Loading...
Additions 2010/10/04ADDITIONS TO COUNCIL, MONDAY, OCTOBER 4, 2010 COMMUNITY SERVICES 1. F- 2010 -56 - Municipal Performance Measures a) Attachment - 2009 Municipal Performance Measures COUNCIL UNFINISHED BUSINESS 1. Letter of support from the Winter Festival of Lights for the Downtown Archways. COMMUNICATIONS 1. Winter Festival of Lights - Request approval to hold fireworks displays during the Festival season. RECOMMENDATION: For the Approval of Council 2009 Municipal Performance Measures Prepared by: Finance Department Date: October 4, 2010 NiagararaI)s Table of Contents 2009 Municipal Performance Measures 1 Overview 1 2 City of Niagara Falls Statistics 2 3 Operation or Core Areas Being Measured 2 4 General Government 4.1 General Government - (LT) 3 5 Protection 5.1 -5.4 Fire Services - (LT) 4 5.5 -5.6 Fire Services 5 6 Roadways 6.1 Paved (Hard Top) Roads - LT 6 6.2 Unpaved (Loose Top) Roadways - LT 6 6.3 Winter Control - LT 7 6.4 Bridges and Culverts 7 6.5 Adequacy of Roads - LT 8 6.6 Effective Snow and Ice Control for Winter Roads 8 6.7 Adequacy of Bridges and Culverts 8 7 Transit 7.1 Conventional Transit - Operating Costs - LT 9 7.2 Conventional Transit Ridership - LT 9 8 Wastewater 8.1 Wastewater Collection - LT 10 8.2 Wastewater Main Backups - LT 10 9 Stormwater 9.1 Urban Storm Water Management- LT 11 9.2 Rural Storm Water Management- LT 11 10 Drinking Water 10.1 Distribution of Drinking Water - LT 12 10.2 Boil Water Advisory Issued - UT 12 10.3 Water Main Breaks - LT 12 11 Solid Waste 11.1 Solid Waste Diversion (Recycling) Shared 13 12 Parks and Recreation 12.1 Parks - LT 14 12.2 Recreation Programs - LT 14 12.3 Recreation Facilities - LT 15 12.4 Subtotal: Recreation Programs & Recreation Facilities - LT 15 12.5 Subtotal: Parks, Recreation Programs and Facilities - LT 16 12.6 Participant Hours for Recreation Programs - LT 16 12.7 Hectares of Open Space - LT 17 12.8 Trails - LT 17 12.9 indoor Recreation Facilities - LT 18 12.10 Outdoor Recreation Facility Space - LT 18 Niagarafraq 13.5 Non - electronic Library Usage - LT 14 Landuse Planning 14.1 14.2 14.3 14.4 14.5 14.6 Location of New Residential Development — Shared Preservation of Agricultural Land in Reporting Year — Shared Preservation of Agricultural Land Relative to base Year — Shared Number of Hectares Re- designated during Reporting Year — Shared Number of Hectares Re- designated since Jan. 1, 2000 — Shared Size of Settlement Area 14.7 Change in Size of Settlement Area 2009 Municipal Performance Measures 13 Library Services 13.1 Library Services per Person — LT 19 13.2 Library Services per Use — LT 19 13.3 Library Uses per Person — LT 20 13.4 Electronic Library Usage — LT 20 21 21 22 22 23 23 24 24 Niagarayai1N 1 Overview 2009 Municipal Performance Measures The Municipal Performance Measurement Program (MPMP) is a program developed by the Ontario Ministry of Affairs and Housing requiring Ontario Municipalities to measure and report to the Ministry and taxpayers annually service delivery performance. MPMP is intended to enhance discussion about municipal service delivery and may be used as a starting point to investigate and identify best practice measures such as those identified by the Ontario Centre for Municipal Best Practices (OCMBP). MPMP data may be used by municipalities in budget discussions because trend data provides information on progress towards service objectives and information on how operating costs relate to service level decisions. MPMP Indicates a municipality's performance in selected core service areas. Currently there are 54 performance measurements in 12 core service areas. Since different levels of government are responsible for the delivery of services, the level of government which delivers a service will be the body responsible for reporting. For example, municipalities are responsible for reporting only the information relating to the local roads for which they are responsible. MPMP includes both efficiency and effectiveness performance objective. Efficiency measures provide Information on the cost of delivering services while effectiveness measures provide information on the performance relative to a goal. Together these two measures provide a picture of what is spent in a core service area and what Is achieved. Local circumstances such as geography, micro - climate conditions, municipality type and population affect results and need to be taken into consideration when comparing the date with other municipalities. Municipalities may compare their results with other similar municipalities; however, results may also be affected by significant differences in service delivery. Core services selected for the program must meet the following criteria: • Reflect major expenditure areas for municipalities; • Reflect areas of provincial - municipal interest; • Reflect high interest and value to the public; • Use data that is relatively easy to collect; and • Falls under municipal responsibility. MPMP will assist the City of Niagara Falls to provide better services to its citizens. The four main benefits of a performance measurement are enhanced accountability, innovation, improved performance and cost effectiveness. • Accountability — Performance measurement demonstrates accountability to taxpayers, how they are being served and the value they are receiving for their tax dollars. Accountability is strengthened by setting targets within each of the core service areas. • Improved Performance — Performance measurement identifies ways to provide efficient and effective services to the citizens. • Productivity and Creativity — Performance measurement can be used to stimulate staff creativity and productivity. • Improved Budget Process — Performance measurement can be used to assist municipalities in developing their budgets. It can also be used as a monitoring tool to determine if expected service levels are being achieved. • Notes 1. Lower Tier Responsibility of Service = LT 2. Upper Tier Responsibility of Service = UT 3. Shared Responsibility of Service = Shared 4. One Megalitre = 1,000,000 titres Page 1 Niagaraf �alls 2 City of Niagara Falls Statistics Households Population Youth Population Total Hectares in the Municipality Recreational Trails (Km) Hectares of Open Space _ Fire Stations Libraries Community Centres (City Owned) Swimming Pools -- City Owned (5 Outdoor; 1 Indoor) Ice Pads (4 Arenas) 3 Operation or Core Areas Being Measured 1. General Government 2. Fire Services 3. Police Services 4. Roadways 5. Transit 6. Wastewater 7. Storm Water 8. Drinking Water 9. Solid Waste Management 10. Parks and Recreation 11. Library Services 12. Land -Use Planning 2009 Municipal Performance Measures The measures in MPMP indicate a municipality's performance in selected core service areas. Over time and with feedback from municipalities and others, the Province may add additional measures. Currently there are 54 performance measurements in 12 core service areas. As noted earlier the municipality will only include in its report those services for which it is responsible. The core service areas for performance measurement Include: 34,253 1: 82,184 J 6,655 ........._.._ ..) 5.3 f 413.93 1 61 4J 2 6 (Ice Pads) 5 1 Page 2 4 General Government 4.1 General Government — (LT) Calculation 2008 J2009 Costs for Governance and Corporate Management 2 979 194 3,504.456 Total Municipal Costs 80,175,216 95,317,036 Niigarafig/IN 2009 Municipal Performance Measures Efficiency Measure — Costs for governance and corporate management as a percentage of total municipal costs. Definition — Costs for General Government support include expenditures for Council, CAO and Executive Directors. Total Municipal Costs include total costs for General Purposes, Wastewater, Libraries, Museums and Transit. Objective — Efficient municipal government. Page 3 Niagarafays Calculation 2008 2009 17.424,652 1 17 8,115,236 8,489,562 EWiciencv Measure - Costs for Fire Services per 1,000 of Total Property Assessment. Definition - Costs for Fire Services include administration, equipment, fire-fighting force, fire halls, fire prevention and inspection. Objective - Efficient Fire Services. 5 Protection 5.1 Fire Service - (LT) 5.2 Fire Services 5.3 Fire Services Objective - Effective Fire Services. 5.4 Fire Services Costs for Fire Services Total Property Assessment/1,000 Total Property Assessment means the total assessed value of taxable properties determined by the Municipal Property Assessment Corporation (MPAC). Calculation Total Number of Residential Fire Related Civilian Injuries Total Population/1,000 Effectiveness Measure - Number of residential fire related civilian injuries Definition - Objective - Effective Fire Services. Calculation 2008 Ipp9 Total Number of Residential Fire Related Civilian Injuries for 2005-2009 / 5 Total Population/1,000 . ..... ...„. ... ...... . Effectiveness Measure - Number of residential fire related civilian injuries averaged over 5 years per 1,000 persons. Definition - Calculation 2008 j_ 2009 Total Number of Residential Fire Related Civilian Fatalities Total Population/1,000 2009 Municipal Performance Measures 2008 10 82,184 2009 7 82,184 . . I 82,184 Effectiveness Measure - Number of residential fire related civilian fatalities per 1,000 persons Definition - Objective- Effective Fire Services. Page 4 Calculation i - 2008 I; 2009 I a Total Number of Residential Fire Related Civilian Fatalities for 2005-2009 / 5 0 Total Population/1,000 1' 82,184 , „ . . , .. ..... _......... . ,.., ... . ................ Effectiveness Measure — Number of residential fire related civilian fatalities averaged over 5 years per 1,000 persons NiagararOls 5.5 Fire Services Definition — Objective Effective Fire Services. 5.6 Fire Services Definition — Obiective — Effective Fire Services. Calculation Total Number of Residential Structural Fires Total Households/1,000 Effectiveness Measure — Number of residential structural fires per 1,000 households 2009 Municipal Performance Measures 2008 j; 2009 34,253 Page 5 Niagararg s 6 Roadways 6.1 Paved (Hard Top) Roads — LT Calculation Costs for Paved (hard top) Roads Total Paved Lane Kilometers Objective — Efficient maintenance of paved roads. ■ 6.2 Unpaved (Loose Top) Roadways— LT 2009 Municipal Performance Measures 2008 I 2009 — 3;1531g I ' Alb 3,553.492 I 8,989,559 ( 1,063 1,059 Efficiency Measure — Costs for paved (hard top) roads per lane kilometer. Definition — Paved (hard top) roads are defined as roads with an asphalt surface, concrete surface, composite pavement, Portland cement or surface treatment. A lane kilometer is a continuous land of road that conveys traffic in one direction. Maintenance includes heave /base /utility cut repair, cold mix patching, hot mix patching, shoulder maintenance, surface maintenance, surface sweeping and surface flushing. Calculation I 2008 I 2009 UMW: L Costs for Unpaved (loose to Roads 618,141 467,740 Total unpaved lane kilometers 34 34 Efficiency Measure — Costs for unpaved (loose top) roads per lane kilometer. Definition — Unpaved (loose top) roads are defined as roads with gravel, stone or other loose traveling surface. A lane kilometer is a continuous lane of road that conveys traffic in one direction. Objective — Efficient maintenance of unpaved roads. Page 6 Nizigarar04 6.3 Winter Control — LT Calculation Efficiency Measure — Costs for Winter Maintenance of Roadways per lane kilometer maintained in winter. Definition — Winter maintenance of roadways include sanding, salting, snow plowing, and snow removal. Objective — Efficient maintenance of roadways. 64 Bridges and Culverts Costs for winter maintenance per lane km Total lane km maintained . . „ Calculation Costs for bridges and culverts Total square metres of surface area on bridges and cuverts 2009 MunicipaL Performance Measures Efficiency Measure — Costs for bridges and culverts per square meter of surface area of bridges. Definition — Obiectiye — Efficient maintenance of bridges and culverts. 2008 2009 i igitna Ott* J 3.070.870 1111,617 1,093 1,097 2008 j; 2009 Ng N/A 676 475 14,502 Page 7 Niagara -qJ s 6.5 Adequacy of Roads — LT Number of paved lane kilometers where the condition is rated as good to very good Total number of paved lane kilometers Effectiveness Measure — Percentage of Paved Lane Kilometers where the condition is rated Good to Very Good. Definition — The Ministry recommends that municipalities use the Pavement Condition Index (PCI) or the Roads Inventory Management System (RIMS) Objective — Provide a paved road system that has a pavement condition that meets municipal objectives. 6.6 Effective Snow and Ice Control for Winter Roads — LT Calculation Number of winter events where the response met or exceeded locally determined municipal service levels for road maintenance Total number of winter events Effectiveness Measure — Percentage of Winter Events where the response met or exceeded locally determined municipal service levels for road maintenance standards. Definition — A winter response is a series of winter control activities performed in response to a winter event. A winter event is a weather condition affecting roads such as snow fall, wind blown snow, sleet, freezing rain, frost, black ice. Objective — Provide an appropriate winter storm event response. 6.7 Adequacy of Bridges and Culverts Calculation 2008 2009 Calculation Number of bridges and culverts where the condition of primary components is rated as good to very good requiring only maintenance Total number of bridges and culverts 2009 Municipal Performance Measures 66 VA � 1,059 1,063 2008 11 11 2008 ( 2009 �J 41 65 Effectiveness Measure — Percentage of bridges and culverts where the condition Is related as good to very good. Definition — Objecfive — 2009 t�UY I 20 20 Page 8 Niagara,'alts 7 Transit 7.1 Conventional Transit — Operating Costs — LT Ca lcul a tion Costs for conventional transit Total number of regular service passenger trips on conventional transit in service area Efficiency Measure — Conventional Transit costs per regular service passenger trips. Obfecfive — Efficient Conventional transit services. 7.2 Conventional Transit Ridership — LT Calculation Total number of regular service passenger trips on conventional transit in the service area Population of service area 2009 Municipal Performance Measures 2008 8, 633.179 1,414,064 2008 1,414,064 82,184 2009 9.410.190 1,453,907 Definition — Operation and maintenance of local conventional transit per regular service passenger trips, defined as all passenger trips where the fare system is applicable, including regular fare, reduced fare, free trips, passes and tickets. Transfers are not counted as passenger trips. 