2001/12/03PLANNING MEETING
December 3, 2001
PRAYER: Alderman Ken Feren
DISCLOSURES OF PECUNIARY INTEREST
Disclosures of pecuniary interest and a brief explanation thereof will be made for the
current Council Meeting at this time.
PRESENTATIONS
Mr. Jeff Morgan, on behalf of the Morgan Family and Funeral Home staffwishes
to make a presentation to the Fire Chief related to the events of September 11, 2001.
DEPUTATIONS
Mayor's Youth Advisory Committee
Dan Costabile and Victoria Barnabi, of the Mayor's Youth Advisory Committee
wish to address Council - and - JoAnne Heft, Executive Director of The Boys and Girls
Club of Niagara, Michael Carey, Chairman, Youth Activities & Programs at The
Optimist Club and Inspector Doug Kane, Niagara Regional Police Service, wish to
address Council in suppor/of the Skate Park.
- AND -
Report R-2001-53 - Chair, Mayor's Youth Advisory Committee - Re: Skate Park
Request from the Mayor's Youth Advisory Committee.
The Niaeara Gatekeepers Proeram
Renate Martin, Program Coordinator, wishes to introduce the Niagara
Gatekeepers Program to Council and to the community, a program designed to identify
seniors at risk.
-2-
Alderman Ioannoni has requested the opportunity to address Council on the issue
of Community Policing and Crime Prevention Thru Environmental Design (CPTED),
ITEM NO. 4t
ITEM NO. 42
PLANNING MATTERS
Public Meeting
Zoning By-law Amendment Application
(Revised) AM-11/2001, 6365 Drummond Road
Applicant: Ralph Terrio
Agent: Dennis Savriga
Proposed Residential Redevelopment
Background Material:
Recommendation Report: PD-2001-104
Public Meeting
Zoning By-law Amendment Application
AM-31/2001, 3109 Ussher Street
Applicant: Mr. & Mrs. Willick
Agent: Michael Allen
Proposed Accessory Apartment
Background Material:
Recommendation Report: PD-2001-106
- AND -
Correspondence from Garry & Connie Anderson
Correspondence from Nathaniel Reid
Correspondence from Paul J. Wintemute
Correspondence from Jim Albon
Correspondence from Lina & Larry Wall
Correspondence from Invanka, Karmelo & Daniel Ivankovac
Petition from concerned residents, headed by H. Michitsch
Correspondence from Alan Willick
ITEM NO. 43
ITEM NO. 44
-3-
Public Meeting
Zoning By-law Amendment Application
AM-32/2001, 5845 & 5851 Victoria Avenue
Applicant: Enrico DiRisio
Agent: Italia Gilberti
Niagara Imperial Hotel
Background Material:
Recommendation Report: PD-2001-107
Public Meeting
Official Plan & Zoning By-law Amendment
AM-17/2000; Miller Road Estates Draft Plan of Subdivision,
727604 Ontario Limited.
Background Material:
Recommendation Report: PD-2001-111
- AND -
Correspondence from Regional Niagara, Planning &
Development Department
Correspondence from Regional Niagara, Public Health
Department
Correspondence from Ms. Gail Morellato
Correspondence from The Niagara Parks Commission
Correspondence from the Niagara Peninsula Conservation
Authority
Correspondence from Canadian Niagara Power Inc.
MISCELLANEOUS PLANNING MATTERS
Chief Administrative Officer
PD-2001-108, Updating the Tourist Area;
Development Application Guide.
Chief Administrative Officer
PD-2001-109, Regional Policy Plan Amendment
No. 166, Metcap Living.
Chief Administrative Officer
PD-2001-110, Burnfield Lane Draft Plan of
Condominium: 3241 Montrose Road; Owner:
Grey Forest Homes Ltd.
ADOPTION OF MINUTES:
-4-
REGULAR COUNCIL
Regular Council Minutes of November 26, 2001.
MAYOR'S REPORTS, ANNOUNCEMENTS, REMARKS
REPORTS
RATIFICATION OF COMMUNITY SERVICES COMMITTEE ACTIONS
(Alderman Victor Pietrangelo, Chair)
Chief Administrative Officer
MW-2001-164, Tender 2001-109-01, Valleyway,
Longhurst Avenue & Garner Road; Watermain
Replacement.
2. Chief Administrative Officer CS-2001-11, Jolley Cut
- AND -
Correspondence from Mr. Jim Brown
Which attaches a Petition.
CORPORATE SERVICES MATTERS
1. Chief Administrative Officer
HR-2001-05, OMERS Pension Plan Adjustments.
FINANCE MATTERS
1. Chief Administrative Officer
2. Chief Administrative Officer
F-2001-75, Borrowing By-law.
F-2001-76, Municipal Accounts.
MISCELLANEOUS MATTERS
Chief Administrative Officer
Chief Administrative Officer
CD-2001-13, 2002 Council Schedule.
CD-2001-14, Appointments to Boards,
Commissions and Committees.
Chair, Body Rub Parlour
Committee
Chief Administrative Officer
-5-
Report of the Body Rub Parlour Committee
Re: Marijana Kovinic.
L-2001-70, Establish Part 3 on Reference Plan
59R-11368 as a Public Highway to be known as
Garner Road.
RATIFICATION OF COMMITTEE-OF-THE-WHOLE ACTIONS
BY-LAWS
The Acting City Clerk will advise of any additional by-laws or amendments to
the by-laws listed for Council consideration.
2001-258 To amend By-law 89-155 and adopt a Schedule of Meetings.
2001-259
To authorize the temporary borrowing of TWENTY-THREE MILLION
DOLLARS for current expenditures for the current year and to authorize the
temporary borrowing of SEVENTEEN MILLION, FIVE HUNDRED
THOUSAND DOLLARS for the acquisition of a certain rail line in the City of
Niagara Falls.
2001-260
To amend By-law No. 95-86, being a by-law to appoint municipal by-law
enforcement officers for the City of Niagara Falls.
2001-261
To authorized the execution of an agreement with Fine Grade Construction
Ltd. respecting the watermain replacement on Valley Way, Longhurst Avenue
and Garner Road.
2001-262
To amend By-law No. 99-140, as amended, being a by-law to appoint
Municipal By-law Enforcement Officers for the City of Niagara Falls.
2001-263
To establish Part 3 on Reference Plan 59R-11368 as a public highway, to be
known as and to form part of Garner Road.
2001-264 To adopt the Tourist Area Development Application Guide.
2001-265 To authorize monies for General Purposes (December 3, 2001)
NEW BUSINESS
MORSE & SON CHAPEL
S917 MAIN STREET
NIAGARA FALLS, ONTARIO
MORGAN FUNERAL HOMES
MORSE & SON LIMITED
NIAGARA-ON-THE-LAKE CHAPEL
413 REGENT STREET
NIAOARA-ON-TI~E-LAKE, ONTARIO
1-905-468-3255 LOS I JO
1-905-356-9916 FACSIMILE
SEFFREY L. MORGAN, DIRECTOR
November 28, 2001
Ms. Barbara Muir
City of Niagara Falls
Queen Street,
NIAGARA FALLS, Ontario
Barb:
Thank you for your help on the telephone last week. I would respectfully request that I
be included on the agenda for the Council meeting on December 3, 2001. I would like to
make a presentation to the Fire Chief, on behalf of the Morgan Family and Funeral Home
Staff, related to the events of September 11,2001.
Thanks again for your help. Please advise ifI can attend.
Sincerely,
Niagara Fall, ll~l~_
Community Services Department
Parks, Recreation & Culture
7565 Lundy's Lane
Niagara Falls, ON L2H 1Gg
web site: www,city,niagarafalls.on,ca
Tel: (905) 356-7521
Fax: (905) 356-7404
E-maih akon@city.niagarafalls,on.ca
December 3, 2001
Adele Kon
Director
R-200'1-53
His Worship Mayor Wayne Thomson
and Members of Municipal Council
City. of Niagara Falls, Ontario
Members:
Re: R-2001-53
Skate Park Request from the Mayor's Youth Advisory Committee
RECOMMENDATION:
It is recommended that Council support the development of a Skate Park in Niagara Falls and the
allocation of $250,000 in the 2002 budget. Furthermore, that Council support thc investigation of
City owned property for the location of the Skate Park.
BACKGROUND:
The Mayor's Youth Advisory Committee held a Youth Forum on March 29, 2001 to gain an
increased understanding of the recreation and leisure needs of youth in Niagara Falls, and to use this
information to improve service to the youth population. One of the areas of interest was the
development of a Skate Park.
The Mayor's Youth Advisory Committee made a presentation to City Council on April 30, 2001
and indicated an interest to create a Skate Park for the youth in Niagara Falls. A Public Meeting was
held on Thursday, October 25, 2001 at the Niagara Falls Public Library and over 100 people
attended, consisting mostly of youth. Four sites, owned by the City have been assessed by the Parks,
Recreation & Culture Department. The four sites were:
Community Centre - McLeod Road and Montrose Road
John N. Allan Park - Kalar Road, North of McLeod Road
Mewbum Road - Mewbum Road, North of Mountain Road
Kef Park - Swayze Drive, West of Stanley Avenue
Working Together to Serve Our CommunRy
Municipal Wod(a Fire Services Pad(s, Recreation & Culture Business Development
-2-
These sites were presented at the Public Meeting. The preferred location for the Skate Park was at
the new Community Centre, at McLeod Road and Montrose Road.
A 15,000 square foot permanent concrete Skate Park would cost the City approximately $250,000.
The Mayor's Youth Advisory Committee has the support of The Optimist Club of Niagara Falls, The
Boys and Girls Club of Niagara, Niagara Regional Police Services and a number of youth in the
conununity. We are prepared to work together, with the City, to create a safe, inviting, and fun place
for skaters to call their own.
With a commitment of funding assistance from Council and the investigation of a site for the Skate
Park, the Mayor's Youth Advisog~ Committee can begin a plan to fundraise and consult with Parks,
Recreation & Culture Staff to ensure the development of a facility that best meets the interests of the
Skateboard, BMX, In-Line and Scooter Community.
Respectfully Submitted:
LL/das
Victoria Bamabi, Chair
Mayor's Youth Advisory Committee
V52001COUNCIL~2001 12 03\R-2001-53.wpd
November 19, 2001
City of Niagara Falls
P.O. Box 1023
4310 Queen Street
Niagara Falls, Ont.
L2E 6X5
The Optimist Club
OF NIAGARA FALLS
P.O, BOX 124
NIAGARA FALLS, ONTARIO
L2E 6S8
NOVlg zOO1
PARKS, RECREATION
& CuLTURE
Attention: Lori Lightfoot, Mayor's Youth Advisory Committee
Re: Support of Skateboard Park
Dear Ms. Lightfoot:
My name is Michael Carey and I am the third Vice President of the Optimist Club of
Niagara Falls. I am in charge of all youth programs and activities in the City of Niagara
Falls on behalf of the Optimist Club.
I was made aware that there is a proposal to create a Skateboard Park for the youth of our
city and on behalf of the Optimist Club of Niagara Falls, we wish to pledge our support in
this initiative. We believe there is an identified need for the park, which we feel, will
provide our Youth with further recreational activities.
Cun-ently, the Optimist Club provides support to our Youth by sponsoring Air Cadets,
Scouting, Minor Girls Softball, Minor Football, Minor Hockey, Red Raiders Basketball,
The Boys & Girls Club and a number of other programs.
The topic of a Skateboard Park is frequently raised by the youth that I am associated
with.
After consultation with our Board of Directors, the Optimist Club of Niagara Falls fully
supports the Mayor's Youth Advisory Committee in their endeavour and look forward in
taking an active part in this process.
Yours in Optimism,
Michael Carey
Chairman
Youth Activities & Programs
f Niag
Boys and Girls Club o ara
6681 Culp Street, Niagara Falls · Ontario · L2G 2C5 · Phone 905-357.2444 · Fax 905-357.7401
Lori Lightfoot
Parks, Recreation and Culture
7565 Lundy's Lane
Niagara Falls, ON L2H 1G9
November 19, 2001
Dear Ms. Ughtfoot:
The Boys and Girls Club of Niagara has no hesitation in supperting the building
of a Skateboard Park for the children and youth of Niagara.
Club staff and volunteers ~ the need for such a facility, as early as 1996.
The need was most recently confirmed by findings documented at the Mayor's
Youth Forum, March 29; 2001.
The Club commends both the Mayor's Youth Council and the Community
Services Department for their efforts to move this project forward and is prepared
to commit staff and conduct fundmising to assist in bringing this project to
successfol completion.
Sincerely,
Executive Director
Cc John Russell, President
Celebrating the Potential of Al! Children and Youth
Charitable Donation #106804628RR0001
The Niagara Gatekeepers Program
November 14, 2001
Mayor Wayne Thomson and Members of City Council
Corporate City of Niagara Falls
4310 Queen Street, Box 1023
Niagara Falls, ON L2E 6X5
Re: Request to Present the Niagara Gatekeeper Program to the Council
Dear Mayor Wayne:
Thank you for the privilege of speaking to you today regarding the introduction of the
Niagara Gatekeepers program to the Niagara Falls community.
I request an opportunity to present our program to your ~ onMom:layNevember 26
,orMonday December 3, 2001. Our program is expancling intothe Niagara Falls
community and we would be honoured to receive .the endorsement from you and the
Councilors. Our presentation will be about 10-'ISles: This includes a six-m~ute
tape that gives a clear overview of our goals.
The Niagara Gatekeepers is a community based program designed to identify seniors at
dsk. We train frontline people to recognize signs of distress or difficulty that may
indicate that a sen iorperson needs help. Once apotential problem has been identified
through our refen'al hofline number, the appropdatepar/mering agent7 will receive the
request for follow up.
We look forward to receiving your confirmation. ~ councilors will be provided with a
package prior to the meeting, I can be reached Monday to Friday, 8;30 -4:30 at
1-877~212.3922 ext 237. Thank you for your consideration of this request.
Renate Martin
Program Coordinator
The Niagara Gatekeepers Program
The Regional Municipality of Niagara Region Phone: 905-735-3339 ext 237
Seniors Community Programs Toil Free: 1-877-212-3922 ext 237
163 First Avenue Fax: 905-735-9425
Weltand, ONL3B 1Y4
Emait:rmarth~regionaL niagara~n.ca
... Watching out for seniors in need...
PLANNING MEETING. DEC 0 3 ;{001
Niagara Falls lie
Corporate Services Department
Planning & Development
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
web site: www.city.niagarafalls.on.ca
Tel: (905) 356-7521
Fax (905) 356-2354
E-mail: planning@city.niagarafalls.on.ca
Doug Darbyson
Director
PD-2001-104
December 3, 2001
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls, Ontario
Members:
Re:
PD-2001-104, Zoning By-law Amendment Application (Revised)
AM-II/2001, 6365 Drummond Road
Applicant: Ralph Terrio
Agent: Dennis Savriga
Proposed Residential Redevelopment
RECOMMENDATIONS:
It is recommended that:
1)
Council approve the Zoning By-law Amendment application for 6365 Drummond Road
to permit the conversion of the existing building to an apartment dwelling containing
not more than 25 units on a portion of the land and the development of 11 on-street
townhouse units on the balance of the site or on-street townhouse on the entire
property;
2)
the amending by-law include a higher parking standard of 1.6 spaces/unit for the
apartment conversion in order to assist in alleviating on-street parking;
3)
Council require the owner to enter into a servicing agreement for off-site works on Ash
Street and Murray Street prior to the issuance of any building permits;
4)
the installation of "No Parking" signs across Murray Street frontage of the subject
property be considered by the Parking and Traffic Committee; and
5)
Council pass the amending by-law, included on tonight's agenda, to implement the
application.
Working Together to Serve Our Community
Clerk's Finance Human Resources Information Systems Legal Planning & Development
December 3, 2001 - 2 - PD-2001-104
THEPROPOSAL:
Ralph Terrio has requested an amendment to the Zoning By-law to permit a residential
redevelopment of 6365 Drummond Road, as shown on Schedule 1. Schedule 2 illustrates the
proposal which involves the conversion of the existing, 2-storeybuilding into an apartment dwelling
containing 25 one and two-bedroom units and the development of 11 on-street townhouses. The 11
on-street townhouses will be constructed in 3 blocks: 2 blocks of 4 units each fronting onto Ash
Street and 1, 3-unit block fronting onto Murray Street. The applicant is requesting the land to be
rezoned from the current site specific R3 zoning to a site specific R5 zone for the proposed
apartment conversion and a site specific R3 for the on-street town_houses. He is also requesting that
the amending by-law provide for an option to develop on-street townhouses on the entire property
(thereby resulting in the demolition of the existing building) should the conversion prove unfeasible.
The current proposal has been scaled down from what had been previously proposed. Previously
the developer had proposed a significantly more intense redevelopment that consisted of the
conversion of the existing building into an apartment with 30 units, 10 on-street townhouses fronting
onto Ash Street and a semi-detached dwelling fronting onto Murray Street. Staff did not support the
earlier proposal (report PD-2001-70) and the applicant requested deferral in order to conduct a
neighbourhood meeting.
The applicant has advised staff that a neighbourhood meeting was held with area residents on
September 4, 2001 at which time he presented the proposal with fewer units, more landscaping and
a better parking configuration. On-street parking along the north side of Murray Street was cited as
a continuing problem. The developer and residents agreed that construction of a curb along the
Murray Street frontage of the property together with the installation of "No Parking" signs would
prevent on-street parking.
CIRCULATION COMMENTS:
Inforn). ation regarding the revised application was circulated to City departments, several government
agencies and the public for comments. The following is a summary of the comments that have been
received.
Municipal Works
Building & By-law Services
See attached memorandum
Building permits shall be obtained prior to
construction.
An architect and professional engineer shall
be retained for the design and review of the
proposed apartment dwelling.
Spatial separation shall be confirmed for the
townhouse blocks and be designed in
accordance with 9.10.14 of the Ontario
Building Code.
December 3, 2001 - 3 - PD-2001-104
Parks, Recreation & Culture
The five City trees abutting the property on
Murray Street and Drummond Road shall be
protected.
5% cash-in-lieu of parkland dedication is
required.
PLANNING REVIEW:
The following is a summary of staff's analysis of the application:
1. The proposal complies with residential policies of the Official Plan.
The land is designated Residential in the Official Plan. The Plan encourages a harmonius
mix of housing types with developments of higher densities located at the periphery of
residential neighbourhoods. Developments with densities of up to 30 units/acre should have
convenient access to arterial streets and public transit in order to minimize traffic impacts on
the local streets and should, in general, be close minor commercial districts, parks, schools
and institutional uses.
The proposed apartment conversion has a density of 30 units/acre. The townhouse
development has a density of 17 units/acre. Drummond Road is an arterial road, therefore,
this development will have little, if any, traffic impact on the residential streets to the west.
The location is also relatively close to Lundy's Lane and the Minor Commercial area of
Dunn Street and Drmnmond Road. As such, the development complies with the density
requirements of the plan.
The Residential policies also require that residential infilling be designed to achieve
compatability and sensitivity with the surrounding area. Design parameters include density,
height gradation, building mass and arrangement, setbacks, appearance, landscaping and
open space.
The revised proposal appears to satisfy these criteria. Density is in compliance with the Plan.
Building heights are no greater than 2 storeys. The on-street townhouses are to have floor
areas of 1,100 square feet to 1,350 square feet, are arranged in blocks of not more than 4
units and set back 15 feet from the street with the garages set back 20 feet. The design is
compatible with the existing residential area which is comprised of 1 and 2-storey single
detached dwellings, on lots that are generally 40 feet wide, and sited close to the street.
The option to construct on-street townhouses over the entire property would further reduce
the density of the development to approximately 18 units/acre. The density policies state that
townhousing can be developed up to 20 units/acre. Such a density is more close to the
density of the surrounding residential area and should, therefore, result in a more compatible
development overall.
December 3, 2001 - 4 - PD-2001-104
The dilapidated building will be significantly different after the proposed conversion, with
the inclusion of windows and purported new exterior cladding. The existing building is sited
on the Murray Street and Drummond Road property lines. The addition of streetscaping
along Murray Street in the form of a proper curbed and sodded boulevard with street trees
and foundation planting against the building will assist in the integration of the existing .
building. Accordingly, it is recommended that the streetscaping along Murray Street be
included as a condition of a servicing and development agreement.
The redesign also provides for amenity space for the apartment. Sufficient landscaping is
provided to screen and buffer the parking area.
The proposal complies with the policies of the Official Plan respecting residential
conversions.
The Official Plan contains policies regarding the conversion of non-residential structures to
a residential use. The earlier design did not satisfy these policies, specifically the
accommodation of parking, greenspace and amenities and the compatibility with surrounding
land uses and the capability of the existing building to support the proposed use.
