approval.
CITY'S STRATEGIC COMMITMENT
The approval of this application will comply with the City's strategic commitment in
implementing the financial incentive programs within the Historic Drummondville CIP and
will assist in the revitalization of the Main and Ferry area.
LIST OF ATTACHMENTS
► Appendix 1 - Location map of the subject property.
Recommended by:
Approved by:
Respectfully submitted:
u.„JAA-co
Alex Herlovitch, Director of Planning & Development
Ed Dujlovic, Executive Director, Community Services
v I
Ken Todd, Chief Administrative Officer
B.Bolibruck
Attach.
S: \PDR\2010 \PD- 2010 -03, CB &FIG - 2009 -006 5841 -5845 Ferry Street Maroti &Conte.wpd
January 25, 2010
5841 -5845 Ferry Street
Subf ect
- 3 -
APPENDIX 1
PD- 2010 -03
Location Map
OW NM
illiis —
MWM
pal illIM NOM
i ya
.....r■ r?m ■+11111111
rr
11011.4 11111191
II I1 ittt- ;. to ,
m1
■
a
January 2010
•
•
•
Niagara,Falls January 25, 2010
CANADA
REPORT TO: Councillor Carolynn loannoni, Chair
and Members of the Community Services Committee
City of Niagara Falls, Ontario
SUBMITTED BY: Planning & Development
SUBJECT: PD- 2010 -04
Commercial Building & Facade Improvement Application
CB &FIG - 2009 -007, 5894 -5900 Main Street
1302771 Ontario Ltd. (Adam Newington)
Agent: Chuck Vanoverbeke
RECOMMENDATION
BACKGROUND
PD- 2010 -04
1. That the Commercial Building & Facade Improvement Grant Application for 5894-
5900 Main Street be approved subject to the owner satisfying all the program
requirements including the requirements of City permits and entering into an
agreement with the City.
2. That the Mayor and Clerk be authorized to sign and execute the grant agreement.
EXECUTIVE SUMMARY
The application can be supported because:
the items of improvement are eligible under the Commercial Building & Facade
Improvement Grant program;
sufficient funds are available in the CIP reserve account; and
the work will improve the appearance of the building and have a positive impact on
the revitalization of Historic Drummondville CIP area.
The City has received an application for a facade improvement grant for 5894 -5900 Main
Street. There are two stores on the main floor that are currently vacant. The second floor
contains apartment units. The extent of improvements to the facade include structural
changes to the top of the outside wall, a new stucco surface on the second floor, stone
cladding on the first floor of the facade and new signage. The colours of the facade are to
satisfy the heritage colours as referenced in the City's draft Urban Design Guidelines (June
2007). The total cost of the improvements is estimated to be $27,900. The owner would
be eligible for the maximum facade grant of $10,000.
January 25, 2010 - 2 - PD- 2010 -04
ANALYSIS
The proposed work complies with the eligibility items contained in the Commercial Building
and Facade Improvement Program for the Historic Drummondville CIP. The detailed
finishing of the facade will satisfy the objective of creating a more historical appearance of
the building.
FINANCIAL IMPLICATIONS
The funding for this grant will come from existing reserves for incentives. The program
requires all work be completed within one year of Council's approval.
CITY'S STRATEGIC COMMITMENT
The approval of the grant application will comply with the City's strategic commitment by
implementing the financial incentive programs of the Historic Drummondville CIP and
encourage the continued improvement of facades in the area.
LIST OF ATTACHMENTS
► Appendix 1 - Location map of the subject property.
► Appendix 2 - Illustrates the proposed facade by the owner.
Recommended by:
Approved by:
Respectfully submitted:
AG414,1„
Alex Herlovitch, 1' ector of Planning & Development
Ed Dujlovic, Executive Director, Community Services
Ke Todd, Chief Administrative Officer
B.Bolibruck
Attach.
S: \PDR\2010 \PD- 2010 -04, CB &FIG - 2009 -007, 5894 -5900 Main Street Newington.wpd
January 25, 2010
5894-5900 Main Street
Subject Land
- 3 -
APPENDIX 1
PD-2010-04
Location Map
1
, f ,
1111=
111
Mils
nos
mum
4 1.