2009 i ttig 1, 453,907 82,184 Effectiveness Measure — Number of Conventional Transit Passenger Trips per person in the service area. Definition — Regular passenger trips are defined as all passenger trips where the fare system is applicable, including regular fare, reduced fare, free trips, passes and tickets. Transfers are not counted as passenger trips. Obiective — Maximum utilization of transit services. Page 9 NiagarahAN Objective — Efficient municipal wastewater collection. 8 Wastewater 8.1 Wastewater Collection — LT Calculation Costs for Wastewater Collection/Conveyance Total km of Wastewater Mains 8.2 Wastewater Main Backups — LT Total number of backed u D wastewater mains Kilometers of wastewater mains/100 2009 Municipal Performance Measures 2008 2009 2,701,963 4 481,036 410 411 . . „ . Efficiency Measure — Total Costs for the collection/conveyance, treatment and disposal of wastewater per kilometer of wastewater main. Definition — Operating costs for wastewater collection include expenditures for repair and maintenanco of collection, pipes, catch basins, pumps and overflow outlets, inspection and monitoring, cleaning and flushing. Calculation 2008 2009 1 12 4.10 OA I ER'ss .• j 4.11 Effectiveness Measure — Number of wastewater main backups per 100 kilometers of wastewater main in a year. Definition — backed up wastewater main occurs when the inflows to the wastewater collection pipe exceed the pipe capacity, forcing the inflows to back-up/flood. Objective — Municipal sewage management practices prevent environmental and human health hazards. Page 10 r Niagara) all. 9 Stormwater 9.1 Urban Storm Water Management — LT Calculation 2008 2009 a30$ f;it5 Costs for Urban Storm Water Management 148,721 3.365,148 Total km of Urban Drainage System plus (0.005 km times no. of catch basins) 345 345 Efficiency Measure — Costs for urban storm water management (separate storm water system — collection treatment, disposal) per kilometer of drainage system. Definition — Operating costs for urban storm water management include expenditures for maintaining catch basins, maintenance holes, monitoring and inspection, sewer cleaning, storm pump station and wetland maintenance. Objective — Efficient urban and rural storm water management. 9.2 Rural Storm Water Management — LT Costs for Rural Storm Water Management Total km of rural drainage system, plus (0.005 km time no. of catch basins) Efficiency Measure — Costs for rural storm water management (separate storm system - collection, treatment & disposal) per kilometer of drainage system. Definition — Operating costs for rural storm water management include expenditures for administration, catch basins, maintenance holes, culverts, ditching, vegetation maintenance and other rural storm water management expenditures, Objective — Efficient urban and rural storm water management. 2009 Municipal Performance Measures Calculat[on . 2008 I 2009 Eft 26,018 13.468 293 293 Page 11 Niagarafalls 10 Drinking Water 10.1 Distribution of Drinking Water - LT Calculation Costs for the Distribution of Drinking Water Total km of water distribution pipe Efficiency Measure — Costs for the distribution of drinking water per total km of water distribution pipe. Definition — Operating costs for the distribution of drinking water include repair and maintenance to water distribution pipe, valves, pumps and meters, flushing mains, testing water facility. Objective — Efficient distribution costs of drinking water. 10.2 Boil Water Advisory Issued — UT Calculation 2008 j 2009 a Summation of: number of boil water days times the number of connections affected 0 Total connections in the service area 27,081 I 27,142 Effectiveness Measure — Weighted number of days a Boll Water Advisory issued by the Medical Officer of Health, applicable to a municipal water supply was in effect. Definition — Weighted number of days a boil water advisory is in effect for a municipal water supply weighted by the number of connections affected. Objective — Water is safe and meets local needs. 10.3 Water Main Breaks — LT Calculation' Number of water main breaks In a year Total km of water distribution pipe/100 Effectiveness Measure — Number of water main breaks per 100 kilometers of water distribution pipe in a year. Definition — Reports in water main breaks per 100 km of water distribution pipe. Objective — Improve system reliability. 2009 Municipal Performance Measures 2008 2009 OMB I li I 3,086.958 6,205.161 441 443 2008 taw ...