The redesign satisfies the concerns respecting lot size and compatibility. The reduction in
the number oftownhouses along Ash Street has increased the amount of land available for
the apartment conversion. As such, the parking area is now located in the northeastern part
of the site. A reduction in the number of apartment units to 25 has lessened the parking
demand, which has resulted in a smaller parking lot, freeing up land for landscaping and
amenity space. With the decrease in density of the site, and the resultant improvements in
site design and greenspace, the development has now achieved compatibility with the
neighbourhood.
hi order to ascertain whether the existing building can support the use, the applicant will
have to engage an architect and structural engineer. As noted in the comments above,
Building & By-law Services will require this as part of the building permit.
3. The requested amendment is appropriate for the proposal.
The site is currently zoned Residential Mixed zone (R3-529) which permits up to 26 on-
street town,houses in 4 blocks. The revised amendment requests that two, distinct site
specific zonings be applied to the site. A site specific R5B zone is proposed for the
apartment conversion that will permit the existing building to be utilized for 25 units. A
landscaping requirement of 30%, which includes landscaping of the parking lot perimeter
along Drummond Road and against the townhouses on Ash Street, has also been applied.
A site specific R3 zone is proposed for the on-street townhouses that includes provisions for
the maximum number of units, front, rear and side yard setbacks, lot coverage and parking.
December 3, 2001 - 5 - PD-2001-104
The amending by-law establishes the necessary provisions to ensure that the development
will proceed as proposed. The by-law includes a higher parking standard (1.6 spaces/unit)
for the apartment site. The Zoning By-law requires 1.4 spaces/unit. A higher standard is
recommended because it will help to assist in alleviating on-street parking and represents the
41 parking spaces being provided for 25 units which equates to 1.6 spaces/unit.
In order to develop the site, on-site and off-site improvements will be required.
Development of the proposal will result in a substantial alteration of the site. As such, the
development will be subject to site plan control, with the owner entering into a site plan
agreement. Standard conditions of the agreement will include on-site landscaping, curbing,
walkways, fencing, lighting and site servicing and grading. Separate site plan agreements
will have to be prepared and registered for the apartment and the townhouses as the owners
of the townhouse units should not be responsible for the development and maintenance of
the apartment site and vice versa. Because of this, the applicant will have to sever the
apartment and townhouse parcels prior to the registration of the site plan agreements.
Road widenings will be required along the full frontage of Ash Street and Drummond Road
for the apartment/townhouse option. A road widening along Murray Street will also be
required if townhouses are developed on the entire property. The applicant has only
illustrated road widenings for the apartment lands along Drummond Road and Ash Street.
The developer will also have to complete off-site works along Ash Street and Murray Street
to improve the streetscaping, servicing and safety of these streets adjacent to the
development. These will include:
construction of a properly sized storm sewer on Ash Street;
a 4-foot widening of the asphalt portion of Ash Street to accommodate vehicular
movement and on-street parking complete with curb, gutter and any catch basin
relocations;
construction of a 5-foot sidewalk along Ash Street;
construction of a proper curb and gutter asphalt cross section along Murray Street;
and
boulevard landscaping with sod and street trees along both Ash Street and Murray
Street.
Because these works are off-site, it is recommended that the owner enter into a separate
servicing agreement with the City prior to the issuance of any building permits.
It is also recommended that the installation of the "No Parking" signs that were requested by
the residents be re[erred to the Parking and Traffic Committee. Such requests are routinely
handled through Municipal Works and considered by the Parking and Traffic Committee.
As such, it is appropriate for this request to be dealt with in the usual manner.
December 3, 2001 - 6 -
CONCLUSION:
The requested amendment can be supported for the following reasons:
PD-2001-104
The proposal complies with the residential policies of the Official Plan.
The proposal satisfies the purpose and intent of the Plan's policies respecting conversions
of non-residential buildings to a residential use.
The requested zoning is appropriate for the proposed development.
On-site improvements will be required through a site plan agreement.
Off-site works will be required through a servicing and development agreement.
The amending by-law is on tonight's agenda at the request of the applicant.
Resp~ct fully submitted~/~
J'6hn Bamsley Edward P. Lustig
Planner 2 Chief Administrative Officer .
Recormnended by:
~'~Doug Darbyson
Director of Planning & Development
iroved by:
Executive Director of Corporate Services
JB:am
Attach.
FILE: S:~PDRX2001kPD2001-104.wpd74
SCHEDULE 1
LOCATION MAP
Subject Land
Murray St.
Amending Zoning By-law No. 79-200
6365 Drummond Road
All of Lots 322 to 330 (Inclusive) &
Part of Block "A"
Registered Plan 40
City of Niagara Falls
AM-11/2001
Applicant' Mr. Ralph Terrio
I:NTS i
Community Services Department
Municipal Works
Inter-Departmental Memorandum
Ken Mech
Manager of Current Planning
June 15, 2001
Niagara Falls
From:
Brad Simpson, C.E.T.
Infrastructure and Drainage Technician
Ext. 4102
Subject:
AM-II/2001, Official Plan & Zoning By-law Amendment Application
6365 Drummond Road, Former Union Centre
Conversion of Former Union Centre to a 30 Unit Apartment Building
10 On-Street Townhouse Dwelling Units
1 Semi-Detached Dwelling
Owner: Ralph Terrio
Agent: Dennis Savriga
Please be advised that the Municipal Works Department has had an opportunity to reviewthe above
referenced application and would have the following comments to offer:
Roadways
The subject lands abut Drummond Road, Murray Street and Ash Street. All of the above right-of-
ways are under City jurisdietinn.
Drummond Road has an existing width of 20.12 meters (66.0') and a desired width of 26.21 meters
(86.0'). The applicant will be required to provide the City with a 3.05 meter (10.0') road widening
along Dnmunond Road completeJwith a daylighting triangle with 7.0 meter legs at the intersection
Drummond Road and Ash Street.
Murray Street has an existing insufficient width of 13.72 meters (45.0') and a desired width of20.12
meters (66. 0'). Due to the fact that the existing building is to remain, a road widening would be
inappropriate at this lime.
Ash Street has an existing width of 13.72 meters (45. 09 and a desired width of 20.12 meters (66. 0').
There has historic, ally been a problem with on street parking due to inadequate asphalt widths to
facilitate two way traffic and a single row of parking in a safe manner. Staff is of the opinion that
requesting a road widening in accordance with the City's Official Plan would not be appropriate at
this point in time. However, to achieve a safe cross section that would consist of two lanes of traffic,
on street parking on one side of Ash Street, curb and gutter, and a sidewalk complete with a minimal
width boulevard for snow storage. The Municipal Works Department would require a minimum
road widening of 1.67 meters (5.5'), which is substantially less than a 3.2 meter dedication which
is the ultimate widening required to conform to the City's Official Plan.
Cont'd Pg.2.. ·
-2-
It should also be noted that the proposed vehicular entrance to Ash Street is located too close to the
Drummond Road intersection to support safe traffic movemem. This will have to be relocated and
can be addressed at the site plan stage.
Underground Municipal Services
The following underground municipal services are available:
Murray Street
- a 150 mm (69 diameter watennaln;
- a 375 mm (15") diameter storm sewer;
- a 675 rmn (27'') diameter sanitary sewer.
Ash Street
- a 200 mm (8") diameter watermain;
- a 225 mm (9") diameter combined sewer.
Drummond Road
- a 200 mm (8'') diameter watermain;
- a 1200 mm (48") diameter storm sewer;
- a 450 nam (18'') diameter and a 250 mm (10'') diameter sanitary sewer.
There is no storm sewer on Ash Street and the residents have been susceptible to basement flooding
during rainfall events. As proposed, this development will undoubtedly increase the mn-offto Ash
Street and aggravate the existing flooding. Therefore, to ensure that no negative impact is felt by
the area residents, the applicant will be required to construct an adequate storm sewer across the
entire frontage along Ash Street. This will involve extending a storm sewer fi:om Murray S,eet on
the east side of Drummond Road.
Due to the number of road cuts required on Ash Street to service the onstreet townhouses, the
developer will be required to mill down the entire sen, ice area of the roads and place a single asphalt
patch on the road. These concerns can be addressed during the site plan process.
Sidewalks
Sidewalks presently exist on Drummond Road, Murray Street and Ash Street, but only west of the
subject lands. If approved, the applicant will be required to provide a connecting link to Drummond
Road by paying for a sidewalk across the entire frontage along Ash Street. This can be addressed
through a site plan agreement.
Site Plan Control
Planning staff has indicated that the applicant will be required to enter into a site plan agreement.
Servicing and grading issues will be address in more detail at this time.
Cont'd Pg 3..
-3-
Development Charges
The applicant will be required to pay the cost of the applicable development charges in place at the
time of building permit issuance. The City's current Development Charges By-law indicates that
no development charges will be taken on any residential lot registered prior to January 1, 1962. The
subject lands include Lots 322 to 330 inclusive on Registered Plan 40. Therefore, the applicant will
receive credit for the 9 residential lots.
Relief of Part Lot Control
It is understood that the applicant will be applying for relief from part Lot Control. At that time, the
Municipal Works Department will be reviewing the need to imposing subdivision type conditions
such as decorative street trees and the adequacy of street lighting.
Conclusion
The Municipal Works Department would have no objections to offer subject to the following
conditions:
1. The City be dedicated a daylighting.triangle with 7.0 meter legs at the intersections of
Drummond Road and Ash Street.
2. The City receive a 1.67 meter road widening along Ash Street.
3. The City receive a 3.0 meter road widening along Drummond Road.
4. The Developer coustmct a proper size storm sewer on Ash Street.
5. The developer should be required to widen the existing asphalt on the south side of Ash
Street by approximately 1.2 meters to achieve minimum vehicular movement widths
with on street parking, and construct full curb and gutter complete with any catch basin
relocations required across the entire frontage;
6. The developer construct a 1.5 meter wide sidewalk along the Ash Street frontage.
All of the above can be addressed through an external servicing agreement at the time of Site
Plan Control.
c. A. Kon
R. Kallio
M. Brown
P. Corfield
S. Felicetti
The City of
Corporate Services Department
Planning & Development
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
web site: www.city.niagarafalls.on.ca
Tel: (905) 356-7521
Fax: (905) 356-2354
E-mail: planning@city.niagarafalls.on.ca
Doug Darbyson
Director
PD-2001-106
December 3, 2001
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls, Ontario
Members:
Re:
PD-2001-106, Zoning By-law Amendment Application
AM-31/2001, 3109 Ussher Street
Applicant: Mr. & Mrs. Willick
Agent: Michael Allen
Proposed Accessory Apartment
RECOMMENDATION:
It is recommended that Council deny the application to amend the Zoning By-law to permit
an accessory apartment.
THE PROPOSAL:
Mr. and Mrs. Willick, of 3109 Ussher Street, have requested an amendment to the Zoning By-law
to permit an accessory apartment (in-law apartment) within a proposed one-storey addition to their
existing single-detached dwelling (see Schedule 1). Schedule 2 illustrates the details of the site.
The land is currently zoned Residential Single Family (R1C). Site specific zoning provisions are
requested to be added to the R1C zoning of the land to permit the accessory apartment (second
dwelling unit) and to provide a 6.2 foot side yard where an 8-foot side yard is required.
CIRCULATION COMMENTS:
Information regarding the application was circulated to City departments, several government
agencies and the public 5~r comments. City departments and agencies are not opposed to the
application.
Staff has received numerous telephone calls from area residents objecting to the application. A
petition against the proposal from the residents has also been received and is included in Council's
agenda.
}Vorking Together to Serve Our Community
Clerk's Finance Human Resources Information Systems Legal Planning & Development
December 3,2001 - 2 - PD-200 i- 106
PLANNING REVIEW:
The following is a summary of staff's analysis of the application.
1. The proposal is not within the intent and purpose of the Official Plan.
The property is designated Residential in the Official Plan. The Plan states that residential
development should occur in a manner that is compatible with the surrounding
neighbourhood. The accessory apartment policies, which would have permitted accessory
apartments as-of-right, were deferred from approval by the Province. The policies reflect
Council's intent at the time, but have no status.
The policies contain criteria which this application can be analyzed.
· The accessory apartment is not subordinate in size to the principal use.
The proposed apartment is to be comprised of a 576 sq. fi. addition to the rear of the
dwelling plus the conversion of the 264 sq. ft. garage into living space for a total area
of 840 sq. ft. This is approximately 70% of the area of the existing dwelling which is
1,213 sq. ft. in area. Although the apartment is of lesser size than the dwelling, at 70%
of the original floor area, the apartment is not subordinate to the dwelling.
The lot size and configuration are not sufficient to accommodate adequate parking,
green space and amenity areas.
As shown on Schedule 2, the property is an irregular, pie-shape with a lot depth of about
140 feet. The existing house is set back approximately 44 feet at the garage and has side
yard setbacks of 4.67 feet and 6.17 feet. Parking for the existing dwelling is provided
within a single car garage and on the driveway. The applicant proposes conversion of
the garage which will eliminate a parking space. The Zoning By-law requires that there
be one 8-foot side yard setback when a dwelling does not include an attached garage.
This setback is to allow the opportunity for the driveway to be extended beside the
house into the rear yard. Without adequate space to reach the rear yard, it removes
another option for parking.
The conversion will force all the parking to be located in fi'ont of the house. The
required parking spaces will have to be provided in tandem (one behind the other). Such
a situation is not desirable as the driveway will probably be widened to accommodate
at least one more vehicle with free manoeuverability. Therefore, reducing the front yard
area is not in keeping with the characteristics of the neighbourhood.
The proposed building addition does not satisfy the single-detached zoning
requirements.
As noted above, the proposal requires relief from the Zoning By-law requirement of an
8-foot side yard setback. As such, the proposal, as designed, does not satisfy the
requirements of the Zoning By-law.
December 3, 2001 - 3 - PD-2001-106
· Any proposed building addition shall not detract from or alter the building form
and/or character of the area.
The lot size and configuration and the building location dictates that the intensification
of the use will change the character of the lot by decreasing the required setbacks,
reducing front yard landscaping, and extending the parking in the front yard. Therefore,
the proposal is out of character with the surrounding area. Accordingly, the proposal
does not satisfy the City's (deferred) policies for accessory apartments.
2. The long-term ramifications of the proposal are a concern.
The application requests the permission to establish a second dwelling unit in the building.
While the purpose is to house one of the applicant's parents, the Planning Act prohibits
municipalities from regulating occupancy based on relationships. Therefore, the apartment
could be occupied by anyone. Thus, the property should be capable of supporting two
dwelling units without regard to family occupancy.
CONCLUSION:
The requested amendment cannot be supported for the following reasons:
· The proposal is not within the purpose and intent of the Official Plan.
· The accessory apartment is not subordinate in size to the existing dwelling.
· The lot cannot properly accommodate parking.
Permitting two dwelling units on the lot may result in long-term concerns respecting
compatibility.
and
Deputy Director of Planning & Development
Respectfully submitted:/
Recommended by:
)ug Darbyson
Director of Planning & Development
Tony Ravenda
Executive Director of Corporate Sen)ices
JB/AH:am
At~ach.
S:~PDR~2001 ~PD2001 - 106.wpd
SCHEDULE 1
LOCATION MAP
Subject Land
Amending Zoning By-law No. 79.200
Location: 3109 Ussher Street
Applicant:
Mr. & Mrs. Willick
AM-31/2001
443 Eastchestet Road
St. Catharines, ON
L2M 6S2
tel (905) 984-5545
fax (905) 984-5542
e-mail: mda0en~npiec.on.ca
michael d. allen architect inc.
architect · urban planner ° interior design · project management
,SIT[
~,c. ALIF- L" - 2z:~.o"
November 13, 2001
Mr. Doug Darbyson
Director of Planning & Development
City Hall .
4310 Queen Street
Niagara Falls, Ontario
L2E 6X5
re: City File AM-31/2001
Dear Mr. Darbyson
We have just been made aware of the proposed amendment to Zoning By-law No. 79-200 which
would allow an accessoD' apartment at 3109 Ussher Street.
There is no safeguard to prevent this 'apartment' from becoming a rental unit in the fature. As
innocent as this application may be the implications for surrounding residents has to be
considered. If this application is approved, others will follow. The character of the neighbourhood
will change.
We have lived on Ussher Street for 32 years and we are strongly opposed to any re-zoning. This
area must remain Residential Single Family.
Garry and Connie Anderson
3085 Ussher Street
RECEIVED
NOV 1 5 2001
Planning
PAUL ff, NrINTEMUTE. Hen, B.A., LL.B.
Barrister, ~olt¢flor, Nota~ Public
Bus: (905) 68%7044
F x: (90s) 6s7.70ss
20 Lake Street,
P, O, Box 638,
St. Ca~fines, Ontario.
L2R 6wg
November 27~, 2001,
DELIVER,ED BY FAX
(905-356-2354 - 2 Pages)
Director of Planning & Development,
City Hall,
4310 Queen Street,
Niagar~ Falls, Ontario.
L2B 6X5
Dear Sir/Madam:
Re: Ci.ty File AM-31/2Q0~
Please be advised that I am writing to you on behelfofmy clients, Mr. Albert Wintemute and
Mrs. Margaret Wintemute who reside at 3096 Chipman Crescent, Niagara Falls, Ontario. As
should be obvious, I am on a tack permanent retainer with these clients.
They have asked me to review the zoning By-law amendment application and I have the following
comments to make on their behalf Clearly, this neighborhood is currently zoned Residential
Single Family (R1C). The applicants in this case are seeking a spot zoning for their Ussher Street
property.
At the time of the passage of the official plan for the City of Niagara Falls and the subsequent By-
laws therein, there was s~onificant attempt to adequately plan for the locating of single family
dwellings in this region of Chippawa. The broad planning ideas that made this a good idea at the
time continue to thh day.
Even the briefest of cauvasses of area residents, indicates a desire to maintain propet~ values and
it can be successfidly argued that this particular By-law amendment application, which is calling
for a spot zoning change, would represent the introduction of multiple family dwellings and would
thereby depress property values in this particular area.
The first grant of this kind of spot zoning would inevitably open the floodgates for other
applications. Failure on the part of City Counsel to take a strong position against this particular
request would diminish the impact of the By-law and render the planning process absurd.
RECEIVED
l,!nv 2 0 2001
I can imagine that other residents have pointed out to you the negative impact of multiple family
situstion~, parldng issues, traffic issues, and the issues attended with renters as opposed to
owners. All in all the decision in favour of this application would certainly.here a far l~atcr
~egative impac~ on a brier number of persons than would its rdhsal.
Having stated that, it.is lr~umbent on City Council to be co~izant of the planning rules and to
avoid some of the more difficult issues that have begun to impact upon Councils in Canada;
precedent established in the United States wherein the responsibility for these references in the
valuation ofproperties can in essence be attributed to the decisions made by Council and result in
some litigation thereai~ter,
And what of the applicants? Obviously they are tl!dng to take steps to have their home expanded
and perhaps for the purpose ofheving other family members reside therein. Clearly, the Building
Department at the City of Nia~oara Falls should be contacted to demonstrate that it is possible for
a dwdling house of that nature to be expanded to an extent that additions are added to homes on
a regular basis in the City oflqtagara Falls, that do not require changes to the zoning By-laws.
Ideally, the applicants should be considering the expansion of their home to accommodate family
members and bein__& family members it would be uanecessaty for there to be separate eisa-maces
involved and it would be u~ for there to be requests to build an enormous structure that
would require the accessory apartment to encroach onto the side yards as is pointed out in the
details in the Schedule to the Public Meeting Notice. Sleps should be taken by the Council to
advise the applicants of the other options they have that would not result in the disturbance of the
zoning By-law and in essence the 8real work accomplished by this Council and previous Councils
to create a zoning atmosphere in the City ofl'4ia&ara Faits that is adequate for all of its citizens.
Indeed the Council should draw on its vast exp~enc~ with these matters and their ability to rule
concerning the larser issue~ at hand wb. lch of course is a significant element of the function of any
municipal governing body.
In conclusion, it is the position of my clients that they are against the amendment application
because of the change in the zoning and they impress upon Council the importance of maintaining
the current residential single family zoning in the area.
PAUL I, WIN'r~MU'I~.
PIW/mlb
The Director of Planning and iDevelopment
Niagara Falls City Hall
Nov 1 g, 2001
Flanning
Mr. Darbyson
Reference: City File AM-31/2001
Having been a resident of 3095 Ussher Street for almost 30 years now and having specifically purchased a proper
that was zoned "Residential Single Family" I feel it is extremely unfair the city is even considering a rezoning
application. What purpose is there in having different zoning categories if this is all that's needed to change a
Bylaw that could affect all the residents in the immediate area.
My wife and I spent considerable time and effort in choosing an area in which to purchase a house and raise
our children. We chose Ussher Street because of the proximity to "Riverview Park" and the Niagara Parkway
(we walked and biked aloug the fiver long before the NPC developed the recreational trail,) and even back then
we made sure that the considerable financial investment that we finally committed to was (R1C).
Over the years we have continued to improve and maintain out property and I feel strongly that the proposed
change would be detrimental to the area, and sera president for furore changes in the zoning.