Mai ,, S.NR9I ;s lj
NVIUII IOW 1.01181
:4S1114 AV& EVAIII
1:6
1
11 1111
wi r I rn ii
111 11.11011
ir
. I ii.tvkia
11
imilivavew
1 1
raiz 1111161
of
a
January 2010
January 25, 2010
- 4 -
APPENDIX 2
PD-2010-04
•
•
•
Niagara,Falls January 25, 2010
CANADA
REPORT TO: Councillor Carolynn loannoni, Chair
and Members of the Community Services Committee
City of Niagara Falls, Ontario
SUBMITTED BY: Planning & Development
SUBJECT: PD- 2010 -05
Commercial Building & Facade Improvement Application
CB &FIG - 2009 -008, 6036 Main Street
1254225 Ontario Inc. (Victor and Anthony Fraone)
RECOMMENDATION
1. That Committee support the approval of the Commercial Building Improvement
Grant for 6036 Main Street subject to the owners satisfying all the program
requirements including all necessary City permits and entering into an agreement
with the City.
2. That the Mayor and Clerk be authorized to execute the grant agreement.
EXECUTIVE SUMMARY
The application can be supported because:
the items of improvement are eligible under the Commercial Building & Facade
Improvement Grant program;
sufficient funds are available in the CIP reserve account; and
the funding will help improve the appearance of the building and have a positive
impact on the Historic Drummondville CIP area.
BACKGROUND
PD- 2010 -05
The City has received an application for a commercial building and facade improvement
grant for 6036 Main Street within the Historic Drummondville CIP area. The property
contains a narrow 2 storey building which is vacant on the main floor and contains
apartments on the second floor. The main floor had been occupied by a design and print
shop.
The proposed facade improvements include a new awning and repointing of the front brick.
The cost estimate for the facade improvements is $3,950. The building component of
improvements include new plumbing at a cost estimate of $3,644. The total cost of
improvements is $7,594 and the owners would be eligible for a grant of 50% or $3,797.
As part of the grant application, the applicant will be required to enter into an agreement
with the City. The agreement details the responsibilities of the applicant in order to receive
the grant.
January 25, 2010 - 2 - PD- 2010 -05
FINANCIAL IMPLICATIONS
The funding for these grant applications will come from existing reserves for incentives.
The application requires all work to be completed within one year of Council's approval.
CITY'S STRATEGIC COMMITMENT
The approval of this application will comply with the City's strategic commitment in
implementing the financial incentive programs within the Historic Drummondville CIP and
will assist in the revitalization of the Main and Ferry area.
LIST OF ATTACHMENTS
► Appendix 1 - Location map of the subject property.
► Appendix 2 - Illustrates the proposed awning for the building.
Recommended by:
Approved by:
Respectfully submitted:
kolua4
B.Bolibruck
Attach.
S: \PDR\2010 \PD- 2010 -05, CB &FIG - 2009 -008, 6036 Main St. Fraone.wpd
Alex Herlovitch, Director of Planning & Development
Ed Dujlovic, xecutive Director, Community Services
Ken odd, Chief Administrative Officer
January 25, 2010
6036 Main Street
Sub Lcald
- 3 -
APPENDIX 1
PD-2010-05
Location Map
_ jIllIIU%IIll 1
uit
11 vemiilinI0
Elk00117" Fast
41'44 lir
!MIK.
1111111111 11111\greilir
of Niagara
*r U f"*1
1/Cir
4 '
111.=•-i;i:;111A ittio
111111in
IN OE 1 n1 ot
11 11u - rs
1 tri
January 2010
January 25, 2010
- 4 -
APPENDIX 2
PD- 2010 -05
Niagara,Falls January 25, 2010
CANADA
REPORT TO: Councillor Carolynn loannoni, Chair
and Members of the Community Services Committee
City of Niagara Falls, Ontario
SUBMITTED BY: Planning & Development
SUBJECT: PD- 2010 -06
Commercial Building & Facade Improvement Application
CB &FIG- 2009 -009, 6022 -6026 Main Street
1254225 Ontario Inc. (Victor and Anthony Fraone)
RECOMMENDATION
1. That Committee only support the approval of the Commercial Building Improvement
Grant for 6022 -6026 Main Street if the owners remove the existing billboards from
the roof of the property and satisfy all other program requirements.
2. If the billboards are removed from the top of the roof and other requirements are
satisfied, that the Mayor and Clerk be authorized to execute the grant agreement.
EXECUTIVE SUMMARY
The application cannot be supported as submitted because there are two billboards that
exist on the top of the building. The funding program for Historic Drummondville does not
support the approval of grants for buildings containing billboards. The applicant is aware
of this program requirement but has requested that the application still proceed before the
Committee for consideration.
BACKGROUND
PD- 2010 -06
The City has received an application for a commercial building and facade improvement
grant for 6022 -6026 Main Street within the Historic Drummondville CIP area. The property
contains a large 2 storey building. The main floor of the northerly section is vacant while
the southerly section is used as the Hair Gallery. The second floor contains apartments.