„ 63 4.41 2009 reg:6 4.43 Page 12 NiagaraJ'a 11 Solid Waste 11.1 Solid Waster Diversion (Recycling) — Shared Calculation Costs for Solid Waste Diversion Total Households 2009 Municipal Performance Measures 2008 : 2009 1 174.388 33,871 J 212.930 34,253 Efficiency Measure — Costs for solid waste diversion per household. Definition — Results for this measure may be affected by rural and urban mix; scope of diversion program and materials diverted; solid waste diversion rate, including level of public participation; pick -up services and frequency of pick -up. Objective — Efficient solid waste diversion services. Page 13 NiagaraM s 12 Parks and Recreation 12.1 Parks - LT Objective - Efficient operation of parks. 12.2 Recreation Programs — LT Calculation - - - - 2008 , -- - - -- �--- - -- 2009 _._ - - - - -- 1 Costs for Parks Total Population Efficiency Measure — Costs for parks per person. Definition — C osts for parks include expenditures for administration, Boards of Park Management, allotment (community gardens), flower gardens and floral displays, horticultural areas, natural areas, parks and parkettes, playgrounds, public squares, sports fields, skateboard parks and outdoor skating rinks. Calculation Costs for Recreation Programs Total Population Efficiency Measure— Costs for recreation programs per person. Definition — A recreation program involves some form of activity taking place in a municipality owned or leased facility or area. Recreation programs include both registered programs and unregistered drop -in programs. Objective — Efficient operation of recreation programs. 2009 Municipal Performance Measures 3,943.540 I 4.655.606 82,184 82,184 2008 *..4 1. 998 042 82,184 2009 893,720 82,184 Page 14 NiagaraFrtIIN 12.3 Recreation Facilities - LT Efficiency Measure - Costs for recreation facilities per person. Definition - Costs for recreation facilities include expenditures for administration, arenas, community centres and halls, gymnasiums, fitness centres, lawn bowling greens, skating rinks (excluding outdoor natural rinks), stadiums, swimming/wading pools, tennis courts, tourist camps and youth centres. Objective - Efficient operation of recreation facilities. 12.4 Subtotal: Recreation Programs & Recreation Facilities- LT Calcul i 2 008 I: 2009 I • WI 9 t I Mit' Costs for Recreation Programs & Facilities 1 4 Ji5 5 ,1 - 5 ---- 1 - '. - ..,4 2,-; Total Population I 82,184 82,184 Efficiency Measure - Costs for recreation programs and recreation facilities per person (subtotal). Definition - This measure is based on the sum of expenditures for recreation programs and recreation facilities reported and results are influenced by the number and type of parks and recreation facilities, the extent of recreation programming and volunteer involvement. Oblective - Efficient operation of parks, recreation programs and recreation facilities, Calculation Costs for Recreation Facilities Total Population 2009 Municipal Performance Measures 2008 1, 2009 13 1 3,761.509 i 4 860 548 82,184 82,184 Page 15 NiagaraJ?aI)s 12.5 Subtotal: Parks, Recreation Programs and Facilities — LT Calculation Costs for Parks, Recreation Programs & Facilities Total Population Efficiency Measure — Costs for recreation programs and recreation facilities per person (subtotal). Definition — This measure is based on the sum of expenditures for recreation programs and recreation facilities reported and results are influenced by the number and type of parks and recreation facilities, the extent of recreation programming and volunteer involvement. Objective — Efficient operation of parks, recreation programs and recreation facilities. 12.6 Participant Hours for Recreation Programs — LT Calculation Total Participant Hours for Recreation Programs Total Population/1,000 persons Objective — Recreation programs serve needs of residents. 2009 Municipal Performance Measures 2008 2009 8.703.100 1 10.409, 874 82,184 82,184 2008 2009 396.635 I' 414.605 82,184 J: 82,184 Effectiveness Measure — Total participant hours for recreation programs per 1,000 persons (registered, drop -in and permitted programs). Definition — Results are influenced by a number of factors including whether a municipality has a system In place for recording each type of programming, volunteer level and availability of facilities for programs, Including reciprocal agreements with school boards. Page 16 N iagar a q 12.7 Hectares of Open Space — LT Calculation Total Hectares of open space (municipality owned) Total Population /1,000 Effectivenss Measure — Hectares of Open Space per 1,000 persons (municipally owned). Definition — This measure standardizes the number of hectares of open space by dividing hectares by total population /1,000. Results may be influenced by types of open space, such as parks, natural areas, managed forests, etc. Objective — Open space is adequate for population. 