The mailing I received claims the changes are "Site Specific", that would suggest the proposed changes affect
the specified property only.
I would argue that when you start altering the zoning in an area you affect the entire area.
Looking for clarification on some questions I had after reading the notice your office mailed out I called
(905) 356-7521 ext. 4247 on two occasions (Nov 9 and 12) and left my name and number but as of yet have not
received a return call.
If Council approves this diluting of the (RIC) zoning for this sweet will the residents see a reduction in their tax
levy?
I remain
Jim Albon
3095 Ussher Street
Niagara Falls, On
L2G 6M3
Shirley Fisher
Art Federow
RECEIVED
N 0V 2 6 2081
PIANNIN
__ & DEVELOPMENT
November 16, 2001
Planning I
The Director of Planning and Development
City Hall
4310 Queen St
Niagara Falls, On
L2E 6X5
RE: City file AM-31/2001
(Arnendment zoning by-law for 3109 Ussher Cr. Niagara Falls, On
Dear Sir/Madam
We object to this rezoning application based on the following:
1. Parking at residence is currently limited with cars parked on city street. An additional second
dwelling unit would only create a safety concern with additional vehicles parking on city street
and obstructing visibility.
2. We chose this neighborhood based on the fact it is zoned residential single family with owner
occupied homes and no rentals. This rezoning would have a negative impact on our quiet area
and a decrease in property value if multiple residence are allowed. If this rezoning is approved
there is no guarantee other property owners will not follow suit.
3. ()ur sewer system is inadequate in this area and multiple family dwellings would only add to
the problem. There has been no resolution to our sewer inadequacy in the 17 years we have
resided here.
Thank you for the opportunity to voice our concerns
Linda Wall Larry Wall 3098 Chipman Cr., Niagara Falls, On
RECEIVED
NOV 2 0 2001
, VELOPMEN/
3100 Chipman Crescent
Niagara Falls ON L2G 6M5
November 16, 2001
To the Director of Planning & Development:
This letter is in regards to City File: AM-31/2001, the proposed
Zoning By-Law Amendment to 3109 Ussher Street in Chippawa.
As the owners of 3100 Chipman, we are opposed to this proposed re-
zoning. We purchased this home largely because of what a nice
neighborhood this area currently is. Many people feel this to be a
desirable area and the values of the properties are good. We are
concerned that this re-zoning could lead to other re-zonings with an
adverse effect on property values and our investment in our home. I
believe our view is similar to the majority of other homeowners on
both Chipman and Ussher. Once houses become rental properties,
we are at the mercy of the landlords to maintain them, if they choose
not to, the area deteriorates and property values drop. This could
happen with 3109 Ussher if the current occupants decide to sell the
house.
We are proud to live in this nice quiet, single family residential area
and fear that this proposed change threatens the future of this area.
Ask yourself if you lived in a house on this street, would you want to
open up the possibility of decreasing the appeal and value of your
home?
Sincerely, Ivanka, Karmelo and Daniel Ivankovac
RECEIVED
NOV 1 9 2001
PLANNING
& DEVELOPMENT
R E C E I V E D PETITION AGAINST RE-ZONING F,,.=
NOV2 12001 / ZONING BY"LAW AMENDMENT CITY FILE: AM ' 31/2001
w= l .= ~DE~NED ~RE ~E NOT IN FAVOR OF ~E PROPOSED ~ENDMENT NOTED ABOVE,
PETITION AGAINST RE-ZONING
ZONING By,LAW AMENDMENT CITY FILE: AM - $112001
PURSUANT TO THE PROV~ION$ OF THE pLANNING ACT TO AMEND THE ZONING
By-LAW No, 7m-200, CURRENTLy ZONED RESIDEN~AL 8INGLE FAMILY (RIC) TO PERMIT
ACCESSORY APAR'IMENT (SECOND ~WELLINQ UNIT). LOCATED AT 3t 09 USSHER ST.
WE THE UNDERglGNED ARE THE NOT IN FAVOR OF ~HE PROPOSED AMENDMENT NOTED ABOVE.
NAME p~esse print AODRES$ PHONE NUMBER SlGNA~I~RE
PETITION AGAINST RE-ZONING
From: "Alan Willick" <awillick@cogeco.ca>
To: <wthomson@city. niagarafalls,on,ca>, <wcam pbel@city.niagarafalls.on.ca>,
<judyorr@city.niagarafalls.on.ca>, <klmc@city.niagarafalls.on.ca>, <jwing@city.niagarafalls.on.ca>,
<g hendershot@city,niagarafalls,on.ca>, <ioannoni@city. niagarafalls.on.ca>,
<nputtick@city. niagarafalls.on.ca>, <selina@city.niagarafalls.on.ca>, <kenferen@city.niagarafalls.on.ca>,
<vpietran~city. nJagarafalls.on.ca>, <afederow~city.niagarafalls.on.ca>, <sfisher@city,niagarafalls,on.ca>
Date: Thu, Nov 29, 2001 7:34 PM
Subject: Re-Zoning Agenda Item for Dec. 3 Meeting
This is written to provide some important information regarding an application for re-zoning (City File
AM-31/2001) which is on the agenda for the December 3, 2001 meeting at 6:00pm. I trust that the
attached documents will assist you in making an informed and thoughtful decision in this matter.
Kindly acknowledge receipt of this email and do not hesitate to call me should you have any questions or
comments. I look forward to seeing you on Monday evening.
Regards,
Alan Willick
3109 Ussher Street
Niagara Falls, ON
(905)295-4149
(905)353-8200 daytime business
CC: "Michael Allen" <mdallen@npiec.on.ca>
0~:27 91~56808200 TALK WIRELESS PAGE
Comments on Re-Zoning at 3109 Us~her Street, Niagara Falls
02/28
Thank you taking the time to read and consider the information that follows. I
trust that you will gain a better understanding of our position in regard to our
application tbr re-zoning (City File AM-31/2001) to be considered on December 3,
2001 at 6:00pm.
1. What this IS and what this IS NOT
My in-laws, Bud and Brenda Atkin, are in their seventies. Enjoying reasonably good
health they have been able to stay in their own home until now. Before their health
erodes, they and we desire to create an independent living space for them on our property
that would relieve them of the responsibilities of home ownership, and yet allow them
independence in a residential neighbourhood. We choose to ~mmit ourselves to being
their care~givers when required in the fatuxe because we love them deeply and believe we
are called to hoanar our parents regardless of life circumstance.
Aside from achieving these goals and pm'poses, we have ~m other need or interest in
altering our property.
2. Aa Investment in People NOT Real Estate
Om' motivations need to be made clear. Our great desire is to invest ourselves in the Iives
of our parents for the balance of their days, in the same manner in which they have done
m througltout our lives. There are no expectations on anyone's part that an addition to
our home in Chippewa will bring any financial return. The Lruth oftbe matter is, that it is
the choice of Bud and Brenda Atkin to use some oftbe equity from the em'rant home to
create a new home with us. We are all well aware that ti,Ss will be an urtrecoverable
financial expenditare -- but so is travelling the globe, a~ ninny sm~Jors do. The memories
are what make it worthwhile.
3. We are here to stay
For all but a t~w of my 44 years, Niagara Falls has heen my home. I grew up on Sodom
Road. My wife, Debbie, grew up on Drunur~nd Road, in the home which my in-laws
still own. We have chosen to raise our ~amily in the Chippawa area, beeaase for us, there
is no better place to live. I own a company with an office in Niagara Falls and St.
Catharines m~d employ local people from Niagara. We are very much involved in oar
local church and community. My in-laws, Bud and Breada Atkin, have lived in Niagara
Falls since the mid 1950's. They~ l~ke us, are deeply rooted here and, God willing, will
end our days here.
t~/9072801 89:27 9856e8@200 T&LK WIRELESS P~GB
Comments on Re-Zoning a 3 ' '
t 109 Ussher Street, Niagara Falls
Prepared by Alan Wtlllc~ (905)295.-4149
83/28
4. We understand our neighbours concerns
Some ()four ~e'ghbours have expressed some concern about the rezoning of our property
to permit a mufti-family addition. Their concern is two-fold: families and properties.
Families: There is au underlying [;ear that a "peaceful neighbourhood" may be
chaoged when a Pandora!s box of re~zooing is opm~ed which would allow t'he
sing[e-family status of this neJghbourhood to erode. We have no desire to iqjure
the fabric of our community. Rather, we believe that everyone's parents are an
integral part of the tapestry of [~.milies, and we would encourage others who
would consider making their aghag parents a pan of their family.
Properties: There is a concern six)ut the precedent nature ofallowh~g a site
specific zoning change to be made, and that somehow this will cause a cascade of
future rezoning on other prope~xies. We trust that Niagara Falls City Council
assesses each application on its own merit and would not treat this or may other re-
zoniag as s reason to grant or deny others.
In recegl3kion of some neighbourhood concerns, we would encourage city council to be
creative in conditions or stipulatkms on the re-zx)ning which will allay those tears.
5. We are not alone in the pursuit of our goal
The Government of Canada has empowered multiple councils and committees to address
the rights and privileges of seniors. It is clear from their findings that our society needs
to re-think the place for seniors in our communities mad families~ The challenge rests
with municipalities to support these ideas in their planning and approval processes.
a) The National Advisory Council on Aging (NACA): The Natilmal Advisory
Cmmcil on Aging was created on May I, 1980, to assist and advise d~e Ministe* of Health o~ alt
malters related to the aging of the Canadian population a;~d the quality of life of seniors. Among
many things, NACA believes that:
"Set~ion~ lgcn,e the right to be atttonomott~ while benefiting from interdependence and lo
b) Natinnal Housing Research Cummittee (NHRC): ^ Working Group On SeItiol's
11/38/2881 89:27 905G808288 TALK WIRELESS PAGE
Comments on Re-Zoning at 3109 Ussher Street, Niagara Falls
Prepared by Alan WflI~.~ (005)295-4149
04/20
c) Canada Mortgage and Housing Corporation (CMHC): lt~is i~ tile goverllmcnt
of Canada's national housing agency, helping Canadim~s gail~ access to a wide choice of quali~y,
affordable homes. As such, they PlaY a major role th Canada's housing industry. CMFIC develops
Ilow ways to finance home purehasea. They encourage inoovation in housing d~iga and
technology. One of their initiatives is the "Act Program" where CMHC funds innovators i~*
housillg solutions. A demonstration project on tvc~gen~'atitmal housing made these observanm~s:
~ge#erattonal bom'rog qf/~t;~ a number qf b~ nefits, by po ent ally.
The full report is atlached. Please take a tbw moments to look at the areas I have highlighted.
6. This is about Independence
Independence is defined a.s follows:
We want to be that support system for om' pare~]ts as they lrmve always been for us. Will
you help us?
Thm~ you for taking lhe time to consider our point of view.
On Behalf of the Willick & Atkin thmily,
Alm~Willick
3109 UssherSt.
Niagara FaUs, ON
L2G6M3
(905)295-4149
il/30/2081 09:27 9856888200 TAU< WIRELESS PAGE 85/28
AFFORDABILITY AND CHOICE TODAY (A.C-T)
DEMONSTRATION PROJECT
Two-generational Housing
L'Association provinctale des constructeurs al'habitations du QuEbec
Anjou, Quebec
Prepared for:
Federation of Canadian Municipalities
Canadian Home Builders' Association
Canadian Housing and Renewal Association
Canada Mortgage and Housing Corporation
Prepared by:
Energy Pathways Inc.
Ottawa, Ontario
June1997
11/30/2~01 60:27 9050808290 TALK WIRELESS PAGE 06/20
FOREWORD
The prqject documented in this case study
received funding assistance under the
Affordability and Choice Today (A.CoT)
Program. A.C.T is a joint initiative,
managed by the Federatinn of Canadian
Municipalities. the Canadian Home
guilders' Association, and the Canadian
Housing and Renewal Association,
together with the funding agency Canada
Mortgage and Housing Corporation. The
AoCoT Program is administered by the
Federation of Canadian Municipalities.
AoCoT. which was launched In January
1990. was designed to foster changes to
planning and building regulations and
residential development approval
procedures in order to improve housing
affordability, choice and quality.
Through AoC°T. grants are awarded to
municipalities, private mtd non-profit
builders and developers, planners and
architects to undertake innovative
regulaiory reform initiatives in
municipalities across Canada, Three types
of projects are awarded grants under the
A- C · T Program: Demonstration Projects,
Streamlined Approval Process ProJects,
and Case Studies (of existing initiatives).
to planning and construction
regulations can improve affordabiltty,
choice and quality.
Streandtned Approval P~ocess Prqjects
involve the development of a method
or an approach that reduces the time
and effort needed to obtain approvals
for housing projects.
Case Study grants are awarded for the
documentation of existing regulatory
reform iaitlattves.
Change and Innovation require the
participation of all the players In the
housing sector. AoCoT provides a unique
opportunity for groups at the local level
to work together to identify housing
concerns, reach consensus on potential
solutions, and implement action.
Consequently, a key component of
A · C · T-sponsored projects is the
participation and cooperation of various
players in the housing sector In all phases
of each project, froln development to
realization.
All projects awarded a grant under the
A°C-T Program are documented as case
studies in order to share information on
the initiatives and the beoefits of
regulatory reform with other Canadian
communities. Each case study discusses
the regulatory reform initiative, its goals
and the lessons learned. Where
appropriate, the cost savings resulting
from modificatinns in various planning,
development, and construction
regulations are calculated and reported.
11/30/2~01 ~0:27 9056808200 TALK WIRELESS PAGE 0?/20
TABLE OF CONTENTS
PROJECT OVERVIEW ....................................................................................................................
1.0
PROJECT DESCRIPTION ........................................................................................................... I
1.1 Two generatiomd Housing ........................................................................................... 1
1,2 Project Objectives .......................................................................................................... 1
/.3 Project Methodology ....................................................................................................... I
PLANNING FOR TWO-GENERATIONAL HOUSING ................................................... 3
21 Design C onsidera tio~ls .................................................................................................. 3
2.2 Use and Occupancy Criteria ........................................................................................... 4
?igure I. Two generational House--Front glevatior~ 5
F~gure 2. Two generational House Main Floor P/an 6
Figt~t'e 3. Two generational House---Second Floot P/an 7
F~gm-e 4. Two~gerletatiofml Adaptation- Front Elevation 8
Figure 5. Twogenera~ional Adaptation.- Eloo~ Pla~ 9
g.3 Reg~atow Approaches ................................................................................................ 10
2.4 Financing ................................................................................................................. 10
F~gure ~. FJnanda/Impact: First-Time tqomebuyer. 11
3.0
THE KEY PLAYERS ............................................................................................................... I
3.l £,'Assoc~adon provinciale des constructeurs
d'bai~ital'/ims du QuEbec ............................................................................................... 12
3.2 COtlSttucLloll Oermon lnc ......................................................................................... 12
3.3 Daniel Arbour
4.0 REGUL/~TORY REFORM INITIATIVES AND
iMPACT ON t lOUSING COST, CHOICE AND QUALITY ............................................. 13
11/30/2001 00:2? 9056000200 TALK WIRELESS PAGE 08/20
PROJECT OVERVIEW
tn March 1990, Corrstr'uc/mn Germor~ /tlc,,
of St. Jean Chrysotome, Quebec, submitted
a "two-generational" housing design for
ymmg families and seniors to the Canada
Mortgage and Housing Corporation
(CMHC) competition for excellence In
housing, The firm won an honorable
mention for Its innovative appr~ch ~
meeting the housing needs of the target
market segments.
A two-generational house is a single-
family unit built or renovated to house
two families, of two generations, in ~o
distinct spaces, for a limited period of
time for the older generation.
Two-generational housing was conceived
as a means to a~ist young couples in
buying their own home while providing
retired p~en~ with a comfortable and
secure environment In which to live.
Intended for single-family zones, the
exterior architecture of a two-generational
home conforms to that of a traditional
single-family unit, while the interior ts
designed to protect the independence and
privacy of two separate households.
In 1991, L'Associatmn provinciaJe des
(APCHQ) was awarded an A.C.T grant to
study how current planning regulattuns
and regulato~ proce~es could be
oh and the adaptation of existing
dwellings into, two-generational homes.
A second objective of the A.C.T project
was to develop technical design and
housing.
APCHQ retained the consulting finn of
Daniel Arbour & Associds to carry out the
study with Construction Germon lnc, and
the planning departmeuts of Verdun and
Ste, Foy. The project would address
zoning, site planrdng and building
regulations and encourage Quebec
municipalities to adopt regulations lhat
would allow two-generational housing in
single- family zones.
The completed study provides model
regulations that focus on exterior and
interior design considerations for two-
generational untts. It also dlscusse.s two
approaches available to municipalities
interested in adopting the regulations:
· The traditional approach, based
on standard planning regulations and
by-laws
· The siting and architectural integra-
tion plan approach, which provides
quality-control of housing projects
using specifically developed criteria for
construction, development, arid the
integration of building projects into
areas that are already developed
Various financing solutions were also
proposed, For example, both generations
could share in the initial downpayment,
the retired parents could rent the space
converted by the younger couple, or both
families could be co owners,
In April 1994, APCHQ sent copies of the
study to 40 Quebec municipalities to
encourage them to adopt the proposed
regulations for two-generational housing
At the time of publication, the
municipalities of Buckingham, Gatineau.
Laplalne, Pr~vost and Sorel had adopted
regulations for two-generatinnal housing,
and Cartgnan, Otterburn Park, Lachenate.
St-Hubert and Verdun were soon to adopt
new regulations.
1.0 PROJECT DESCRIPTION
1.1 Two-generational Housing
Young families in the 1990s are finding il:
increasingly difficult to buy their own
hmnes. Tight budgets, hick of job security,
limited buying power, stria mortgaging
requirements, and escalating housing
prk:es have seriously curtailed their
choice in housing. As a result, young
couples may settle for something
unsuited to their needs, hoping that in
the years to come they will be able to buy a
home that will accommodate their
growing families. For many couples, that
may not be possible.
The parents of these young couples, on
the other hand, may have homes that
have become ~oo large for them to
manage. They are retired, living on their
own and growing older. Their house is
thetr main asset and security, but one day
they may have to sell it because it will be
too difficult to maintain hoth physically
and financially.
In March 1990, Construction Germo~ fnc.,
submitted a "two-generational" housing
design for young families and seniors to
the Canada Mortgage and Housing
Corporation (CMHC) competition for
excellence in housing. The firm won an
honorable mention for it.s innovative
approach to meeting the housing needs of
the target market segments.
The two-generational housing concept
was conceived as a temporary solution
that would be advantageous to both
families. Since the concept addressed two
serious housing problems in Quebec, it
received much media attention and
public interest throughout the province.
housing allows the older generation to
familiar lifestyle for a longer period of
home than they could normally afford.
1.Z Project Objectives
In I991, the A,CoT Program awarded a
(APCHQ) to develop model regulations
building could be modified to permit the
construction of, and adaptation of existing
dwellings into, two-generational homes
in single-family zones.
Another objective was to develop
· ensure the privacy and independence
of the two households
house, if desired
municipalities to adopt the proposed
1.3 Project Methodology
APCHQ worked on the project with
& Associ~.s, and the planning
departments of Ste, Foy and Verdun.
11/30/2001 09; 27 9056800200 TALK WIRELESS PAGE 10/28
The project team examined how current
plaRning regulations anti regulatory
processes could be modified to permit
twn-generational homes in single-family
zones by:
identifying specific zoning, site
planning, and building regulations
that would have! to be adapted for two-
generational homes
preparing drafl regulations for review
by municipal representatives and
building contractors
creating a regulatory process and
control mechanism applicable lo all
Qnebec municipalities
finalizing model regulations
The results of the project, discussed in the
next section of this case study, are
presented in a report entitled La i Osiderlce
hi April 1994. APCHQ sent copies of the
report to 40 Quebec municipalities,
encouraging them to adopt the proposed
regulations, As discussed in section 4.0,
the response was largely positive.
Daniel Atbour & Associds, (July 1992). Fhe
report is available in French only. A copy may
be obtained from Francois Berlxier, APCHQ,
5930, boulevard Louls-H. Lafontalne, AnJc~t
(Quebec) HIM lS7. A copy may also be
purchased or obtained orl loan fi:om the
Canadian Houstrlg lnfbl~natlol~ Centre,
700 Montreal Road, Ottawa, Ontario, K1A 0P?,
Tel: (613) 748-2367, Fax: (613) 748-4069,
TrY: (613) 748-2143,
11/30/2E~01 09:27 9056808200 TALK WIRELESS PAGE 11/28
2.0 PLANNING FORTWO-GENERATIONAL HOUSING
A two-generational house is a single-
family unit built or renovated to house
two families, of two generations, in two
distinct spaces, for a limited period of
time for the older generation.
g.l Design Considerations
The two-generational house design must
ensure the privacy aod comfort of the two
couples so that family ties are not strained
by living under the same roof. Safety, too,
is an important consideration.