The proposed improvement under the facade program includes the erection of a new
awning. The improvement under the commercial building program is for a new heating
system for the hair salon. The cost estimate for the awning and heating system is $13,900.
If the owners were to be eligible for a grant, they would receive 50% or $6,950.
FINANCIAL IMPLICATIONS
Funding for these grants would come from existing reserves for incentives. The program
requires all work to be completed within one year of Council's approval.
January 25, 2010 - 2 - PD- 2010 -06
CITY'S STRATEGIC COMMITMENT
The approval of this application does not comply with the financial incentive programs of
the Historic Drummondville CIP as there are two billboards in the building. The Historic
Drummondville CIP excludes properties containing billboards from being eligible for
improvement grants. The BIA feels that billboard advertising is not conducive to creating
a rejuvenated commercial area and they should be encouraged to be removed. The grant
can only be considered for approval provided the billboard signs are removed.
LIST OF ATTACHMENTS
► Appendix 1 - Location map of the subject property.
► Appendix 2 - Photo of property illustrating existing billboards.
• Appendix 3 - Illustrates the proposed awning for the Hair Gallery.
Recommended by:
Approved by:
Respectfully submitted:
Alex Herlovitch, Director of Planning & Development
Ed Dujlovic, xecutive Director, Community Services
Ken odd, Chief Administrative Officer
B.Bolibruck
Attach.
S: \PDR\2010\PD- 2010 -06, CB &FIG - 2009 -009, 6026 Main St.Fraone Hair Gallery.wpd
January 25, 2010
6022-6026 Main Street
Subiect Land
- 3 -
APPENDIX 1
PD-2010-06
Location Map
IIM
11111111Vizi
11111irCzy
MP Pi
January 2010
January 25, 2010
- 4 -
APPENDIX 2
PD- 2010 -06
January 25, 2010
- 5 -
APPENDIX 3
PD- 2010 -06
•
•
•
Niagara,Falls January 25, 2010
REPORT TO: Councillor Carolynn loannoni, Chair
and Members of the Community Services Committee
City of Niagara Falls, Ontario
SUBMITTED BY: Planning & Development
SUBJECT: PD- 2010 -07
Commercial Building & Facade Improvement Application
CB &FIG - 2009 -010, 5769 Ferry Street
2211257 Ontario Inc. (Chris Rudan)
Agent: Emilio Raimondo
RECOMMENDATION
1. That Committee support the approval of the Commercial Building Improvement
Grant for 5769 Ferry Street subject to the owner satisfying all the program
requirements including all necessary City permits and entering into an agreement
with the City.
2. That the Mayor and Clerk be authorized to execute the grant agreement.
EXECUTIVE SUMMARY
The application can be supported because:
the items of improvement are eligible under the Commercial Building & Facade
Improvement Grant program;
sufficient funds are available in the CIP reserve account; and
the work will improve the appearance of the vacant building and have a positive
impact on the Historic Drummondville CIP area.
BACKGROUND
PD- 2010 -07
The City has received an application for a commercial building and facade improvement
grant for 5679 Ferry Street within the Historic Drummondville CIP area. The property
contains a large single storey building that had been previously used as the Concord Club
(Adult Entertainment Parlour). It is the intention of the owner to renovate and improve the
building for use as a bar and restaurant.
The proposed facade improvements include applying new stucco finish with decorative
cornice and other trim and molding. A new front window is being added with new canopy,
lighting and signage. The cost estimate for the facade improvements is $39,900. The
building component of the improvements includes a new flat roof which is estimated to cost
of $55,000. The total cost of the improvements is $94,900 The improvements to the
facade and roof are eligible items and the applicant will be entitled to a maximum grant of
January 25, 2010 - 2 - PD- 2010 -07
$20,000. As part of the grant application, the applicant will be required to enter into an
agreement with the City. The agreement details the responsibilities of the applicant in order
to receive the grant.
FINANCIAL IMPLICATIONS
The funding for these grant applications will come from existing reserves for incentives.
The application requires all work to be completed within one year of Council's approval.
CITY'S STRATEGIC COMMITMENT
The approval of this application will comply with the City's strategic commitment in
implementing the financial incentive programs within the Historic Drummondville CIP and
will assist in the revitalization of the Main and Ferry area.
LIST OF ATTACHMENTS
► Appendix 1 - Location map of the subject property.
► Appendix 2 - Illustrates the proposed facade of the building.