12.8 Trails — LT Calculation 2008 . 1. 2009 1 L. 4 r 82,184 ' 82,184 Total kilometers of trails (municipally owned & third party) Total Population /1,000 Effectiveness Measure— Total kilometers of trails per 1,000 persons (owned by municipality and third parties). Definition — Trails provide an important resource and opportunity for recreation, leisure and physical activity. The total kilometers of trails include the length of all trails that fall under municipal responsibility or control. Trails may support a range of non - motorized and motorized recreational uses. Examples are walking /hiking, bicycling, riding /equestrian, and snowmobiling. Objective — Trails provide recreation opportunities. 2009 Municipal Performance Measures 1 2008 ( 2009 ... 447 384 414 82,184 j s 82,184 Page 17 Niagara !Js 12.9 Indoor Recreation Facilities - LT Square metres of indoor recreation facilities (municipally ownedl Total Population /1,000 Effectiveness Measure - Square meters of indoor recreational facility space per 1,000 persons (municipally owned). Definition - Indoor recreation facilities include built or endorsed structures used for the purposes of community recreation and leisure. Objective - Ensure recreation facility space is adequate for population. 12.10 Outdoor Recreation Facility Space - LT Calculation 2008 j 2009 Calculation Square metres of outdoor recreation facility space with controlled access and electrical or mechanical functions (municipally owned) Total Population /1,000 2009 Municipal Performance Measures Effectiveness Measure - Square metres of outdoor recreation facility space per 1,000 persons. Definition - Outdoor recreational facilities include city owned outdoor recreational facilities. Objective - Ensure recreation facility space is adequate for population. 4A0 i : WON J 338.952 338.952 82,184 82,184 2008 2009 g 1 _ fL°75.9 1381,683 1, 981,683 82,184 J ; 82,184 Page 18 Niagara)?aIs 13 Library Services 13.1 Library Services per Person — LT Calculation Costs for Library Services Total 4,453,154 5,022, otal Population 82,184 82,184 Efficiency Measure — Costs for library services per person. Definition — Costs for library services include expenditures for salaries, wages and employment benefits, materials, contracted services, rents and financial expenses, interfunctional adjustments and allocation for program support. Obfective — Efficient Library Services 13.2 Library Services per Use — LT Oblective — Efficient Library Services. Calculation Costs for Library Services Total Library Uses for Your Municipality Efficiency Measure — Costs for Library Services per use. 2009 Municipal Performance Measures 2008 I 2009 2008 J L__2009 j 4,453,154 5,022,319 6,441,282 8,770,340 Definition — This measure applies to a single -tier or lower -tier which is not a member of a union public library. Service delivery must involve a library board and the board has no service delivery contract with other municipalities. Total library uses include total annual circulation, library materials use, electronic information use, reference and library visits. Page 19 NiagaraJ?gI /s 13.3 Library Uses per Person — LT Calculation Total Library Uses Total Population Effectiveness Measure —Library Uses per person. Definition — Library uses include annual circulation, program attendance, library materials in use, number of people using computer workstations, number of time electronic databases are accessed by library users, number of standard reference transactions, number of electronic reference transactions, number of visits to library made in person and number of electronic visits to the library. Objective— Increased use of library services. 13.4 Electronic Library Usage — LT Calculation Electronic library uses a percentage of total library uses Effectiveness Measure — Electronic Library uses as a percentage of total library uses. Definition — Electronic library uses are based on the Annual Survey of Public Libraries conducted by the Ministry of Culture. Electronic library uses include the number of people using computer workstations, the number of times electronic databases are accessed by library users, the number of electronic reference transactions, and the number of electronic visits to the library. Objective — Increased use of library servlces. 