Design and construction criteria should
ensure that the dwelling looks like a
single-family home on the outside, and
that the interior can be easiIy converted
into a single-family home once two
separate units are no longer required.
Exter/0r Desig~ Considerations
A new two-generational home or a
converted existing unit must confarm
to the planning regulations that apply
to single-family zones. This includes
the architecture and landscape
development, which must integrate
with surrounding single-family
dwellings.
· The building materials, particularly
when converting an existing unit,
must be ora stmilar or superior qualtty
to that of the extsling unit and blend
in well w~lh the existing material.
· A two genaratlonal home should
have only one ctvtc numbar posted.
with a shared main eotrance and a
passage leadtng to two separate living
areas. Acress to the backyard should be
provided I?or both households. While
access should conform to existing
single-family dwelling regulations, the
proposed regulations provide t'or
barrier-free accessibility that people
with physical disabilities might
requlre.
No addi[ional parking space, other
than that provided for single family
units, should be created. The city
parking regulations for single-family
zones should be flexible enough to
permit parking for the second couple.
Fences and other separaltng elements
should not he erected to gtve privacy
to two separate households, since the
extertor space of a two-generational
home should conform to that of a
single-family unit. However, a private
area tn the hackyard could be reserved
for the older couple that is not visible
from the balcony, the porch, or the
steps leading to the entrance allotted to
the other ['amtly. Privacy coukt be
ensured by building a wall that
l'mrmonizes with the ar;chitecture of
the house and that projects no more
than three meters from the wall of the
house.
· There should be no need to enlarge
the garden shed or other accessory
buildings. Again, the same principles
that apply to single-family units
should apply here.
· Ideally, there should be only one
mailbox, one doorbell, one service
entrance l'or water, gas, cable and
telephone installations.
Interior Design Considerations
Since two generational housing targets
seniors, care should be taken to adapt the
interior to the needs of people with
physical disabilities.
The project team developed Iwo sets of
interior design criteria based on those
used by the provincial government for
social housiog projects. The first set
relates to the theme of comfort, privacy,
and security that the converted rooms
should reflect, The second set is
concerned with acressibllity aimed at
meeting the needs of the elderly parents,
who may be handicapped itl a way that
reduces their mobility,
The figures on the following pages
illustrate exterior and interior designs
proposed.
2.2 Use and Occupancy Criteria
In theory, lo a two-generational home,
the space adapted for the parents would be
incorporated into the home of the
ymmger couple once it Is no longer
required. However, the question
naturally arises of whether the space
could be rented to another family
member or outsider.
According to Ardcle 113 of the Quebec
Land Use Planning arid Development
Act, building use and occupancy
regulations are determined by zone
ooly. The law makes it very clear that it
would be illegal to impose regulations
regarding two-generational housing that
would only allow for the shelter of
retired parents.
Furthermore, the Act prescribes that the
rules that could regulate the conversion
and use of the space cannot be applied in
order to control occupancy.
Despite the absence of municipal
authority that would assure the
reconversion of the adapted space once it
is no longer required, there are certain
factors that may discourage those wtshing
to use it as a permanent two-family
home, These disadvantages lie mainly in
the mutual use of certain areas such as
the main entrance, parking, and backyard,
and the sharing of equipment and
services such as electricity and the
telephone, with Individuals to whom the
homeowners are oot related.
Figure 1. Two-generational House--Front Elevation
MAIN ELEVATION
(L~W ¢IggT ~LIT L~L)
Figure Z. Two-generational House--Main Floor Plan
Figure 3. Two-generatioual House.--Second Irloor Plan
2"~ FLOOF-.
11/30/2001 89:27 90560082~0 TALK WIRELESS PAGE 16/20
Figure 4. Two-generational Adaptation--Front Elevation
ELEVATION
11/30/20~1 09:27 905B800200 TALK WIRELESS PAGE 17/20
Figure 5. Two-generational Adaptation--Floor Plan
11/30/2001 00~07 905G008200 TALK WIRELESS PA~E '18/20
2.3 Regulatory Approaches
The project team identified two
approaches to regulating two-generational
housing,
The Traditional Approach
The traditional approach is based on
following specific standard planning
regulations and by-laws that are
somewhat lacking in flexibility. Using the
traditional approach to regulation would
require authorizing the butldirig of two-
generational homes in all zones that
permit single-family dwellings.
In regulatory terms, this would mean
allowing a secondary or mixed use in a
single-family home as In the case of
basement bachelor apartments or daycare
services. Municipalities wishing to
permit two-generational housing using
the traditional approach would need to
re-define permfiled uses to include two-
generational housing.
The Siting and Archtt:eelurai h~tegratioo
Plan Approach
The second option is based on the siting
and architectural integration plan
approach that is provided for under the
Quebec Loi sur ['am~na~ement et
l'urbanisme (the provincial planning act).
Compared to a traditional regulatory
approach, this method provides quality-
control of housing projects using
specialtzx~d criteria.
Although projects must meet standard
~egulations. municipalities can allow for
more flexibility, if qualitative objectives
can be met through the siting and
architectural integration plan approach,
Building permits for Individual projects
are issued only when the planning
committee of a municipality has made its
recommendations to council, which in
turn gives final approval,
2.4 Financing
A number of options are available for
financing a two-generational home:
Both generations could share in the
initial downpayment.
· Rent could be paid by the parents in
exchange for the use of the space
converted by the younger couple,
· Both couples could be joint owners,
Another A·CoT project, carried out by
Dovertel Construction Ltd.,z found that a
This A,C .T prqject is doculllented in the case
study entitled ~The Conv~.'rtible House:
A Flexible Alternative~ available [Sxnr~ the
Cm~adlan Housing hfformatlon Centre
(footnote t contains the Cenlre's adcbe~s)
11/30/200i 09:27 90SB008200 TALK WIRELESS RAGE 19/20
cost more Io build and, therefore, sell
at a higher price than a comparable
amount of rent, amount of downpayrnent
and interest rates--- rental income paid by
the parents could lower considerably the
qualifying Income required of flrst4ime
homebuyers. As figure 6 shows,
the increase in affordablltty can make
two-generational housing a very
attractive option.
Figure 6. The Financial Impact of Conversion: First-Time Homebuyer
I-louse Price' $115,000
Mortgage Principal $86,250
Monthly Carrying Cost:
Mortgage Payment** $900
Mainlenam e/Utilities 1~
$1,150
$46,000
$285
$835
$315
$33,4(10
TALK WIRELESS PAGE 20/28
3.0 THE KEYPLAYERS
3.1 L'Association provtnciale des
constructeurs al'habitations
du Quebec
For~ned in 196l, APCI-[Q is a nomproftt
association of more than 10,000
companies active in the housing industry.
APCHQ members are responsible for
more than 80 percent of residential
construction projects under taken in
Quebec The Association is credited with
the creation of numerous programs
aimed at protecthlg the consumer, one
being the Garantle des maisons neuves
that, since 1976, has provided a warranty
for more thae Z00,000 new homes in
Quebec. Also, in 1985, the Association
established the first warranty program in
Canada for residential renovation.
APCHQ is actively involved tn training,
technology transtar and research,
3.2 Construction Germon Inc.
COIIStFUCEiOn Germen inc. is a building
firm located in St. Jean Chrysotome,
Quebec. The cmnpany created the award-
winning [wo generational housing
concept, and participated in developing
design criteria with other members of the
project team.
3.3 Daniel Arbour & Associ~s
Based in Montreal, Daniel Arbour &
Associds is the largest consulting firm in
urban planning iix Canada. Consultants
from the firm worked closely with
APCHQ to develop the propo~d
regulations and prepare the final project
report on two-generational houstng.
Nm°r°
Corporate Services Department
Planning & Development
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
web site: www.city.niagarafalls.on.ca
Tel: (905) 356-7521
Fax: (905) 356-2354
E-mail: planning@city.niagarafalls.on.ca
Doug Darbyson
Director
PD-2001-107
December 3, 2001
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls, Ontario
Members:
Re.'
PD-2001-107, Zoning By-law Amendment Application
AM-32/2001, 5845 & 5851 Victoria Avenue
Applicant: Enrico DiRisio
Agent: Italia Gilberti
Niagara Imperial Hotel
RECOMMENDATIONS:
It is recommended that Council:
1)
approve the Zoning By-law Amendment application to amend the current TC-173
zoning for 5845 and 5851 Victoria Avenue conditional upon:
()~are' ~~re~; a;dmg 'nclu.~d!~g ns aug rem t for pa ing
( ) adc masonryw amentalf, ected ' ' elands
z)
require the owner to enter into a site plan agreement that includes details of the
parking lot landscaping, landscape improvements along Victoria Avenue and along the
west side of the building and of the existing site services and any modifications thereto;
and
3) pass the amending by-law included on tonight's agenda, to implement the application.
THE PROPOSAL:
Enrico DiRisio has requested an amendment to the Zoning By-law for the lands known as 5845 and
5851 Victoria Avenue, the Love Boat restaurant and the Comfort Suites, respectively, as shown on
Schedule 1. The amendment is requested to modifythe land's site specific Tourist Commercial (TC-
173) zoning in order to change the usability of the site so as to:
Working Together to Serve Our Community
Clerk's Finance Human Resources Information Systems Legal Planning & Development
December 3, 2001 - 2 - PD-2001-107
· permit surface parking instead of an underground parking structure;
amend the Zoning By-law's definition of a hotel, site specifically, by deleting the
requirements for facilities within a hotel to be connected by an interior corridor and to
eliminate the requirement to provide meeting rooms; and
to delete or modify the current site specific provisions for the number of rooms, building
height, landscaping and setbacks.
A portion of the wing of the existing motel on the north side of the property is to be demolished in
order to accommodate additional surface parking. Refer to Schedule 2 for details.
New site specific zoning is requested to be applied to the lands, replacing the current site specific
zoning.
CIRCULATION COMMENTS:
Information regarding the application was circulated to City departments, several government
agencies and the public for comment. No objections to the application have been received.
PLANNING REVIEW:
The following is a summary of staff's assessment of the application:
Modifications to the site plan with respect to landscaping must be introduced in order
for the proposal to comply with the Official Plan.
The subject property is designated Tourist Commercial in the Official Plan. The land is
located within the Clifton Hill Tourist Subdistrict. The land was rezoned in 1988 for the
existing 10-storey hotel. Part of this approval required the construction of a two-storey
underground parking garage. The garage was never built. Parking was provided off-site on
leased lands. As the lease has now lapsed, all of the required parking is to be provided on-
site. The Official Plan requires that surface parking lots be designed in an aesthetically
pleasing manner as they otherwise detract from the urban landscape. The draft Streetscape
Master Plan contains guidelines for the treatment of surface parking lots. The most desirable
solution is to provide 20 feet of landscaping with trees and low-level plantings between the
streetline and parked vehicles. With anything less than 10 feet of landscaping next to a
streetline, a decorative masonry wall or ornamental fence, with shrub planting, is to be
provided.
The parking lot, as shown on the attached site plan (Schedule 2), is deficient of landscaping
and does not comply with the intent and purpose of the Official Plan. Approximately 9% of
the entire property is landscaped. It would appear that the parking layout can be manipulated
in order to provide for 5 feet of landscaping along the south side of the parking area and a
3-foot strip provided between the parking lot and Ellen Avenue. A 5-foot landscape strip
exists along the north property line. This will increase the landscape coverage to about 11%.
Because the landscaping which can be achieved along Ellen Avenue is less than 10 feet wide,
a decorative masonry wall or ornamental fence will be necessary. By providing this
December 3, 2001 - 3 - PD-2001-107
landscaping, compliance with the parking policies of the Plan's Tourist Commercial section
will be achieved. Accordingly, it is recommended that the by-law include provisions for
landscaping of the parking area and for a decorative masonry wall or ornamental fence to be
erected along Ellen Avenue, and that details of this landscaping be included in the site plan
agreement.
The proposed configuration of the parking lot is not totally functional. There are certain
modifications which can be achieved to improve access to the garbage enclosure which is
not totally accessible in the current plan. Other changes to the orientation of the parking
layout can occur to achieve better efficiency of the lot during the site plan review.
The requested amendment is appropriate for the development.
The land is currently zoned TC-173 which permits the 10-storey hotel and underground
parking garage and establishes a number of site specific provisions. The approval, which
dates to 1988, is based on the Hotel Study Interim Guidelines, the City's first attempt at
establishing policies to guide and regulate high-rise tourist development. Because of these
guidelines, the by-law contains provisions for the number of rooms, setbacks for any
building, or part thereof, below 4 storeys and landscaping.
Current rezonings for high-rise development must comply with the Official Plan's tourism
policies. The tourism policies, introduced by TADS, permits a development to be built to
the property lines and does not impose density regulations, a number of the existing by-law
provisions affecting the subject property are no longer valid. As such, the request to delete
these provisions has merit. In the absence of the site specific provisions, the standard TC
zone provisions of Zoning By-law 79-200 will prevail.
The applicant has also requested that the Zoning By-law definition for a hotel be modified
site specifically to delete the requirements that all facilities be connected by inside corridors
and that a hotel must contain public meeting rooms. There is merit to the site specific
modification of the definition. By deleting the internal connection requirement, the Love
Boat restaurant and the 8 rooms on the second floor of the restaurant can be considered as
part of the hotel. Providing a restaurant within the hotel in order to meet the definition would
be redundant. Inclusion of the Love Boat restaurant as part of the hotel would lessen the
Zoning By-law requirement for parking as restaurants of a hotel have a lower parking
requirement than independent restaurants and hotel units have a lesser parking requirement
than motel units. The provisions of small meeting rooms does not satisfy today's market and
a hotel of this nature does not service the market requiring such facilities.
A new site plan agreement will be required.
The current site plan agreement details the 10-storey hotel with the underground parking
structure. Since this was not constructed and that landscape improvements are being
recommended by staff, a new agreement will be necessary. The drawings are to provide
details of the landscaping, decorative masonry wall or ornamental fence, parking
configuration and site servicing.
December 3, 2001 - 4 -
CONCLUSION:
The requested amendment can be supported for the following reasons:
agreement.
~rrnsley '
Plam6er 2
Reconunended by:
~Doug Darbyson
irector of Planning & Development
Tony Ravenda
Executive Director of Corporate Services
JB:am
Attach.
SSPDR~2001 ~PD2001-107.wpd
PD-2001-107
Modifications to landscaping will achieve compliance with the Official Plan;
The requested amendment is appropriate; and
Landscaping, parking layout and site servicing will be guaranteed through the site plan
Respectfully submitted:
Edward P. Lustig~' ~'
Chief Administrative Officer
SCHEDULE 1
LOCATION MAP
Subject Land
Amending Zoning By-law No. 79-200
5851 & 5845 Victoria Avenue
Applicant: Enrico DiRisio (Agent: Italia Gilberti)
AM-32/2001
l :NTS
BUILDING 'A'
GARBAGE ENCLOSURE
Niagara Falls
Corporate Services Department
Planning & Development
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
web site: www.city.niagarafalls.on.ca
Tel: (905) 356-7521
Fax: (905) 356-2354
E-mail: planning@city.niagarafalls.on.ca
December 3, 2001
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls, Ontario
Members:
Doug Darbyson
Director
PD-2001-111
Re.*
PD-2001-111, Recommendation Report
Miller Road Estates Draft Plan of Subdivision 26T-11-2000-05 (Revised)
Official Plan & Zoning By-law Amendment Application AM-17/2000
727604 Ontario Limited
RECOMMENDATIONS:
It is recommended that:
1)
the application to amend the Official Plan and Zoning By-law be approved as indicated
in this report;
2)
the Miller Road Estates Plan of Subdivision be draft approved subject to the conditions
in the attached Appendix;
3)
the Mayor or designate be authorized to sign the draft plan as "approved" 20 days
after notice of Council's decision has been given as required by the Planning Act,
provided no appeals of the decision have been lodged; and
4)
draft approval be given for three years, after which approval will lapse unless an
extension is requested by the developer and, subject to review, granted by Council.
PROPOSAL:
The subject land is on the north side of Miller Road between Willoughby Drive and the Niagara
Parkway (see the attached location map). The applicant proposes to develop the 32.02 hectare (79.12
acre) site as an estate residential subdivision. The plan contains 22 single-detached lots ranging in
size from 1.01 hectares (2.5 acres) to 2.02 hectares (5.0 acres) and blocks for environmental
protection areas and stormwater management. The proposed street system utilizes an unopened road
allowance extending north from Miller Road and an internal street connecting to Miller Road at the
west limit of the property. The subdivision layout is shown on Schedule 2.
Working Together to Serve Our Community
Clerk's Finance · Human Resources Information Systems Legal Planning & Development
December 3, 2001 - 2 - PD-2001ol 11
The City's Official Plan (Willoughby Township) designates the majority of the site Rural with the
floodplain of a creek on the land designated Environmental Protection Area. The property is zoned
Rural and Conservation-Open Space through Zoning By-law 395/66, as amended. The applicant has
requested changes to the Official Plan and Zoning By-law to provide site specific requirements to
permit the proposed estate residential plan.
BACKGROUND:
The Planning Act requires that a Public Meeting be held to receive input on subdivision proposals
prior to making a decision. Council held the Public Meeting for this plan on July 17, 2000. Several
members of the public spoke at the meeting and written comments were submitted. Concerns were
raised regarding drainage, increased traffic, road access to Willoughby Drive, standard of roadway
construction, and the privacy of residents in the rural area (the whole area should not be opened up
for subdivision development). All comments were referred to staff for technical review. The
required Public Meeting for the Official Plan and zoning amendments is satisfied through tonight's
meeting and provides another opportunity for public comment.
PLANNING REVIEW:
Various matters were considered in assessing the Official Plan amendment, zoning amendment and
proposed plan of subdivision. The applications have been circulated to City departments, Region
and agencies. Based on this analysis, approval is recommended subject to detailed conditions. The
review of the applications is summarized as follows.
Willoughby Land Use Study
The City, Region and Niagara Parks Commission (NPC) hired a consultant in mid-2000 to determine
development opportunities and appropriate land uses/policies for that portion of the former
Township of Willoughby, south of Chippawa between the QEW and Niagara Parkway. The study
was undertaken, in part, in recognition of development pressures likely to arise from the NPC golf
course south of Chippawa. Council recently adopted a report on the proposed planning framework
to finalize the study and initiate Official Plan amendments. The Miller Road Estates plan proceeded
on a preliminary review basis during the early stages of the study and can now be evaluated in the
context of the policy direction for the broader area. The subdivision is within the proposed Estate
Residential designation of the Study. The framework for estate residential development is to be
compatible and complementary to the surrounding golf course and rural character, be sensitively
designed with regard to natural features and served by an internal roadway system. The design of
the proposed subdivision is consistent with the study recommendations, by providing large lots (2.5
acres to 5.0 acres) on private services and preserving woodlots/hedgerows, both in keeping with the
open space/rural character of the area.
Official Plan Amendment
Regional Policy Plan Amendment 113 was adopted in 1998 to redesignate the subject land from
Good General Agricultural Area to Rural in the Region's Policy Plan. Through this review and
approval process, the Region was satisfied with this land use change based on a soil assessment and
December 3, 2001 - 3 - PD-2001-111
level of agricultural activity on the site and in the surrounding area. Special provisions attached to
the Regional amendment require an amendment to the City's Official Plan and estate residential
development proceed by plan o f subdivision. Several factors must be considered in the Official Plan
amendment process as stipulated in the Region's approval, namely: need, suitability of the site, effect
on adjacent properties, adequacy of private services, adequacy of road access, impact on Ussher's
Creek, impact on woodlands and financial impact on the municipality.
The Miller Road Estates applications implement the Regional decision. The City's criteria to assess
the Official Plan amendment are similar to the conditions listed in the Region's earlier approval of
the land use change. Issues of need, site suitability and compatibility have been addressed, in part,
through the Regional Policy Plan change and results of the Willoughby Land Use Study. The site
is not in agricultural use, contains bush and woodlot areas and was supported by a study concluding
viable farming was not an option. The site is within an area identified as desirable to meet the
demand for estate lots in proximity to the golf course. Development of the subdivision is to be on
large lots so as to not create a demand for municipal services, and also uses a through road design
integrated with the existing road network. Additional matters relating to services and environmental
impacts/protection are discussed later in the report.
The existing Rural and the Environmental Protection Area (EPA) designations on the land are
proposed to be changed to a new Estate Residential classification with special policies and a refined
EPA designation. The Estate Residential policies will be consistent with the Willoughby Land Use
framework for large lots (ranging in area from 2.5 acres/1.01 hectares to 5.0 acres/2.02 hectares) for
single-detached dwellings on private services and integrated with natural features. The extent of the
EPA designation needs to be refined through an on-site survey of the 100 year floodline for Ussher's
Creek. The EPA policies will specify that no structures shall be permitted within the designation.