Recommended by:
Approved by:
Respectfully submitted:
Alex Herlovitch,,Director of Planning & Development
B.Bolibruck
Attach.
S: \PDR\2010\PD- 2010 -07, CB &FIG - 2009 -010 5769 Ferry Street Chris Rudan.wpd
Ed Dujlovi , Executive Director, Community Services
Ke Todd, Chief Administrative Officer
January 25, 2010
5769 Ferry Street
i --., - : •
aw , AS..
Me 4
16 1 1 ii
,ital
M4
ow Pm EININ 1IXONS Mal GrA a ' -' ' Atry: 1 , . ''''' P 1' 9 ri - ::*
ipmi~ owq+ wpm *sb.-1 -;="4 `: 1.1 i 1 • ,,
MN . Mira room tom - , , , 4,
1.11191th.,,,TKOCialg' alowx:iftmeo .4t.- ,, ' =Wills=
.1
-..,-.. s
immi 74 &1/41' WM tanotil4.,,, warm Alm
Hoc: 4 0 .11
mouPPGA ,',I ore! al - PAM ancosOn. : ." , 7 , -,4, ,, , Mil
a --
Nos mai ?lir saw Asia , .Ar. am ritimimev
NW wilessirm M oo f Poi W ' ami ' „,,... H,
MP. Wig 'WM MK Ville fienr &POMP .44.,.. ,- .A . 1.1, 1:1 %.,
;. I- MINN
1111111 i II all n10 higilli WM POW
111111111 OM iFiag laareg WO/ , Ai ZA . -.-
WISMEll
1 t ,;, i C. , 1: 1._1, :,1 A WS
mak A 6Clial
III . ."tAWF.,
19111111
woo mem,
maw 4. - II: r.:: u',..:t.,1 1 ;• iitti:i.U;4-1.1110
um tow atftle
00110"1" Zirilie!I 7 Pi ! i tti." 1 1 vil limiliii
iiiii iiiiiiiiiiiisac
LIJ
04,
-.11 lin
l'
• _.-s--;- 0„,
‘rit,
di 1110101
r
1111111N 0 :
111111-
Vtliikl
Subject
- 3 -
APPENDIX 1
Location Map
January 2010
PD-2010-07
January 25, 2010
- 4 -
APPENDIX 2
PD- 2010 -07
CITYOi• CANADA
NIAGARA FAILS_
The City of Niagara Falls, Ontario
Resolution
No.
Moved by
Seconded by
WHEREAS all meetings of Council are to be open to the public; and
WHEREAS the only time a meeting or part of a meeting may be closed to the public if the subject
matter falls under one of the exceptions under s. 239(2) of the Municipal Act, 2001 (hereinafter
referred to as the "Act "); and
WHEREAS s. 239(7) of the Act mandates that the municipality or local board or a committee of
either of them shall record without note or comment all resolutions, decisions, and other proceedings
at a meeting of the body whether it is closed to the public or not; and
WHEREAS s. 239(8) of the Act requires that the record required by subsection 239(7) shall be
made by the Clerk of the Corporation in the case of a meeting of council; and
WHEREAS on January 25, 2010, Niagara Falls City Council will be holding a Closed Meeting as
permitted under s. 239(2)(c)of the Act, pertaining to a proposed acquisition of land and s.
239(2)(d)pertaining to labour relations.
WHEREAS due to the nature of the discussion in the Closed Meeting related to labour relations,
it is not appropriate for City staff to be in attendance, save the Chief Administrative Officer and the
Director of Human Resources ( "HR "); and
WHEREAS s. 228(4) permits the Clerk the discretionary authority to delegate in writing to any
person, other than a member of council, any of the clerks powers and duties under the Act.
THEREFORE BE IT RESOLVED THAT on January 25, 2010, Niagara Falls Council will go into
a closed meeting to consider a matters that fall under the subject matter of s. 239(2)(c), a proposed
acquisition of land and s. 239(2)(d), labour relations or employee negotiations; and
FURTHER BE IT RESOLVED THAT on January 25, 2010 the Clerk, Dean Iorfida, delegates his
authority to the Director of HR, Trent Dark for the items related to labour relations or employee
negotiations; and
FURTHER BE IT RESOLVED THAT the Director of HR will record without note or comment
all recommendations to Council emanating from the Closed Meeting; and
FURTHER BE IT RESOLVED THAT the Clerk will resume his duties upon conclusion of the
Closed Meeting agenda.
AND The Seal of the Corporation be hereto affixed.
DEAN IORFIDA R. T. (TED) SALCI
CITY CLERK MAYOR