2009 Municipal Performance Measures 2008 1- 2009 6.441.282 82,184 8.770.340 82,184 Page 20 Niagara t0 13.5 Non - electronic Library Usage — LT Non- electronic library uses as a percentage of total library uses Effectiveness Measure —Non- electronic library uses as a percentage of total library uses. Definition — Non - electronic uses are based on the Annual Survey of Public Libraries conducted by the Ministry of Culture. Non - electronic library uses include annual circulation, program attendance, library materials in use, the number of standard reference transactions and the number of visits to library made in person. Objective — Increased use of library services. Calculation — Since the measure is a percentage, the sum of electronic library uses and non - electronic library uses cannot exceed 100% 14 Landuse Planning 14.1 Location of New Residential Development - Shared Calculation Calculation 2008 J 2009 J Number of new lots, biocks, and /or units with final approval which are located within settlement areas. Total number of new lots, blocks and /or new units with final approval which are located within the entire municipality. 2009 Municipal Performance Measures 2008 2009 309 309 Effectiveness Measure — Percentage of new lots, blocks, and /or units with final approval which are located within settlement areas. Objective — New lot creation is occurring in settlement areas. 279 279 Page 21 Nia garaf ails 14.2 Preservation of Agricultural Land in Reporting Year — Shared Calculation Hectares of land designated for agricultural purposes in the Official Plan as of December 31 of the reporting year Hectares of land designated for agricultural purposes in the Official Plan as of January 1 of the reporting year. Obiective — Preservation of Agricultural Land. 14.3 Preservation of Agricultural Land Relative to Base Year — Shared Calculation Hectares of land designated for agricultural purposes in the Official Plan as of December 31 of the reporting year Hectares of land designated for agricultural purposes in the Official Plan as of January 1 of the reporting year Obfective — Preservation of Agricultural land. 2009 Municipal Performance Measures 2008 I" 2009 9,542 9,542 9.542 9,548 R &Qf 9,542 9,542 Effectiveness Measure — Percentage of land designation for agricultural purposes which was not re- designated for other uses during the reporting year. Definition — Results for this measure may be influenced by changes to the Official Plan or adoption of a new Official Plan; whether agricultural land is interpreted as land bearing any designation intended to preserve agricultural land; demand for new development; Geographic Information System (GIS) leads to changes in the number of hectares. 2008 I. 2 009 9.542 9,548 Effectiveness Measure — Percentage of land designated for agricultural purposes which was not re- designated for other uses relative to the base year of 2000. Definition — Results for this measure may be influenced by changes to the Official Plan or adoption of a new Official Plan; whether agricultural land is interpreted as and bearing any designation intended to preserve agricultural land; demand for new development; Geographic Information System (GIS) leads to changes in the number of hectares. Page 22 Niagara jays 14.4 Number of Hectares Re- designated During Reporting Year — Shared 2009 Municipal Performance Measures Calculation 2008 J 2009 Number of Hectares Re- designated During Reporting Year — Shared Effectiveness Measure — Number of hectares of land originally designated for agricultural purposes which was re- designed for other uses during the reporting year. Definition — This measure provides the number of hectares that were re- designed during the reporting year and supplements the measure — percentage of land designated for agricultural purposes which was not re- designated for other uses during the reporting year. Objective— Preservation of agricultural Land. 14.5 Number of Hectares Re- designated since January 1, 2000 — Shared Calculation 2008 J 2009 Number of Hectares Re- designated since January 1, 2000 — Shared Effectiveness Measure — Number of hectares of land originally designated for agricultural purposes which was re- designated for other uses since January 1, 2000. Definition — This measure provides the cumulative number of hectares that were re- designated since January 1, 2000 and supplements the measure — percentage of land designated for agricultural purposes which was not re- designated for other uses relative to the base year 2000. Objective — Preservation of Agricultural land. Page 23 N6gararrOM Objective - 14.6 Size of Settlement Area Calculation 2009 Municipal Performance Measures Hectares of land in the settlement area as of December 31, 2007 14.7 Change in Size of Settlement Area Calculation i 2008 Hectares of and in the settlement area as of December 31, 2007 less the number of hectares of land in the settlement area as of January 1, 2004 Hectares of land in the settlement area as of January 1, 2004 2008 J; 2009 Effectiveness Measure — Hectares of land in the settlement area as of December 31 of the reporting year. Definition - 5 9,10 Effectiveness Measure — Hectares of land in the settlement area as of December 31 of the reporting year. Definition - Objective - 2009 ?tl�10 5 9,210 Page 24 (9/30/2010) Dean lorfida - Letter of Support - Downtown Archways From: To: CC: Date: Subject: Attachments: Mayor Salci and Members of Council: I would have preferred to register the Festival's support in person however I will be out of town Monday. If you have any questions about the contents of the letter I am available to discuss tomorrow or over the weekend. Thanks, Dino 5400 Robinson Street Niagara Falls, ON L2G 2A6 "Dino Fazio" <Dino @wfol.com> "Ted Salci" <tsalci @niagarafalls.ca >, "Janice Wing" <jwing @niagarafalls.... "Joe Miszk" <admin @bettysrestaurant.com >, "Toni Williams (DBM)" <toni @qu... 9/30/2010 8:16 AM Letter of Support - Downtown Archways Letter of Support - Archways Council 09 30 10.doc www.WFOL.com <http: / /www.wfol.com /> Volunteer - http : / /www.wfol.com /volunteer.html Follow us on Twitter - http : / /twitter.com/WinterFestival <blocked::http://twitter.com/WinterFestival> Join our Facebook group - http: // groups .to /winterfestivaloflights/ 28th ANNUAL CAA WINTER FESTIVAL OF LIGHTS NOV. 6 - JAN. 31, 2011 Make It Your Winter Tradition! RINK AT THE BRINK DEC. 1 - FEB. 28, 2011 Open -air ice skating a snowball's throw from the Falls! "Flip the Switch" Opening Ceremonies Page 1 (9/30/2010) Dean Iorfida - Letter of Support - Archways Council 09 30 10.doc Page 1 September 30, 2010 Mayor Ted Salci & Members of City Council City Hall, P.O. Box 1023 4310 Queen Street Niagara Falls, ON L2E 6X5 RE: Downtown Street Archways Dear Toni: Via Email The recent article in the Niagara Falls Review and the meeting scheduled for October 4 to discuss the possibility of cancelling the fifteen (15) archways to be installed along Queen Street have prompted me to write this letter of support in favour of retaining the archways. I cannot stress enough the importance the archways have in the `big picture' relationship the Festival and Downtown Board of Management (DBM) are creating. Working in partnership with the DBM, the Festival plans to introduce Queen Street — to be identified as Santa's Village — as a significant addition to the CAA Winter Festival of Lights, which will undoubtedly take if from being the largest winter lights festival in Canada to becoming the foremost winter illumination festival in North America. Besides the planned building and street lighting, animated displays, 'dressed windows' (think Neiman Marcus NYC), and illuminated archways, DBM members are also hosting weekly visitor enticements such as demonstrations (chocolate and glass blowing) and other sales incentives; while the Candle Light Stroll will also carry the Santa 's Village theme. In fact, we've confirmed a visit by Santa with his sleigh and reindeer. At the same time, Festival Ambassadors will be directing the 60,000+ vehicles expected to visit Dufferin Islands (55% from Niagara Region and a key market for downtown) during the Festival to the brand new Santa's Village area. I trust this traffic would certainly be appreciated by the many businesses located downtown; I further expect Santa 's Village will, over time, play a significant role in the continued development of Queen Street, and assist in the revitalization of its economic role in the community. In conclusion, I again stress the importance of ensuring the archways — in all their illuminated glory — remain a part of Santa 's Village. (9/30/2010) Dean lorfida - Letter of Support - Archways Council 09 30 10.doc Page 2 Sincerely, WINTER FESTIVAL OF LIGHTS Dino Fazio General Manager cc: Joe Miszk, WFOL Chair Toni Williams, DBM GM Festiva1cLlghts NIAGARA FALLS * ONTARIO * CANADA August 31, 2010 Mr. Dean Iorfida, City Clerk The City of Niagara Falls City Hall, P.O. Box 1023 4310 Queen Street Niagara Falls, ON L2E 6X5 RE: Winter Festival of Lights - Fireworks Dear Dean: 5400 Robinson Street, 2nd Floor Niagara Falls, ON L2G 3X4 Tel: 905 - 374 -1616 • Fax: 905 - 374 -4683 Email: Info @wfol.com • WFOL.com The Winter Festival of Lights plans to hold fireworks displays over the falls during the Festival season and requests City Council approval for such. We are utilizing the services of David Whysall International Fireworks, the same firm used by The Niagara Parks Commission for the summer fireworks displays. As always, the Festival shall be properly insured for this and will add all concerned parties as additional named insured. At this time, we are requesting City Council approval for pyrotechnic fireworks displays to occur as follows: Saturday, November 6, 2010 * 6:45 & 8 PM Friday, November 12, 2010 * 9 PM Friday, November 19, 2010 * 9 PM Friday, November 26, 2010 * 9 PM Friday, December 3, 2010 * 9 PM Friday, December 10, 2010 * 9 PM Friday, December 17, 2010 * 9 PM Friday, December 24, 2010 * 9 PM Should you have questions please contact me at 905 374 -1616 x. 46. Sincerely, WINTER FES ' VAL OF LIGHTS Dino F .. Gener. Manager