Ussher's Creek and Floodplain
The protection of this watercourse is a key element of any development approval for the site. The
Niagara Peninsula Conservation Authority CNPCA) and Region have provided detailed comments
and conditions in this regard. The boundary of the floodplain must be surveyed to accurately
determine the extent of Official Plan and zoning areas. The majority of Lot 22 appears to be within
the floodplain according to NPCA information. The surveyed 100-year floodplain may affect the
design and layout of certain lots. This watercourse is a "Critical (Type 1)" fish habitat and subject
to the Federal Fisheries Act. The proposed street crossing of the creek and stormwater outlet require
specific approval. The proposed drainage system for the plan involves roadside ditches, grassed
swales, individual rear yard ponding areas and a stormwater management area (Block 25).
Preliminary stormwater management data was submitted with the subdivision application but
additional detailed calculations are required to determine the adequacy of the system and satisfy draft
approval conditions. Approval of lot grading and drainage plans, as well as sediment and erosion
control plans are necessary.
Private Septic Systems
The development is outside of the Urban Area Boundary and no extension of services is proposed
or supported. In rural areas, the intensity and scale of development needs to be limited to ensure the
December 3, 2001 - 4 - PD-2001-111
long term/sustainable function of private waste disposal systems. The Region has provided specific
criteria for the approval of the individual private septic systems for this subdivision (see conditions).
Regional Niagara Public Health Department requires a minimum 2 acre buildable area (outside the
floodplain) for each lot to accommodate the septic system and spare tile bed area in case of failure,
minimum 30 foot (9 metre) setback of the sewage disposal envelope fi.om any lot line and adequate
separation/drainage from the proposed individual lot stormwater ponding areas.
Subdivision Design
The original submission of this plan contained 25 lots (minimum 2 acre area), an average lot size of
2.67 acres, cul-de-sac roadways and no secondary access fi.om the development. Stafffi.om the City,
Region and NPCA met on several occasions with the developer to discuss the plan design. The
revised plan is generally in accordance with municipal objectives and the direction fi.om the
Willoughby Land Use Study. Lot sizes have been increased and a range of size has been provided
with an average lot area of 3.2 acres, a curving street pattern is shown with a connection to Miller
Road at the west limit of the property. The subdivision layout should be compatible with
surrounding rural residential lots and the character of the area. The woodlot (area of Lots 16 to 21)
and hedgerows (Blocks 27 to 30) on the site are to be protected by way of the plan design and
possibly zoning and conservation easements. This woodlot extends to the north beyond the subject
land and the Regional Tree Conservation By-law applies. A Tree Saving Plan is a condition of
approval to define the boundary and identify areas of preservation. Street trees and cash-in-lieu of
parkland dedication are required as standard conditions of draft approval.
Miller Road provides access to the plan and is designated as a Major Collector in the Official Plan.
The existing road allowance is undersized and a road widening abutting the land is required. Miller
Road requires improvement to provide a rural road standard and suitable access to the site, and the
developer must contribute to this construction cost. The Niagara Parks Commission (NPC) has
jurisdiction over the Niagara Parkway to the east and requests an altemative connection to
Willoughby Drive be completed rather than solely relying on their tourist-oriented scenic roadway.
The NPC requests upgrading and roadway improvements at the Miller Road/Niagara Parkway
intersection to address increased traffic resulting from this and future developments. The unopened
municipal road allowance at the east boundary of the plan will be utilized and the developer is
responsible for roadway construction.
Zoning Amendment
Site specific zoning standards will be created for a new Estate Residential zoning category to guide
construction of dwellings, and an appropriate environmental protection/hazard zone for the
floodplain of Ussher's Creek. The residential zoning will reflect the subdivision design with
provisions for minimum lot area (2.5 acres/1.01 hectares) and lot frontages of approximately 60
metres (200 feet). Generous building setbacks from the roadways and property lines will be included
to reflect the estate-quality intended for the development. Special setbacks from the floodplain
boundary and separation from lot lines for septic systems as previously indicated will be required.
The detailed provisions will be developed in consultation with the applicant.
December 3, 2001 - 5 - PD-2001-111
CONCLUSION:
The requested Official Plan amendment implements the Regional decision to redesignate the land
Rural with special requirements in the Regional Policy Plan. The assessment criteria for the
amendment are satisfied or will be addressed through the detailed conditions for the subdivision
approval. The Miller Road Estates Draft Plan of Subdivision is an appropriate development of the
site, is the first planned rural estate residential development in the City and is supported by the
Council-approved direction to finalize the Willoughby Land Use Study. Special requirements for
the floodplain, impact on fish habitat, stormwater management, septic system design and
woodlot/hedgerow protection will safeguard the environment. Lotting within the subdivision may
be modified as a result of such studies. The associated Zoning By-law amendment will provide
guidelines for the construction of the dwellings. The required detailed conditions of subdivision
draft approval are listed in the Appendix.
Prepared by:
Richard Wilson
Planner 2
bmitted:,
Respectfullys~,u J ~
Edward P. Lustig
Chief Administrative Officer
Recommended by:
oug Darbyson
Director of Planning & Development
Approved by:
Tony Ravenda
Executive Director of Corporate Services
RW:gd
Attach.
December 3, 2001 ~ 6 - PD-2001-111
APPENDIX
Conditions for Draft Plan Approval
Approval applies to the Miller Road Estates (Revised) Draft Plan of Subdivision prepared
by Matthews, Cameron, Heywood - Kerry T. Howe Surveying Limited, dated August 27,
2001, showing 22 estate-sized lots for single-detached dwellings, Blocks 23 and 24
(watercourse), Block 25 (stormwater management) and 4 blocks delineating hedgerows.
The developer enter into a registered Subdivision Agreement with the City to satisfy all
requirements, financial and otherwise, related to the development of the land. Note: Should
any other body wish to have its conditions included in the Subdivision Agreement, they may
be required to become party to the Subdivision Agreement for the purpose of enforcing such
conditions.
The developer submit a Solicitor's Certificate of Ownership for the subdivision land to the
City Solicitor prior to the preparation of the Subdivision Agreement.
The subdivision be designed and constructed in accordance with City standards which, in
part, include the following:
a) construction of Street "A" to the City's rural road standard;
b) construction of a rural road to the City's satisfaction in the road allowance between
Concession One and Broken Front Concession Niagara River;
c) dedication of the Street "A" road allowance to the City as public highway and the
streets named to the City's satisfaction;
d) provision of appropriate daylighting triangles at all intersections;
e) dedication of a 3.05 metre (10 foot) road widening to the City along the north side of
Miller Road abutting the plan;
f) provision of an overall roadside drainage system for both major and minor storm
events; and
g) application of the City's Lot Grading and Drainage Policy.
The developer contribute to the cost to construct Miller Road to the City's rural road
standard.
The developer pay the Development Charges in fome at the time of execution of the
Subdivision Agreement.
The developer grant the City and Public Utilities any easements required to service the
subdivision.
The developer pay the City cash-in-lieu of 5% parkland dedication.
The developer provide boulevard trees in accordance with City policy.
December 3, 2001 - 7 - PD-2001-111
10.
11.
12.
13.
14.
15.
16.
17.
The developer submit a Tree Saving Plan for the review and approval of the Director of
Parks, Recreation and Culture respecting the woodlot in the area of Lots 16 through 21.
The developer receive final approval from the City to the zoning by-law amendment to
provide land use regulations to guide the development of the subdivision.
The developer provide three calculated plans prepared by an Ontario Land Surveyor and a
letter to Planning & Development confirming that all lots comply with the Zoning By-law.
The developer provide six copies of the pre-registration plan to Planning & Development and
a letter stating how all the conditions imposed have been or are to be fulfilled.
Final approval be received from Regional Niagara for the required amendment to the City
of Niagara Falls Official Plan.
The developer obtain Certificates of Approval from the Ministry of the Environment for the
stormwater management system for this subdivision and that the Regional Planning
Department be notified accordingly.
Prior to approval of the final plan or any on-site grading, the developer submit two copies
of a stormwater management plan designed and sealed by a suitably qualified professional
engineer, to the Regional Planning Department for review by the Niagara Peninsula
Conservation Authority and to the Ministry of the Environment indicating the following:
a)
the manner in which stormwater will be conveyed across and away from the site, in
both major and minor systems, using stormwater management techniques in
accordance with the "Stormwater Management Practices Planning and Design
Manual", June 1994, Ministry of the Environment and Energy;
b)
a detailed engineering submission providing an assessment of any downstream and
upstream constraints and how these constraints will be addressed (the stormwater
management system should provide adequate protection for downstream fisheries
resources);
c)
an erosion and sediment control plan for the development site indicating the means
whereby erosion and sediment and their effects will be minimized on site during and
after construction in accordance with the"Stormwater Management Practices Planning
and Design Manual", June 1994, Ministry of Environment and Energy;
d) site grading plans.
The subdivision agreement between the developer and the City of Niagara Falls contain
provisions whereby the developer agrees to implement the approved stormwater
management, erosion and sediment control measures required in accordance with Condition
16, to the satisfaction of the Regional Niagara Planning Department and the Niagara
Peninsula Conservation Authority.
December 3, 2001 - 8 - PD-2001-111
18.
19.
20.
21.
22.
23.
24.
25.
The location of the 100 year floodplain be established on-site and confirmation provided that
no sewage system envelopes shall be located within the agreed upon floodplain location, to
the satisfaction of the Niagara Peninsula Conservation Authority, the Regional Niagara
Public Health Department and the Regional Niagara Planning Department.
The useable (i.e. developable) land area outside the agreed upon floodplain limit and
excluding any other topographical constraints or natural features shall not be less than 2 acres
(0.8 hectares) for each lot, to the satisfaction of the Regional Niagara Public Health
Department and the Regional Niagara Planning Department.
The proposed sewage systems designs shall be based on fully raised Class 4 Sewage Disposal
Systems with 100% spare reserve area based on a minimum of 4 bedroom, luxury type
homes and having a minimum area of 2,500 square metres, to the satisfaction of the Regional
Niagara Public Health Department.
The proposed sewage disposal envelopes shall be designed and located no closer than 9
metres (30 feet) to any lot line on each individual lot thereby maintaining a minimum 18
metre (60 feet) separation distance between any 2 sewage disposal envelopes, to the
satisfaction of the Regional Niagara Public Health Department and the Regional Niagara
Planning Department.
The developer submit a detailed, engineered master drainage plan indicating the methods of
diverting stormwater away from the sewage disposal system envelopes for the fully raised
tile beds required on each lot to the Regional Niagara Public Health Department, the Niagara
Peninsula Conservation Authority and the Regional Niagara Planning Department for their
respective review and approval.
The individual lot grading plans for each lot in the subdivision shall be submitted to the
Regional Niagara Public Health Department and the Niagara Peninsula Conservation
Authority for their review and approval.
Prior to final approval, all main drains for the development shall be constructed and
connected in accordance with the approved master drainage plan to the satisfaction of the
Regional Niagara Public Health Department.
a) The developer shall submit on one plan final details for the following:
i. all lots and proposed sizes;
ii. size of building and amenities envelopes and sewage disposal envelopes with
100% spare area (minimum 2,500 square metres) with sewage envelope distances
from proposed lot lines indicated;
iii. the final approved drainage scheme;
iv. the final approved grades for each lot; and
v. the location and type of water supply for each lot.
December 3, 2001 - 9 - PD-2001-111
26.
27.
28.
29.
30.
31.
32.
33.
b) The above plan information shall be provided separately for each lot; and
c)
An approved engineering plan/design shall be provided for septic systems for each lot
in the subdivision;
All to the satisfaction of the Regional Niagara Public Health Department.
The developer submit a Tree Saving or Preservation Plan prepared by a suitably qualified
consultant to the City of Niagara Falls for review and approval and that the subdivision
agreement between the developer and the City include wording whereby the developer agrees
to carry out the recommendations of the approved plan. A copy of the Tree Saving or
Preservation Plan is to be provided to the Regional Niagara Planning Department for
information.
The developer obtain appropriate permits from the Ministry of Natural Resources for the
proposed street crossing of the Ussher's Creek tributary and the proposed stormwater
outlet(s) to the tributary, if required by that Ministry.
If required by the Ministry of Culture, Tourism and Recreation, the developer conduct an
archeological assessment of the property and mitigate, through preservation or resoume
removal, adverse impacts to any significant archaeological resources found. No demolition,
grading, or other soil disturbances shall take place on the subject property prior to the issue
of a letter from the Ministry and the Region to the City of Niagara Falls indicating that all
archaeological assessment or mitigation activities have met licensing and resource
conservation requirements. Note: A copy of the archaeological assessment report is to be
submitted to the Regional Niagara Planning Department for information.
All lands located within the surveyed 100 year floodplain shall be included within an
environmental protection zone where no structural development is permitted.
The developer submit detailed lot grading and drainage plans, delineating both existing and
proposed grades and the means whereby major system flows will be accommodated across
the site, to the Niagara Peninsula Conservation Authority (NPCA) for review and approval.
The developer submit detailed sedimentation and erosion control plans, detailing methods
proposed for the control of silt and erosion during the construction phase and restoration
proposed for the site after construction, to the NPCA for review and approval.
The developer obtain permit approval from the NPCA and the Department of Fisheries and
Oceans for the road crossing and stormwater outfalls to Ussher's Creek.
The developer agree in the executed subdivision agreement to:
a) implement the lot grading drainage plans, sedimentation and erosion control plans, as
noted in Conditions 30 and 31;
December 3, 2001 - 10 - PD-2001-111
b) not place or dump material of any kind, whether originating on-site or off-site, in the
Ussher's Creek floodplain, unless a work permit from the NPCA has been issued;
c) obtain proper permit approvals for any road crossing and stormwater outfalls to Ussher's
Creek as noted in Condition 32;
d) during the construction phase, erect and maintain a sediment control fence 3.0 metres
from the floodplain of Ussher's Creek; and
e) revegetate or otherwise stabilize all disturbed areas immediately following the
completion of construction.
34.
The developer undertake improvements to the intersection of Miller Road and the Niagara
Parkway to the satisfaction of the Niagara Parks Commission.
35.
The developer submit lot grading and drainage plans for Lots 11, 12 and 13 to Canadian
Niagara Power for review and approval.
Clearance of Conditions
Prior to granting approval to the final plan, Planning & Development requires written notice from
applicable City departments and the following agencies indicating that their respective conditions
have been satisfied:
Regional Niagara Planning and Development for Conditions 14, 15, 16, 17, 18, 19, 21, 22,
26 and 28.
Regional Niagara Public Health for Conditions 18, 19, 20, 21, 23, 24 and 25.
Niagara Peninsula Conservation Authority for Conditions 16, 17, 18, 22, 23, 29, 30, 31, 32
and 33.
Ministry of the Environment for Condition 15.
Ministry of Natural Resources for Condition 27.
Ministry of Tourism, Culture and Recreation for Condition 28.
Niagara Parks Commission for Condition 34.
Canadian Niagara Power for Condition 35.
Official Plan & Zoning By-law Amendment
Proposed Plan of Subdivision
Miller Road Estates
26T-11-2000-05 (Revised) & AM-17/2000
Location
Subject Land
NIA A
PLANNING AND DEVELOPMENT DEPARTMENT
The Regional Municipality of Niagara
3550 Schmon Parkway, P.O. Box 1042
Thorold, Ontario L2V 4T7
Telephone: (905) 984-3630
Fax: (905) 641-5208
E-rnail: plan@regional.niagara.on.ca
November 21, 2001
File: D.10.M.11.21
PF-OPA-00051
D.10.M.11.23
PF-ZA-00208
D. 11 .M. 11.24
(26T-11-2000-05)
Mr. Doug Darbyson, MCIP, RPP
Director of Planning
City of Niagara Falls
4310 Queen Street
Niagara Falls, ON L2E 6X5
Dear Mr. Darbyson:
RECEIVED
NOV 2 22001
PLANNING
0E ,VELOPMEN'r
Re:
Official Plan and Zoning By-law Amendment Applications
Miller Road Subdivision
727604 Ontario Limited (B. Sinclair)
Your File: AM-17/2000
City of Niagara Falls
This application proposes to amend the City's planning dbcuments to permit Estate
Residential development of the subject lands. The proposed development of 22 Estate
Residential lots on a 32-hectare (79 acres) site on the north side of Miller Road west of
the Niagara Parkway requires a local Official Plan Amendment and Zoning By-law
Amendment. The proposed development will be on private water and sanitary sewer
systems.
In our letter dated November 13, 2001 (see attached), Regional Planning staff provided
a detailed review of the related proposed plan of subdivision (26T-11-2000-05) and all
matters which must be addressed prior to finalization of that plan. Normally, where a
local official plan amendment is required to facilitate a subdivision application, it is
Regional practice to recommend that subdivision applications not be granted draft
approval until the related Official Plan Amendment has, at least, been adopted by the
local municipality. Recommended Condition of Draft Approval No. 1 in our November
13th letter requiring Official Plan Amendment approval addresses this.
The majority of the matters of concern addressed in our letter of November 13th also
relate to the subject Official Plan and Zoning By-law Amendments. For that reason, we
will not duplicate here what has already been stated. We will, instead, focus on how the
proposed Official Plan and Zoning By-law Amendments could address some of the
concerns as follows:
all lots and proposed sizes;
size of building and amenity envelopes and sewage disposal envelopes with 100%
spare area (minimum 2500 m2) with sewage envelope distances from proposed lot
lines indicated (to be not less than 30 ft.);
the final approved master drainage scheme;
the final approved grading for each lot;
the location and type of water supply for each lot.
A copy of Regional Public Health comments is attached. Detailed Health requirements have
been included in the list of conditions recommended in Appendix I to this letter.
Niagara Peninsula Conservation Authority
Conservation Authority staff will be providing comments and recommendations on the Miller
Road proposal separately. Based on the working agreement established between the Region
and the Authority, the Authority in addition to its normal requirements pertaining to floodplain,
creek crossing, fish habitat and other matters within its jurisdiction will also be responsible for
reviewing all aspects of the stormwater management system proposed for this subdivision on
behalf of Regional Planning. Reference to Authority requirements should be addressed
accordingly.
PROVINCIAL REVIEW
To address Planning Act requirements, the Region and other agencies shall have regard to
Provincial policy requirements. Regional Planning staff have reviewed the Miller Road plan in
light of Provincial policy and provide the following comments:
Affordable Housing
The Provincial Policy Statement while encouraging housing forms and densities designed to be
affordable to moderate and lower income groups also requires that provision be made in all
planning jurisdictions for a full range of housing types and densities to meet projected
demographic and market requirements of current and future residents.
The Miller Road subdivision is not intended to provide affordable housing opportunities but will
contribute to the range of housing available in the Niagara Falls and broader, regional market.
Ministry of the Environment
(i) Land Use Compatibility
There are no industrial er other similar land uses in close proximity to the subdivision
site. Accordingly, a land use compatibility concern does not exist.
(ii) Private Services
As noted, the Provincial Policy Statement indicates that individual on-site servicing
systems may be permitted where communal systems are not feasible and where site
conditions are suitable for the long-term operation of individual private systems. A
communal system is not considered a feasible option for this subdivision as the Region
is not capable of assuming ownership, operation and/or maintenance of communal
systems in the event that future difficulties may arise regarding such systems.
(iii) Stormwater Management
6
The Engineering Report (January 2000) circulated with this application includes some
preliminary stormwater management information. The proposed storm drainage system
will consist of roadside ditches, grassed swales, lot level contr~)ls, individual rear yard
ponding areas and a centralized stormwater management facility on the east side of the
Ussher's Creek tributary to provide quality and quantity controls for the street drainage
system. In addition, sediment and erosion control measures are to be implemented to
prevent the flow of silt into the creek during subdivision construction.
While Regional Planning staff will assign the pdmary responsibility for the review and
approval of the proposed stormwater management system and erosion and sediment
control measures to the Niagara Peninsula Conservation Authority, Planning staff have
identified some items which should be addressed clearly in the final (i.e. detailed)
stormwater management plan for the subdivision. These include:
· the location of the proposed central stormwater management facility in
relation to the Ussher's Creek floodline;
· the manner in which street drainage is to be handled on the west side of
Ussher's Creek, and
· provision of adequate separation distances between rear yard stormwater
ponding areas and septic tile bed mantles.
The submission of a detailed stormwater management plan will be required for this subdivision
pursuant to the conditions recommended in Appendix I to this letter. In this regard the applicant
should note that the stormwater management system should be designed in accordance with
the Stormwater Management Practices Planning and Design Manual, Ministry of the
Environment, June 1994. In addition, Ministry approval will be required for the proposed
stormwater management facility and for the outfall(s) to the Ussher's Creek tributary.
Ministry of Natural Resources
The Ministry of Natural Resources has identified the Ussher's Creek tributary which crosses the
site as "Critical" (Type 1) fish habitat. Accordingly, appropriate stormwater management and
subdivision construction techniques will be required to ensure that there is no harmful alteration,
disruption or destruction of fish habitat associated with the creek. Appropriate engineering
documentation should be submitted to the Niagara Peninsula Conservation Authority in this
regard, including details regarding the proposed Street "A" creek crossing.
With regard to the latter, the issuance of a permit by the Ministry of Natural Resources may also
be required pursuant to the provisions of the Lakes and Rivers Improvement Act. The same
may also apply to the proposed stormwater outlet(s) to the creel(. The applicant should contact
Ministry staff directly in this regard. A provisional condition with respect to the Ministry's
possible interest in these items has been included in the recommended conditions attached as
Appendix I to this letter.
Ministry of Tourism, Culture and Recreation
A review of the Ministry's criteria for determining the potential of this site for the discovery of
archaeological remains indicates that the site may have moderate potential. This is based on
the presence of the Ussher's Creek tributary on the site, its relatively close proximity to the
Niagara River and events associated with the War of 1812 and the presence of some registered
discoveries in the general area.
Based on these indicators, Regional Planning staff have recommended the inclusion of an
archaeological survey of the site as a condition of subdivision approval. However, the applicant
may wish to pursue this matter further with Ministry staff. Any decision as to whether an
archaeological survey should be conducted remains at the discretion of the Ministry.
CONCLUSION
Regional Planning staff can support draft approval of the Miller Road subdivision from a
Regional and Provincial planning perspective subject to the conditions recommended in
Appendix I to this letter.
As an amendment to the City's Official Plan is also required in order to permit the proposed
development to proceed, it is recommended that the City withhold granting draft plan approval
until the amendment has been approved or at least until City Council has adopted the
amendment. In addition, a condition of draft approval has been recommended requiring the
final approval of the City's Official Plan amendment by the Region prior to the City's final
approval of the subdivision.
Please send notice of the City's decision regarding this application.
Yours t~,
Senior Planner
Attachments: 1. Appendix I, Recommended Regional and Provincial Conditions
2. Regional Public Health comments
3. Regional Public Works comments
C:
Regional Councillor W. Smeaton
Mr. B. Sinclair, 6617 Drummond Rd., Niagara Falls, ON L2G 4N4
Mr. G. Cook, 3357 Davey Court, P.O. Box 580, Vineland, ON L0R 2C0
Mr. P. Fisher, 4281 Mitchell Avenue, Niagara Falls, ON L2E 6R4
Mr. Z. Ali, Niagara Engineering, 18 Chessington St.
St. Catharines, ON L2S 3R4
Mr. J. Durst, Area Supervisor, Ministry of Natural Resources, Vineland, ON
Mr. N. Ferris, Regional Archaeologist, Ministry of Tourism, Culture & Recreation
Ms. B. Ryter, Environmental Planning Officer, Ministry of the Environment
Ms. S. Mclnnes, MCIP, RPP, Niagara Peninsula Conservation Authority
Mr. D. Cherrington, Regional Public Works
Mr. D. Beresh, Regional Public Health
APPENDIXI
Conditions of Draft Approval
Miller Road Subdivision
File: 26T-11-2000-05
City of Nia.qara Falls
That prior to final plan approval, the required amendment to the City of Niagara Falls
Official Plan receive final approval from Regional Niagara.
That prior to final plan approval, Certificates of Approval be obtained from the Ministry of
the Environment for the stormwater management system for this subdivision and that the
Regional Planning Department be notified accordingly.
That prior to approval of the final plan or any on-site grading, the owner submit two
copies of a stormwater management plan designed and sealed by a suitably qualified
professional engineer, to the Regional Planning Department for review by the Niagara
Peninsula Conservation Authority and to the Ministry of the Environment indicating the
following:
the manner in which stormwater will be conveyed across and away from the site,
in both major and minor systems, using stormwater management techniques in
accordance with the "Stormwater Management Practices Planning and Design
Manual", June 1994, Ministry of the Environment and Energy;
a detailed engineering submission providing an assessment of any downstream
and upstream constraints and how these constraints will be addressed (the
stormwater management system should provide adequate protection for
downstream fisheries resources);
an erosion and sediment control plan for the development site indicating the
means whereby erosion and sediment and their effects will be minimized on site
during and after construction in accordance with the "Stormwater Management
Practices Planning and Design Manual", June 1994, Ministry of Environment
and Energy;
d. site grading plans.
That the subdivision agreement between the owner and the City of Niagara Falls contain
provisions whereby the owner agrees to implement the approved stormwater
management, erosion and sediment control measures required in accordance with
Condition 3 above, to the satisfaction of the Regional Niagara Planning Department and
the Niagara Peninsula Conservation Authority.
That prior to final plan approval, the location of the 100 year floodplain be established on-
site and confirmation provided that no sewage system envelopes shall be located within
the agreed upon floodplain location, to the satisfaction of the Niagara Peninsula
Conservation Authority, the Regional Niagara Public Health Department and the Regional
Niagara Planning Department.
That the useable (i.e. developable) land area outside the agreed upon floodplain limit and
excluding any other topographical constraints or natural features shall not be less than 2
2
10.
11.
12.
13.
acres (0.8 hectares) for each lot, to the satisfaction of the Regional Niagara Public Health
Department and the Regional Niagara Planning Department.
That the proposed sewage systems designs be based on fully raised Class 4 Sewage
Disposal Systems with 100% spare reserve area based on a minimum of 4 bedroom,
luxury type homes and having a minimum area of 2,500 square metres, to the
satisfaction of the Regional Niagara Public Health Department.
That the proposed sewage disposal envelopes shall be designed and located no closer
than 9 metres (30 feet) to any lot line on each individual lot thereby maintaining a
minimum 18 metre (60 feet) separation distance between any two sewage disposal
envelopes, to the satisfaction of the Regional Niagara Public Health Department and the
Regional Niagara Planning Department.
That prior to final approval, a detailed, engineered master drainage plan indicating the
methods of diverting stormwater away from the sewage disposal system envelopes for
the fully raised tile beds required on each lot shall be submitted to the Regional Niagara
Public Health Department, the Niagara Peninsula Conservation Authority and the
Regional Niagara Planning Department for their respective review and approval.
That prior to final plan approval, individual lot grading plans for each lot in the subdivision
shall be submitted to the Regional Niagara Public Health Department and the Niagara
Peninsula Conservation Authority for their review and approval.
That prior to final plan approval, all main drains for the development shall be constructed
and connected in accordance with the approved master drainage plan to the satisfaction
of the Regional Niagara Public Health Department.
That prior to final Plan approval, the applicant submit on one plan final details for
the following:
iii.
all lots and proposed sizes;
size of building and amenities envelopes and sewage disposal envelopes
with 100% spare area (minimum 2,500 square metres) with sewage
envelope distances from proposed lot lines indicated;
the final approved drainage scheme;
the final approved grades for each lot, and
the location and type of water supply for each lot.
b. That the above plan information be provided separately for each lot, and
That an approved engineering plan/design be provided for septic systems for
each lot in the subdivision.
all to the satisfaction of the Regional Niagara Public Health Department.
That prior to final plan approval, the owner submit a Tree Saving or Preservation Plan
prepared by a suitably qualified consultant to the City of Niagara Falls for review and
approval and that the subdivision agreement between the owner and the City include
wording whereby the owner agrees to carry out the recommendations of the approved
plan. A copy of the Tree Saving or Preservation Plan is to be provided to the Regional
Niagara Planning Department for information.
3
14.
15.
That prior to final plan approval, the owner obtain appropriate permits from the Ministry
of Natural Resources for the proposed street crossing of the Ussher's Creek tributary
and the proposed stormwater outlet(s) to the tributary, if required'by that Ministry.
That prior to final plan approval, and if required by the Ministry of Culture, Tourism and
Recreation, the owner conduct an archaeological assessment of the property and
mitigate, through preservation or resource removal, adverse impacts to any significant
archaeological resources found. No demolition, grading, or other soil disturbances shall
take place on the subject property pdor to the issue of a letter from the Ministry and the
Region to the City of Niagara Falls indicating that all archaeological assessment or
mitigation activities have met licensing and resource conservation requirements.
Note: A copy of the archaeological assessment report is to be submitted to the
Regional Niagara Planning Department for information.
Clearance of Conditions
That the Miller Road plan of subdivision not be granted final approval for registration by the City
of Niagara Falls until written notification has been received from the following agencies noting
that their requirements have been addressed satisfactorily:
· Regional Niagara Planning for Conditions 1, 2, 3, 4, 5, 6, 8, 9, t3 and 15
· Regional Niagara Public Health for Conditions 5, 6, 7, 8, '10, 1t and t2
· Niagara Peninsula Conservation Authority for Conditions 3, 4, 5, 9 and t 0
· Ministry of the Environment for Condition 2
· Ministry of Natural Resources, if required, for Condition 14
· Ministry of Tourism, Culture and Recreation, if required, for Condition 15
Subdivision Agreement
Prior to registration of the Subdivision Agreement, a copy of the executed Agreement for the
proposed development should be submitted to the Regional Niagara Planning Department for
verification that the appropriate clauses pertaining to Conditions 3, 4 and '13 have been
included.
A copy of the executed Subdivision Agreement should also be submitted to the Niagara
Peninsula Conservation Authority for review prior to its registration.
NIA'~A
PUBLIC HEALTH DEPARTMENT
The Regional Municipality of Niagara
573 Glenridge Avenue
St. Catharines, Ontario L2T
Telephone: 905-688-3762 or 1-800-263-7248
Fax: 905-641-4994 ~=~
E-mail address: inspect(&reqional.nia~ara.on.ca
October
Regional Niagara
Planning Department
2201 St. David's Road
Thorold, Ontario
L2V 4'17
Attention: Erie Conley
Dear Hr. Conley:
RE: Proposed Miller Road Estate Residential Subdivision
Miller Road & Niagara Parkway~ Niagara Falls~ Ontario
This letter will confirm our review of the above-mentioned plan proposal dated August
27, 2001, for the Hiller Road Subdivision and offer the following comments /
recommendations. Our comments are based on both present and former requirements
for subdivision development in a rural area.
The applicants have proposed the subdividing of 30.50 hectares 97.5 acres) into 22
single-family estate lots. These lots range in size from 2.5 acres to 5 acres with luxury
type, 4 bedroom homes on private sewage disposal systems and private wells or
cisterns.
Recommendations and Comments for Draft Approval
A tributary of Ushers Creek traverses the property. One hundred-year flood level
mapping has been included with the proposal. Plans should confirm, to the
satisfaction of the Niagara Peninsula Conservation Authority, Regional Niagara
Public Health and Planning Departments that sewage disposal envelopes are not
proposed within the 100-year flood plain. Useable land area for all construction
purposes in each lot should total approximately 2 acres, i.e., outside of flood
plains, etc.
Eric Conley, Regional Niagara Page two
The proposed sewage systems designs are to be based on fully raised Class 4
Sewage Disposal Systems with 100% spare reserve area based on a minimum of
4 bedroom, luxury type homes.
Sewage disposal envelopes should reflect a minimum of 2,500 square metres.
By nature, this particular subdivision may invite larger residences than have been
designed for. These proposals will have to be evaluated and approved of on an
individual basis.
Sewage disposal envelopes shall be designed and located no closer than 30 feet
to proposed lot lines for each individual lot, i.e., maintaining a 60 foot separation
between proposed sewage disposal envelopes.
A detailed-engineered master surface water drainage plan must be provided.
This plan must be approved by all agencies having jurisdiction, i.e., City of
Niagara Falls, Niagara Peninsula Conservation Authority, Regional Municipality of
Niagara, etc. This plan must indicate methods of diverting storm water away
from sewage disposal system envelopes for each lot since fully raised tile beds
are proposed for each of the lots in the subdivision.
]~ndividual lot grading plans must be submitted for each lot in the subdivision.
This plan must be approved by agencies having jurisdiction over grading.
Prior to final approval, it is recommended that all main drains for the
development be constructed and connected in accordance with the approved
master drainage plan. In order for surface water drainage to be diverted and
exited from the proposed development site.
(a) It is recommended that prior to final approval, the applicant submit on one
plan final details for the following:
i. All lots and proposed sizes;
ii. Size of building and amenities envelopes and sewage disposal envelopes
with 100% spare area (minimum 2,500 square metres) with sewage
envelope distances from proposed lot lines indicated;
iii. The final approved drainage scheme;
iv. The final approved grades for each lot;
v. The location and type of water supply for each lot.
Eric Conley, Regional Niagara Page three
(b) It is recommended that the above plan information be provided separately
for each lot.
(c)
It is recommended that an approved engineering plan/design be provided
for septic systems for each lot in the subdivision.
Should you have any questions regarding the above, please do not hesitate to contact
this Department.
Yours truly,
Dennis Beresh, ¢.P.H.I.(¢)
Hanager, Food Safety & Healthy Environments
For: Robin Williams, MD, DPH, FRCP(C)
Hedical Officer of Health
c.c. Doug Darbyson, Director of Planning, City of Niagara Falls
DB:mf~
2001DB18.LTR. DOC
NIA~A
1#:t
DATE:
TO:
SUBJECT:
THE REGIONAL MUNICIPALITY OF NIAGARA
October 10, 2001
Eric Conley
Planning and Development Department
Draft Plan of Subdivision
Miller Road Estates (26T-11-2000-05) - REVISED
Owner/Applicant: 727604 Ontario Ltd. 01rlan Sinclair)
Proposed: 22-Single Family Residential Units
Location: NS of Miller Road between Willoughby Drive and Niagara
River Parkway
In the City of Niagara Falls
Our File: D.11.000 (208) (ID#551)
The above-referenced Draft Plan of Subdivision proposes only a slight change to the number of
lots from 25 to 22 and the area of subdivision from 75.24 acres to 79.12 acres.
Therefore, our previous comments in our letter of July 14, 2000 (attached) still applies.
/
William J. S,.)f~en"i'7, CTE.T. - -
Development & Approvals Manager
VD/cm
L:\Engineering-Planning-and-Development\Dopke-Vic\Niagara Falls\3974.e.conley. memo.doc
Attachment
~. woNiagara
rks
NIAGARA
/.!
THE REGIONAL MUNICIPALITY OF NIAGARA
MEMORANDUM
DATE:
TO:
SUBJECT:
July 14, 2000
Pat Busnello
Planning Department
Draft Plan of Subdivision
Miller Road Estates (26T-11-2000-05)
Owner: 727604 Ontario Ltd. (Brian Sinclair)
NS of Miller Road between
Willoughby Drive and Niagara River Parkway
City of Niagara Falls
Our File: D.11.000.(208)
Regional Niagara Public Works staff reviewed the above-referenced draft plan of
subdivision, which proposes 25-single family residential units and submit the
following comments, noting that we would oppose this application if there is any
requirement by the Ministry of the Environment to develop this subdivision, utilizing
communal sewage disposal and water supply systems for which. Regional involvement
is necessary, as we are not capable of assuming ownership, operation and/or
maintenance of such facilities.
1. Servicing
Information 'provided with this application indicates that the use of a private water
well and septic tile leaching bed system is contemplated to service each lot.
Approval of same is the responsibility of the Regional Public Health Department.
Although we have no objections to the development proceeding utilizing
individual private services, we would oppose the project if there is any
requirement by the Ministry of the Environment to develop utilizing communal
water supply and/or sewage disposal systems for which Regional involvement
would be required. In this regard, Regional Niagara is not capable of assuming
ownership, operation and/or maintenance of any communal water and/or sewer
system to service this proposal. The Ministry's position on this matter should be
stated prior to further consideration of this plan of subdivision. Also, a servicing
report satisfactory to the Regional Public Health Department should be prepared
to indicate the suitability of these lands to support residential development
utilizing individual wells and septic system.
Pat Busnello
July 14, 2000
Page 2
Storm Drainage
Storm water runoff is a local issue for which the
responsible.
City of Niagara Falls is
· 3. Regional Roads
This proposal neither abuts nor proposed access to any roadway under the
jurisdiction of the Region.
In summary, we have no objections to the approval of this plan on condition that the
Ministry of Environment and Regional Niagara Pubfic Health Department approve the
private water supply and sewage disposal systems for this development.
Manager of Engineering Planning and Development
DPJcm
CC:
D. Beresh, Regional Niagara Public Health
D.. Darbyson, City of Niagara Falls
P. Fisher, Phil Fisher & Associates Ltd.
G. Cook, Gary Cook & Associates
Z. Ali, Niagara Engineering
L:\Engineedng-Planning-and-Development\Rusnak-Oave\Niagara Falls\2090.p.busnello.memo.doc
Planning
RECEIVED
NOV 2 2 2001
& DEVELOPMENT
The Niagara Parks Commission
R0, Box 150, Niagara Fails, Ontario, Canada L2E 6T2
Brian E. Merrett
Chairman
John A.M. Kernahan
Ontario General Mana~w
Mr. Doug Darbyson
Director of Planning
City Hall
4310 Queen Street
Niagara Falls, ON L2E 6X5
E-Mail: npinfo~niagaraparks.com
Web Site: http://www, niagaraparks.com
Tel~ph0ne 905/356-2241 Fax 905/354-6041
Engineering Fax: 9051356-7262
E-Mail: npceng@niagaraparks.com
October 24, 2001
Dear Sir:
RE: PROPOSED MILLER ROAD ESTATES SUBDIVISION (REVISED AUGUST 27, 2001)
CITY OF NIAGARA FALLS, ONTARIO
· We have reviewed the revised plans for the above noted subdivision and have the following comments:
The Niagara Parkway is a controlled access highway under the Niagara Parks Act. Regulation
13- (11) states that no heavy vehicles are allowed within the Parks unless making deliveries to an
owner abutting the Parks. Miller Road therefore must be improved to municipal standards westerly
to Willoughby Drive for access to the site by trucks during construction and for future deliveries/
pick up. The upgrading of Miller Road to Willoughby Drive would also benefit future residents of
the subdivision and service vehicles, by allowing them an alternative route to the primarily tourist
orientated Niagara Parkway.
Upgrading and intersection improvements including concrete curbs will be required at the Niagara
Parkway / Miller Road intersection due to the additional traffic that this proposed subdivision, as
well as other available building lots along Miller Road will generate.
Thank you for circulating The Niagara Parks, and we would appreciate being kept informed of the status
of this proposal.
Yours truly,
David Giilis
Manager Planning and Properties
NIAGARA PENINSULA
CONSERVATION
A U T I~ 0 R I T Y
zSo ThoroM I~ad We~t, )~d R~m Tel (~)
October 23, 2001
Sent by fax 1~905-356-2354
Our File No. MPR 6.9.107
City of Niagara Falls
4310 Queen Street
Niagara Falls, ON L2.E 6X5
Attention: Mr. Rick Wilson, Planner
Dear Mr. Wilson,
Subject: Draft Plan of Subdivision Miller Road Estates
File No. 26T-11-2000-05
Further to your letter of September 21, 2001, outlined below are our cotangents on the revised draft plan of
subdivision dated August 27, 2001 as prepared by Matthews, Cameron, Heywood ~ Kerry T. Howe
Surveying Limited.
Please note that our comrr~nts from July 4, 2001 continue to apply as it appears that the majority of lot 22
is located within the floodplain. It appears that the base map used for the subdivision is the Authority's
floodplain mapping for the area. The subdivision plan does not appear to include elevations surveyed in
the field. The extent of the floodplain on site will need to be determined in the field by the developer.
The Conservation Authority requires additional information about stormwater management on the site,
including:
Location of stormwater rcanagement facility to be confirmed and information (including catculations)
provided to confirm that the revised stormwater management block is of a su~cient size to store the
expected runoff;
· Clarification of the means whereby stormwater runoff captured in street A's roadside ditches west of
Ussher's Creek shall be treated for both quality and quantity; '
· location and means of stormwater conveyance to all proposed stormwater management facilities shatl
be provided. We recommend that all paths of overland flow be subject to an easement.
· Confirmation shall be provided that the City of Niagara Falls will assume ownership and maintenance of
all proposed stormwater management facilities,
Please give me a call if you have any questions.
$incerety,
Suzanne Mclnnes, M.C.I.P,,
Watershed Planning Coordinator (ext_235)
cc. E. Conley, Region of Niagara Planning Department, fax 905-641-5208
Niagara Engineering, fax 905-984-6906
/05/01 T}iU 08:08 FAX 905788~121 NPCA ~001
NIAGARA PENINSULA
CONSERVAllON
A U T H 0 R ! T Y
July 4, 2001
Sent by fax 1-905-356-2354
Our File No. MPR 6.9.107
City'of Niagara Falls
4310 Queen Street
Niagara Falls, ON L2E 6X5
Attention: Mr. Rick Wilson, Planner
Dear Mr. Wilson,
Subject:
Draft Plan of Subdivision
Miller Road Estates
File No. 26T-11-2000-05
City of Niaqara Falls
Further to our letter of January 5, 2001 and our meeting on June 1, 2001 we would like to cladfy the 100
year floodplain elevations on the site. Our eadier letter indicated that the 100 year floodplain elevation was
569.71 feet G.S.C. This figure was incorrect. The floodplain mapping in attached and shows 3 elevations
on the site, 575.32 feet G.S.C. near Miller Road, 574.51 feet G.S.C. north of the hedgerow between lots 15
and 16, 573.11 feet G.S.C. just south of Weaver Road.
Please note that some of the lands within lot 22 as shown in the revised subdivision plan (provided to us at
our meeting on June 1, 2001) are within the 100 year floodplain. It appears that the base map used 'for the
subdivision is the Authority's floodplain mapping for the area. The subdivision plan does not appear to
include elevations surveyed in the field. The extent of the floodplain on site will need to be determined in
the field by the developer.
Please give me a call if you have any questions.
Sincerely,
Suzanne Mclnnes, M.C.I.P., R.P.P.
Watershed Planning Coordinator (ext.235)
2001
PLANNING
CC,
E. Conley, Region of. Niagara Planning Department, fax 905-641-5208
Niagara Engineering, fax 905-984-6996
jl/08/01 ffON 08:00 FA~ 90S788~21 NPCA ~001
.~J~ NIAGARA PENINSULA
CONSERVAllON
A U T H 0 R I T Y
Janua~ 5,2001
Sent by fax 1-905-356~2354
Our Flle No. MPR 6,9,107
City of Niagara Falls
4310 Queen Street
Niagara Falls, ON L2E 6X5
Attention: Mr. Rick Wilson. Planner
Dear Mr. Wilson,
Subject: Draft Plan of Subdivision
Miller Road Estates
File No. 26T-11-2000-05
City of Niaqara Falls
Further to the circulation of this plan of subdivision and rezoning applicatiofi, Conservation Authority staff
have completed our review of the proposal and provide the following comments for your consideration.
The property is located within the "Rural" designation in the Region of Niagara Official Plan and is located
on the north side of Miller Road, east of Willoughby Ddve, between Willoughby Drive and Niagara River
Parkway. It isour understanding that the property is located in an area that is the subject of the
. "Willoughby Land Use Study". The proposal is to create a 25 lot residential plan of subdivision.
Accordingly, Authority objectives when revieWing this proposal would pertain to ensudng that life and
property is not affected by slope stability problems, that soil erosion and sedimentation is minimized, and
that the natural integrity of the Ussher's Creek system are maintained over the long term.
From our review of the subject property, it has been noted that Blocks 26, 27 and 28 incorporate the lands on
the property within the 100 Year Flood elevation of 569,71 feet G,S,C. of the Ussher's Creek, and as such.
would be subject to the current Floodplain Management Policies of the Authority. Street B crosses Ussher's
Creek and Will require a work permit under the Conservation Authodty's Regulations. As well, the stormwater
outlets to the Creek will require a work permit from the Conservation Authority. Both the crossing and the
stormwater ouffalls will also require approvals under the Federal Fisheries Act, It should also be noted that
the Conservation Authority has entered into an agreement with the Federal Department of Fisheries and
Oceans to undertake proposal screening for that agency. Accordingly, projects involving work in or near
watercourses which may have the potential to cause a harmful alteration, disruption, or destruction to fish
habitat (HADD) are referred to DFO for their review and approval prior to approvals being issued by .the
Conservation Authority. The Conservation Authority also acts as contact agency in this regard.
Technical staff have reviewed the Engineering Report dated January 2000 as prepared by Niagara
Engineering, The report proposes individual ponding areas for each of the subdivision lots. While
conceptually it is a good idea to control stormwater at the source, there are a number of concerns that
need to be addressed before we can suppor~ the proposal. Additional information is required, including:
· calculations relating to pre and post development runoff for the site to determine the size of the ponding
areas;
a preliminary lot grading plan to determine lot drainage patterns;
identification of the mechanisms to ensure that the ponding areas continue operating over time {the
municipality may have to look at easements or other methods); and
· satisfTing the Health department that the leachate from the septic beds (which in some cases are
located very near the ponding areas) will not seep Into the ponding areas.
The Engineering Report indicates that road drainage quality and quantity is proposed to be drained into a
detention facility prior to discharge to Ussher's Creek. Additional Information (including calculations) is
required to confirm that the area of Block 28 is of a sufficient size to store the expected runoff, The final
ownership of the detention pond block and the foodplain blocks should be verified. We recommend that
the City ultimately own these Blocks to ensure future maintenance and prevent unauthorized alterations.
In fight of the above, Authority staff request that the following are included as conditions of subdivision
approval for this development:
1. That all lands located within the floodplain be included within an Environmental protection zone where
no structural development is permitted;
2, That detailed lot grading and drainage plans, delineating both existing and proposed grades and
the means whereby major system flows will be accommodated across the site. be submitted to
the Conservation Authority for our review and approval.
3. That detailed sedimentation and erosion control plans detailing methods proposed for the control of silt
and erosion during the construction phase and restoration proposed for the site after construction be
submitted to the Authority for our review and approval;
4. That permit approval be obtained from the Conservation Authority and the Department of Fisheries and
Oceans for road crossing and stormwater ouffalls to Ussher's Creek, and
5, That the owner agrees in the executed subdivision agreement to:
a) Include all lands located within the floodplain be included within an Environmental protection zone
where no structural development Is permitted.
b) implement the lot grading and drainage plans, sedimentation and erosion control plans, as noted in
conditions to above;
c) nol place or dump material of any kind, whether originating on-site or off-site in the Ussher's Creek
floodplain, unless a work permit from the Conservation Authority has been issued,
d) obtain proper permit approvals for any road crossing and stormwater outfalls to Ussher's Creek as
noted in condition above
e) during the construction phase, erect and maintain a sediment control fence 3,0 metres from the
floodplain of Ussher's Creek; and
f) revegetate or otherwise stabilize all disturbed areas immediately following the completion of
construction.
The Conservation Authority would like to receive a copy of Council's decision on the proposed subdivision
and rezoning applications. Please give me a call if you have any questions.
~1/08/01 ~0N 08:01 FAX 905?381121 NPCA ~003
Sincerely,
Suzanne Mclnnes, M.C.I.P., R.P.P.
Watershed Planner (ext2$5)
cc. Region of Niagara Planning Department, fax 641-5208
3uly 14, 2000
City of Niagara Falls
Planning and Development Department
P.O. Box 1023
Niagara Falls, Ontario
L2E 6X5
Attention: Doug Darbyson
Dear Sir
RE: Miller Road Estates file no. 26T-11-2000-05
Canadian Niagara Power (CNP) has no objection to the approval of this
development provided the conditions listed below are met.
:1. That the drainage of, the operation of and access to our dght of way not be
adversely affected.
2. That no structures, other than fences, are allowed within 5.0 m. of CNP's
boundary with this development.
3. Any fences be restricted to less than 2.0 m, in height and be set back 0.3 m.,
from the boundary with CNP, upon the lands this development.
4. That no trees of a variety that will eventually grow into our lines be planted in a
location that will allow this to occur.
If you have any questions or require more information please call me at 1-905-
87:1-0330 Extension 3222.
Sincerely
COPY
Richard A. (Rick) Berry
RECEIVED
SEP 2 4 2001
& DEVELOffi E
U:\correspondence-2000~vh[ler Road Estates-02.doc
The City of ~
Corporate Services Department
Planning & Development
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
web site: www.city.niagarafalls.on.ca
Tel: (905) 356-7521
Fax: (905) 356-2354
E-mai[: planning@city.niagarafal[s.on.ca
Doug Darbyson
Director
PD-2001-108
December 3, 2001
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls, Ontario
Members:
Re: PD-2001-108, Updating the Tourist Area
Development Application Guide
RECOMMENDATION:
It is recommended that the Tourist Area Development Application Guide be adopted and updated
as outlined in this report.
BACKGROUND:
The C, ity's Tourist Area Development Application Guide effectively implements the municipality's
Official Plan policies for high-rise development. The Guide sets out building design parameters
governing the character, height and massing of high-rise buildings, requisite studies to support proposed
applications and application procedures. Since the Guide was originally approved by Council,
approximately three years ago, two matters have arisen necessitating the Guide's updating.
1) Ontario Municipal Board (OMB) Hearing
As Council is aware, the OMB held a week long heating in September 2001 to consider appeals
to two high-rise development applications:
· AM-46/2000 - proposed 15 storey Lodge by the Falls, 6039 Fallsview Boulevard
· AM-03/2001 - proposed 16-storey addition to the Days Inn Hotel, 6546 Fallsview Boulevard
Rather than dealing with the planning merits of each application, the appellants challenged the
status of the City's Tourist Area Development Application Guide and the City's use of same in
evaluating high-rise development applications. While the OMB clearly dismissed the appellant's
challenge in favour of the City, the Board was of the view that Council should formally adopt
the Tourist Area Development Application Guide, thereby clarifying its status as a guideline
document. Staff recommends the adoption of the by-law appearing on tonight's agenda which
will confirm that Council has implemented built form and urban design guidelines as referenced
in the City's Official Plan.
Working Together to Serve Our Community
Clerk's Finance Human Resources Information Systems Legal Planning & Development
December 3, 2001 - 2 - PD-2001-108
2) Building Design Changes
The planning approval process for high-rise development applications inherently contemplates
the construction of buildings in compliance with the approvals given. Various stakeholder
groups, such as the Niagara Parks Commission, the general public, property owners in the
immediate vicinity of an approved development, and the business community at large, rely on
the approval process to ensure that developments are constructed as approved. In the event that
a developer may wish to alter his building plans after formal approval has been given, an
administrative procedure needs to be established in order to protect the integrity of the system.
In this regard, staff recommends that an addendum be added to the Tourist Area Development
Application Guide which would require a further review of the proposed changes by the
Architectural Peer Review panel at the expense of the applicant.
CONCLUSION:
It has been the practice of the City to use the design guidelines of the Tourist Area Development Strategy
(TAXIS) for all recent high-rise buildings in the tourist core. Formal adoption will implement the
Official Plan policy in this regard and will clarify the intent of Council.
Prepared and recommended by:
oug Darbyson
irector of Planning & Development
Respectfully submitted:
Edward P. Lustig
Chief Administrative Officer
Approved by:
Tony Ravenda
Executive Director of Corporate Services
DD:tc
F1LE: SSPDRk2001 \PD2001-108 wpd74
Corporate Services Department
Planning & Development
4310 Queen Street
P.O. Box 1023
Niagara Fails, ON L2E 6X5
web site: vcww.city.niagarafalls.on.ca
Tek (905) 356-7521
Fax: (905) 356-2354
E-mail: planning@city.niagarafalls.on.ca
December 3, 2001
Doug Darbyson
Director
PD-2001-'109
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls, Ontario
Members:
Re: PD-2001-109, Regional Policy Plan Amendment No. 166
MetCap Living
RECOMMENDATIONS:
It is recommended that:
1)
Council advise the Regional Municipality of Niagara that it does not support Regional
Policy Plan Amendment No. 166; and
2)
a copy of this report be forwarded to the Regional Municipality of Niagara Planning
and Development Department for its information.
BACKGROUND:
An application to amend the Regional Policy Plan has been received from MetCap Living. The
purpose of the amendment is to permit a 160-bed long-term care facility for seniors on a 2.6 hectare
(6.4 acre) parcel located on the southwest comer of Marshall Road and the Niagara River Parkway
in the City of Niagara Falls. M. Radojcic, K. Radulovich, and M. Madulovich currently own the
property. A site plan showing the location of the subject property is attached as Schedule 1.
The applicants propose to service the facility by means of private water and by on-site private
sewage treatment facilities.
The Regional Policy Plan designates the lands as "Good General Agricultural Area". Policy 12.14,
ho~vever, contains special policies for lands west of the Niagara Parkway in the City of Niagara Falls.
Continued low-density residential development is permitted to a depth of 140 metres (450 feet) west
of the Parkway. The applicant seeks a site specific amendment to the Regional Policy Plan to permit
the proposed development.
Working Together to Serve Our Community
Clerk's Finance Human Resources Information Systems Legal Planning & Development
December 3, 2001 - 2 - PD-2001-109
The City of Niagara Falls Official Plan designates the site "Parkway Residential" that permits estate
type residential development. The site has a draft approved plan of subdivision on the Niagara River
Parkway frontage for 4 large estate residential lots (Parkway Acres Estate Subdivision).
Applications to amend the City's Official Plan and Zoning By-law have been submitted. Planning
staff' can process these amendments once the Region has dealt with the appropriateness of the
proposed site at the subject location outside of the urban area boundary.
The proposed development is premised on a funding allocation from the Ontario Ministry of Health
and Long-Term Care in 1999 for the development of a 160-bed long-term care facility in the City
of Niagara Falls. The funding is part of the Provincial government's announced $1.2 billion
investment to expand and enhance long-term care facilities and community based programs.
SITE AND SURROUNDING AREA:
There is a single-family residential dwelling on the site. The majority of the site consists of bush and
scrub vegetation. The property abuts the Niagara River Parkway and the recreation trail.
To the south is an estate residential dwelling currently under construction and further south some
existing estate residential development. To the west of the site are vacant scrub lands. Further west
are four residential dwellings on the north side of Marshall Road, a north/south hydro corridor,
Willoughby Drive and an auto parts recycling business. To the east of the site are the Niagara River
Parkway and the Niagara River.
To the north of the site is an estate residential dwelling fronting on the Niagara Parkway and on
Marshall Road. The Mingle Estates Subdivision lands are to the north.
PLANNING ISSUES:
The following comments are submitted based on a review and assessment of the proposal.
The proposal does not comply with the Official Plan policies.
The lands are designated Parkway Residential in the Official Plan. The use of the land is limited to
estate residential type lots. Institutional uses are not permitted within this designation and would not
be in keeping with the character of the intended development for the immediate area. A letter of
concern from a resident is attached as Schedule 2.
The proposal is not consistent with the principles of "Smart Growth".
Provincial Policy statements indicate the focus of growth should be directed toward cities, towns,
villages and hamlets. The purpose of such policy is to allow cost effective, efficient development
and prevent urban sprawl. This objective is a fundamental principle of "Smart Growth". The
Parkway Residential designation is a unique linear designation which reflects historical rural
residential development along the Parkway. The nursing home is considered to be an urban
institutional use which should be directed to the urban area.
December 3, 2001 - 3 - PD-2001-109
The application proposes that the 160-bed long-term care facility be serviced by private services with
sewage leaving the facility being routed to an on-site sewage treatment plant at the rear of the
property. After treatment, outflow will be pumped to the Niagara River. While it may be feasible
to receive approvals from the Province for such a private servicing strategy, it cannot be considered
"Sruart Growth" planning. The preferred method for servicing the proposed use are full urban
services which can be provided within the urban area.
Council is aware of the servicing problems which have been acknowledged by the Regional Health
Services Department in the north/west quadrant of the City for urban development such as Club
Italia and the Regency Motel. While technology for private services may have improved, the
northwest quadrant is an example of what can happen when "Smart Growth" objectives are not
applied and should be taken into consideration for this development.
Other locations within the City should be more fully investigated.
There are no strong arguments provided in the application as to why the proposed development
cannot be accommodated within the urban area boundaries. The planning report submitted with the
application indicates a variety of potential development sites were considered and dismissed based
on parcel size, timing of servicing options and development approvals. No details on these potential
development sites were supplied. In addition to the long term planning implications, the
appropriateness of the proposed development's location may not be the best to serve the interests of
the clientele. The subject property is situated further away from hospitals, ambulance service and
fire protection. There is an existing parcel of land, approximately six acres in size, situated on the
north side of Weinbrenner Road which was recently rezoned to accommodate a nursing home. The
amendment requested was for 150 beds. This site is currently undeveloped.
The proposal does not fit the adopted Willoughby Land Use Study framework for future
development.
As Council is aware, the subject property is situated within a larger area which has been the subject
of the Willoughby Land Use Study. After considering all of the background material from the study,
staff is suggesting the maintenance of the existing Parkway Residential development and its low
density linear development.
CONCLUSION:
The proposed amendment to the Regional Policy Plan cannot be supported for the following reasons:
the development does not conform with the Official Plan;
the site does not represent "Smart Growth" and is an example of urban sprawl not in keeping
with contemporary planning objectives; and
· existing sites are available within the urban area.
December 3, 2001 - 4 - PD-2001-109
Therefore, staff recommends Council inform the Region that it does not support the proposed
amendment.
Planner 2
Recommended by:
~Doug Darbyson
irector of Planning & Development
Approved by:
Tony Ravenda
Executive Director of Corporate Services
DH :gd
Attach.
S:~PDR~2001~PD2001-109 wpd
Respectfully submitted:
Edward P. Lustig
Chief Administrative Offer
SCHEDULE 1
LOCATION MAP
Subject Land
Amending Zoning By-law No. 79-200
Location: Comer of Marshall Road and
Niagara River Parkway
Applicant: METCAP LIVING
AM-29/2001
1 :NTS
SCHEDULE2
RECEIVED
NOV 2 22001
& DEVEI,~
The City of ~l~ll~
,,,ogor,:, o,s II1 :.
I -
Corporate Services Department
Planning & Development
4310 Queen Street
P.O. Box 1023
Niagara Fails, ON L2E 6X5
web site: www.city.niagarafalls.on.ca
Tel: (905) 356-7521
Fax: (905) 356-2354
E-mail: planning@city.niagarafalls,on,ca
December 3, 2001
Doug Darbyson
Director
PD-2001-110
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls, Ontario
Members:
Re:
PD-2001-110, Burnfield Lane Draft Plan of Condominium
File: 26CD-11-2001-01
3241 Montrose Road
Owner: Grey Forest Homes Ltd.
RECOMMENDATIONS:
It is recommended that:
1)
the Burnfield Lane Plan of Condominium be draft approved subject to the conditions
in the attached Appendix;
2)
the Mayor or designate be authorized to sign the draft plan as "approved" 20 days
after notice of Council's decision has been given as required by the Planning Act,
provided no appeals of the decision have been lodged; and
3)
draft approval be given for three years, after which approval will lapse unless an
extension is requested by the developer and, subject to review, granted by Council.
BACKGROUND:
The Burnfield Lane townhouse development is located on the west side of Montrose Road, south of
Matthews Drive (see the attached location map). Construction of the 24-unit bungalow project was
initiated in February 2001 and has been undertaken in stages. The unit layout and driveway location
are shown on Schedule 2. The proposal has proceeded through various planning approvals and
consultation with the public.
Working Together to Serve Our Community
Clea¢'s · Finance Human Resources Information Systems Legal Planning & Development
December 3, 2001 - 2 - PD-2001-110
This site was subject to a rezoning application (AM-14/99) that was approved in principle in July
1999. The zoning by-law amendrnent (2000-31) was adopted by Council on February 7, 2000 and
zoned the land R4 (Residential Low Density, Grouped Multiple Dwellings) with special provisions.
The site plan for the project was approved on March 27, 2000 with area residents involved in the
review process. The Site Plan Agreement was registered on title June 27, 2000. During 2001,
applications to the City's Committee of Adjustment were approved to permit the extension of
balconies at the rear of 5 units (Ao30/2001) and for a small lot addition to provide a sanitary sewer
connection to Matthews Drive 0319/2001/NF).
PLANNING REVIEW:
The application for plan o£condominium subdivision will permit the individual ownership of each
unit in the development with the common elements (e.g. open space, driveways) shared by the
condominium corporation. The project has been designed for compatibility with surrounding land
uses and contributes to the mix of available housing types in the area. The application for
condominium is recommended for approval subject to certain conditions.
Standard requirements for all subdivision developments are applied to plans of condominium
including payment of cash-in-lieu of parkland dedication as permitted by the Planning Act. The land
at the southerly portion of this development is part of a lot within the Mount Cannel 2 subdivision
and has previously been assessed for parkland dedication. The provision of a sidewalk and street
trees, as well as improventents to streetlighting, are required along Montrose Road in accordance
with municipal policy. The designation of a fire access route through the site is also a condition of
approval.
Construction of the development has not been completed and a condition is included respecting
confirmation of zoning by-law and site plan compliance when the project is finished. The submitted
plan for condominium approval shows driveway and turnaround areas that do not match the
approved site plan. The City has securities from the developer to ensure compliance with the Site
Plan Agreement. The location of the residential units on the plan have greater rear yard setbacks
than the minimum zoning by-law requirements (providing more amenity area and separation from
abutting single-detached dwellings). However, the resulting distance between units #7 and #8 at the
northwest comer of the site is slightly under the site specific zoning standard. The developer has
submitted a minor variance application (A-58/2001) to be considered later this month to recognize
the existing distance (approximately 7.62 metres - 25 feet).
This development is located close to the QEW highway and requirements for noise attenuation were
included through the site plan process (e.g. window specifications, air conditioning, solid wood fence
along Montrose Road). Land intended for future residential development to the northeast adjacent
to the QEW will require a berm/fence barrier. The Region's Planning & Development Department
has indicated that a warning clause should be included in the Condominium Agreement to advise
future homeowners of potential noise impacts. Such a warning clause is contained in the agreement
for the townhouse condominium to the south.
December 3, 2001 - 3 - ?D-2001-110
CONCLUSION:
The Bumfield Lane townhouse development has received the appropriate zoning and site plan
approvals. The proposed Draft Plan of Condominium will allow the separate ownership of the units.
The conditions of approval are listed in the Appendix.
Prepared by:
Richard Wilson
Planner 2
Edward P. Lustig
Chief Administrative Officer
Recommended by:
~oug Darbyson
Director of Planning & Development
Approved by:
Tony Ravenda
Executive Director of Corporate Services
RW:am
Attach.
S:~PDRk2001\PD2001 - I I 0wpd
December 3, 2001
- 4 - PD-2001-110
APPENDIX
Conditions of Draft Plan of Condominium Approval
1. Approval applies to the Bumfield Lane Draft Plan of Condominium prepared by Matthews,
Cameron, Heywood - Kerry T. Howe Surveying Limited, dated October 31, 2001, showing 24
townhouse units.
2. The developer enter into a registered Condominium Subdivision Agreement with the City to
satisfy all requirements, financial and otherwise, related to the development of the land.
3. The developer submit a Solicitor's Certificate of Ownership for the propertyto the City Solicitor
prior to the preparation of the Condominium Subdivision Agreement.
4. The developer submit a request to Fire Services to designate through municipal by-law the
required fire access route on the property.
5. The developer provide information to Planning & Development to confirm compliance with the
provisions of the Zoning By-law and Site Plan Agreement.
6. The developer construct a 1.5 metre wide sidewalk on the west side of Montrose Road from the
southerly limit of the subject land to the existing sidewalk at Matthews Drive (estimated cost
$9,800.00).
7. The developer provide street trees along Montrose Road abutting the project to the satisfaction
of the Municipal Works Division (estimated cost $700.00).
8. The developer pay for the upgrading of streetlighting (2 streetlight arms, light fixtures, photo
cells) to be mounted on 2 existing Hydro poles along Montrose Road (estimated cost $800.00).
9. The developer pay the City cash-in-lieu of 5% parkland dedication (excluding land credited
through the portion of Lot 1, 59M-183 described as Parts 1 & 2, 59R-10783).
10. The developer provide 6 copies of the pre-registration plan to Planning & Development and a
letter identifying how all the conditions imposed have been or are to be fulfilled.
11. The following warning clause be included in the Condominium Subdivision Agreement and
included in all offers of purchase and sale:
"Purchasers are advised of the proximity of the QEW highway, and despite the inclusion of noise
control measures within the individual building units, noise levels may become a concern,
occasionally interfering with some activities of occupants."
Clearance of Conditions
Prior to granting approval to the final plan, Planning & Development requires written notice from
applicable City Departments and the following agency indicating that their respective conditions have
been satisfied:
Regional Niagara Planning and Development for Condition 11.
Proposed Plan of Condominium
Burnfield Lane
26CD-11-2001-01
Location Map
Subject Land
1: NTSI
No~mb~ 200
BUR_N.F_IE_L.D_L.ANE
Par~ of Stamford Township Lot 55 &
Pad of Lot 1, P~an 5gu-18~ &
Community Services Department
The City of
Niagara Falls
Municipal Works
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
web site: www.city.niaga rafalls.on .ca
Tel: (905) 356-7521
Fax: (905) 356-2354
E-mail: fhiggins@city.niagarafalls.on.ca
December 3, 2001
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
Ci.ty of Niagara Falls
Members:
Ed Dujlovic, P. Eng.
Director
MW-2001-164
File 01-109-01
Re: MW-2001-164
Contract 2001-109-01
Valley Way, Longhurst Avenue and Garner Road
Watermain Replacement
RECOMMENDATION:
It is recommended that the unit prices submitted by the low tenderer, Fine Grade Construction
Ltd., be accepted and the by-law be passed.
BACKGROUND:
The Tender Opeaing Committee, in the presence of the Mrs. Lyrme Wilson, Secretary to Council,
opened tenders on Wednesday, November 28, 2001 at 1:30 p. m. for the above noted contract.
Tender documents were picked up by nine (9) Contractors and eight (8) bids were received.
Listed below is a summary of the totalled tendered prices, excluding GST, received from the
eight (8) Contractors, together with the corrected bids *
1. Fine Grade Construction Ltd.
2. Alfidome Construction Ltd.
3. Provincial Construction Ltd.
4. Centennial Construction
5 DeRose Bros. Gen. Contracting
6. Condotta Construction Ltd.
( Niagara Falls )
( Niagara Falls )
( Niagara Falls)
( Niagara Falls )
( Thorold )
( Thorold )
*$467,610.30 ($467,610.50)
$510,086.00
$511,728.50
* $512,205.00 ($512,259.00)
$520,730.38 ($520,728.49)
$538,114.38 ($530,681.01)
Working Together to Serve Our Community
Municipal Works Fire Services Parks, Recreation & Culture Business Development
2001-12-03 2 MW-2001-164
7. Alfred Beam Excavating ( Fort Erie ) $589,594.00
8. Vic Vatrt Contracting (Welland) $633,488.16 ($634,236.16)
The lowest tender was received from Fine Grade Construction Ltd. in the amount of
$467,610.30. This Contractor has not performed projects for the City. Staff contacted, both the
City of St. Catharines and the Town of Fort Erie, where this contractor has performed watermaln
projects. In both cases, they were satisfied with the contractors performance. We are therefore, of
the opinion, that this Contractor is capable of successfully undertaking this project.
Financing:
The Engineer's estimate for this contract was $475,000.00.
Project Costs:
Awarded Contract
Miscellaneous Fees ( MOE )
Net G.S.T. 3%
$467,610.30
$ 1,200.00
$ 14,028.31
Funding:
TOTAL $482,838.61
Water Reserve
$490,000.00
This project is scheduled to commence on January 21, 2002. All works are to be completed
within 40 working days, with the exception of final restoration and Garner Road, where the City
must wait until the completion of the Regional pumping station and related works.
Council's concurrence with the recommendation made would be appreciated.
Prepared by:
Frank Higgins, C.E.T.
Manager of Projects
Ed Dujlovic, P. Eng.
Director of Municipal Works
proved by:
acDonald
ve Director of Community Services
Chief Administrative Officer
x.
Niagara Fails
Community Services Department
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
web site: www.city.niagarafalls.on.ca
Tel.:
Fax:
E-maih
(905) 356-7521
(905) 357-9293
jmacdona@city.niagarafalls.on.ca
CS-200'1-11
John MacDonald
Executive Director
December 3, 2001
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls, Ontario
Members:
re: CS-2001-11 - Jolley Cut
Recommendation:
1)
That Council accepts the Niagara Parks Commission's recommendation that thc City and
the Niagara Parks Commission jointly undertake ml~fiaafl-a planning review of the Jolley
Cut that includes public and stakeholder input, ~r
2)
That Council authorizes staff to work with Niagara Parks Commission staff to develop a
Terms of Reference for the Jolley Cut planning review;
3)
That Council reconsiders its decision to hold the Jolley Cut Public Meeting on
December 10, 2001 to allow Canadian Niagara Hotels to complete its proposal and to
allow the Niagara Parks Commission and the City to undertake a planning review of the
area.
Background:
On August 7, 2001, Council approved report CS-2001-08 on the Jolley Cut. As a result, a
public meeting has tentatively been scheduled for December 10, 2001 to provide an opportunity
for Canadian Niagara Hotels to present its proposed development of the existing Jolley Cut and,
at the same time, allow the public an opportunity to respond to the proposal.
Recently, however, correspondence has been received from Canadian Niagara Hotels and the
Niagara Parks Commission (copies attached). Canadian Niagara Hotels has indicated that it will
not be prepared to submit its proposal on the Jolley Cut to Council on December 10. The
Niagara Parks Commission has requested that the City work jointly with the Niagara Parks
Commission to undertake a planning review of the Jolley Cut area. The intent of the planning
review would be to provide for long term access between the Park and the City taking into
account the concerns and needs of the public and surrounding stakeholders.
Working Together to Serve Our Community
Municipal Works · Fire Services · Parks, Recreation & Culture · Business Development · Building & By-Law Services
CS-2001-11 - Jolley Cut - 2 - December 3, 2001
Therefore, staff is seeking Council's direction with regard to recommendations noted above.
avCOmmended by: /
e Director of Community
JM:kk
Attachments
Services
Re sp.e~tfully submitted:
Edward P. Lustig )
Chief Administrative Officer//
Ontario
The Niagara Parks Commission
Brian E. MerreLT
Chairma',
John AM. Kemahnn
geetal ~n~jer
Ri]. Box 150. Niagara F~lls, Ontario, ~anacla L2E §T2
E-Moil: npinfo~niagara~rks,co~
Web Site: htTp://www, niagaraparks.c~n
Telephone gos/3~8-224'f Fax ~05/354-§041
November 23, 2001
By Fax Transmission: 905-356-2554
Mr. John MacDonald
City Hall
P.O. Box 1023
Niagara Falls, ON L2E 6X5
De~r Sir:
RE: JOLLEY CUT
As indicated in the recent Commission report it is the NPC's position that detailed planJfing in
the ~rea of the Jolley Cut is desirable before any decisions are made regarding adjacent
development. We recognize that this is not a new issue and acknowledge previous efforts have
not provided results. It is our view, howevg, that development pressures in this area in the near
future make it essential that we re-visit this issue now. We need a plan that provides for long
term access between the Park and the City and at the same time takes into account the concerns
and needs of the land owners along the top of the moraine.
To this end we propose that the City of Niagara Falls and The Niagara Parks Commission jointly
undertake a planning review for this area resulting in recommendations wh/eh are founded on
public consaltation and stakeholder input. We would propose that the City and the NPC be
funding partners and that staffbe authorized to develop the Terms of Reference at the earliest
oppommity.
i tmderstand that Council had anticipated dealk~g with this ma~er at its December 10* meeting. I
would hope that if the joint planning proposal is acceptable that the December 10* meeting could
be postponed until all the information is available.
JIGrLc
Yours truly,
cc: B. Merrett
CANADIAN
NIAGARA
H O T E L S
I N C.
EXECUTIVE OFFICE
NOV ~3 '2001 ~
Ngvember 23, 2001
,By Fax
City of Niagara Falls
4310 Queen Street
Niagara Falls, ON L2E 6X5
Attention: Mr. $ohn McDonald
Dear Mr. McDon~d:
Re: JOLLEY CUT
As per our discussion ~vith you regarding Council Mcetisag on Monday, December 10, 2001
pertaining to Jolley Cut, this is to notify you that we are not prepared, at this time, to submit our
proposal at this meeting.
We are still in the process of preparing information, as well as having a planned informational
meeting open to the public in order that our proposal can be presented and consideration be given
to any concerns brought up at this meeting, h would bc premature for us to have a meeting with
Council on December 10*. I will contact you once we have our presentation ready in a format to
be presented to Council.
Please call with any concerns in this regard.
Sincerely,
CANADIAN NIAGARA HOTELS INC,
D~no A. DiCienzo
President
DAD:im
5685 [CALLS ~VENUn, NI^OARtx F^LLS, ON L21~ fiW? T~L (905) 3744444 FAX (905) 358-0443 ww,,,.xxiagaeafallshotels,com
CLERK:
Mayor Wayne Thomson
Ed Lustig
Ray Kallio
Jotm Mae Donald
Members of City Council
City Hall
P.O. Box 1023
Niagara Falls, Ont
L2E 6X5
Nov 28, 2001
Jolley Cut Petition.
The attached 2 732 names (164 pages) and signatures have been gathered from residents in
favor of retaining public ownership of the Jolley Cut. I request that this petition, as well as the
number of names on the attached petition be recognized at the City Council meeting on Dec 3,
2001. In addition to this, ! request that this letter and a copy oftbe first page of the petition be put
in the agenda package for the Dec 3, 2001 meeting. I also request that this petition be kept on
public record for reference at any future public meetings on the issue of Jolley Cut ownership. I
wish council to recognize the strong public interest for the Jolley Cut to remain in public
ownership, and the opposition to sale to private interests.
Residents for Public Ownership of the Jolley Cut
Jim Brown
3404 Sbeppard Ave
Niagara Falls, Ontario
L2I 3Y1
attached:164 pages
PETITION IN FAVOR.OF RETAINING PUBLIC OWNERSIHP OF ~ JOLLITY CUT
We the undersisaed residents of the City of. Niagara'Palls 0~t_-do oppose the sale of~4h~'ir0ad
allowance onthe east end ot'Robimmn S~. ki'the City of Nhgara Falls commonly known
as tho ~'olley Cut. We wish the. roa~Mlo~mce and pathway remain'in public ~.-ds for public
access'to Que~ ViOtmia Park. '
]'he Ci~/of ~1~
Niagara Fall,s
I -
Corporate Services Department
Human Resources
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
web site: www.city.niagarafalls.on.ca
Tony Ravenda
Executive Director
HR 2001-05
Tel: (905) 356-7521
Fax: (905) 356-5110
E-mail: travenda@city.niagarafalls.on.ca
December 3, 2001
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls
Members:
HR 2001 - 05; OMERS Pension Plan Adjustments
RECOMMENDATION:
That this report be received for the information of Council.
BACKGROUND:
On September 26, 2001, the Chair of the Ontario Municipal Employees Retirement System
(OMERS) notified stakeholders of substantial changes to the OMERS Surplus Package. These
adjustments were the result of the significant downturn in the economy over the past twelve months
and the further impact on financial markets caused by the September 11 tragedy in the United States.
The main changes include a much earlier end to both the Employer and Employee contribution
holiday. Contributions will now be phased in over a three-year period commencing no earlier than
July 2002 and would start at a 2% annual rate increasing to 4% in 2003 and 6% in 2004. This results
in the Corporation's share of OMERS premiums increasing from $0 in 2001 to approximately
$210,000 in 2002 and approximately $865,000 in 2003.
Other revisions include the deferral of a proposed reduction of the OMERS CPP offset for
pensioners and a decrease in the planned pension improvements for pre-1978 retirees. The current
early retirement window has not been affected, and will continue to be gradually phased out ending
in 2005.
Manager of Employee Relations
ieLufullys?9rnitted' ~
stig~ '~ ~ ~
Chief Administrative Officer
Recommended by,
Tony Ravenda
Executive Director of Corporate Services
IForking Together to Serve Our Community
Clerk's Finance Human Resources Information Systems Legal
Planning & Development
'l'he City of
Corporate Services Department
Finance
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
web site: www.city.niagarafalls.on.ca
Tel:
Fax:
E-mail:
(905) 356-7521
(905) 356-2016
kburden@city.niagarafalls.on.ca
F-2001-75
Kenneth E. Burden
Director
December 3, 2001
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls, Ontario
Members:
Re: F-2001~75 - Borrowing By-Law
RECOMMENDATION:
Thai: the Corporate Services Committee approve the borrowing of $23,000,000.00 for current
expenditures and approve the borrowing orS 18,175,000.00 for the acquisition of the CNCP Railway
Corridor
BACKGROUND:
Borrowing for Current Expenditures
The Municipal Act makes provision for the Council to authorize the Mayor and Treasurer to borrow
from time to time such sums as the Council considers necessary to meet the current expenditures of
the Corporation for the year.
The City of Niagara Falls may be required to borrow, from time to time, a stun or sums not
exceeding in the aggregate $23,000,000.00. These temporary borrowings are necessary to pay for
obligations prior to the collection of taxes.
Staff recommends that the Corporate Services Committee approve the borrowing of a sum or sums
not exceeding in the aggregate $23,000,000.00. This amount is the limit established originally in
1993.
Borrowing for Acquisition of the CNCP Railway Corridor
On November 5,2001, City Council approved Report F-2001-65 and enacted two borrowing by-laws
(Nos. 2001-234 and 2001-235) that specifically refer to the acquisition of the CNCP Railway
Corridor. Staff has received the information from the City's financial institution (The Bank of Nova
Scotia) for the temporary borrowing. Staff advises that the borrowing by-law requires amendment
to include the temporary borrowing for the railway acquisition.
Working Together to Serve Our CommuniO:
Cled~:'s Finance Human Resources Information Systems Legal Planning & Development
k)ecember 3, 2001
- 2 - F-2001-75
As at this date, the due diligence investigation into the railway corridor acquisition is not complete.
Staff advises the temporary borrowing will only be required when the purchase/sale agreement is
closed.
Summary
Staff has prepared the borrowing by-law in conformance with the requirements for current
expenditures and for the acquisition of the CNCP Railway Corridor. This by-law is available for
approval given the Council's approval of the recommendation in this report.
Recommended by:
K.E. Burden
Director of Finance
Approved by:
T. Ravenda
Executive Director of Corporate Services
Respectfully submitted:
Corporate Services Department
Finance Division
4310 Queen Street
P.O Box 1023
Niagara Fails, ON L2E 6X5
web site: www.city.niagarafalls.on.ca
Tel: (905) 356-7521
Fax: (905) 356-2016
E-mail: kburden@city,niagarafalls.on.ca
F-2001-76
Ken Burden
Director
December 3, 2001
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls, Ontario
Mexnbers:
Re: F-2001-76 - Municipal Accounts
RECOMMENDATION:
That City Council approve the municipal accounts totalling $2,786,979.96 for the period ending
December 3, 2001.
BACKGROUND:
The accounts have been reviewed by the Director of Finance and the by-law authorizing payment
is listed on tonight's Council agenda.
Recommended by:
K.E. Burden
Director of Finance
Respectfully submitted:
Edward P. Lustig //
Chief Administrative
Approved by:
T. Ravenda
Executive Director of Corporate Services
KEB:jd
Working Together to Serve Our Community
Clerk's · Finance Human Resoumes Information Systems Legal Planning & Development
The City of
Con il
Corporate Services Department
Clerk's Division
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X$
web site: www,city.niagarafalls.on.ca
Tel: (905) 356-7521
Fax: (905) 356-9083
E-mail: wwagg@city.niagarafalls.on,ca
E.C. Wagg
City Clerk
CD-2001-13
His Worship Mayor Wayne Thomson
and Members of the Municipal Council,
City of Niagara Falls, Ontario
Members:
December 3, 2001.
Re: CD-2001-13
2002 COUNCIL SCHEDULE
RECOMMENDATION:
That Council pass the By-law appearing on this evening's agenda adopting a schedule of meetings
for Council for 2002.
BACKGROUND:
Members are reminded that the Procedure By-law, rule 2 requires that Council adopt a schedule of
meetings to be held within any given year. Attached is a proposed schedule of meetings for Council's
consideration. The identical schedule will form part of the By-law which is included on this
evening's agenda for Council's consideration.
Prepared by:
T. Ravenda
Executive Director of Corporate Services
Respectfully submitted:
~E. p~.'. Lustlg '~ ~/J ~
Chief Administrative Officer
TR:lw
Attach.
V52001 COUNCIL/2001 12 03\CD-2001-13 2002 Council Schedule wpd
Working Together to Serve Our Community
Clerk's Finance Human Resources · Information Systems · Legal Planning & Development
January 2002
Council Schedule
15 16 17118 19
22 23 24125 26
Printed by Calendar Creator Plus on 12/10/2001
February 2002
Council Schedule
1 2
3
10
17
24
4
6:00 PM Regular
Council
11
5
12
6
13
7
14
8
15
6:00 PM Regular
Council
18
6:00 PM
Planning/
Council
25
19
26
OntarFo G06dX
20
21
27 28
~ad~ onConveniFon
22
9
16
23
Printed by Calendar Creator Plus on 12/10/2001
March 2002
Council Schedule
Break
gular M T ~ S M ii
1
Printed by Calendar Creator Plus on 12/10/2001
April 2002
Council Schedule
1
Easter Monday
2 3 4 5 6
7
14
21
8
6:00 PM Regular
Council
15
6:00 PM
Planning/
Council
9
16
10
17
12
18 19
z22
6:00 PM Regular
Council
23
24
25
26
13
20
27
28
29
6:00 PM Regular
Council
30
Printed by Calendar Creator Plus on 12/10/2001
May 2002
Council Schedule
S MT WT F S
S MT WT F S
2 3 4 5 6 7 8
23 24 25 26 27 28 29
30
2
4
5
12
19
6
13
6:00 PM
Planning/
Council
20
Victoria Day
7
14
21
8
15
22
9
16
23
10
17
24
26 27 28 29 30 31
18
25
6:00 PM Regular
Council
Printed by Calendar Creator Plus on 12/10/2001
June 2002
Council Schedule
2 3 4 5 6 8
9 15
16 22
23 29
I
Printed by Calendar Creator Plus on 12/10/2001
July 2002
Council Schedule
1
Canada Day
2 3 4 5 6
7
14
21
8
15
6:00 PM
Planning/
Council
22
9 10
16 17
23 24
11
18
25
12
19
26
13
20
27
28 29 30 31
S MT WT F S
2 3 4 5 6 7 8
23 24 25 26 27 28 29
30
S MT WT F S
4 5 6 7 8 9 10
18 19 20 21 22 23 24
25 26 27 28 29 30 31
Printed by Calendar Creator Plus on 12/10/2001
August 2002
Council Schedule
8 9 10
15 16 17
22 23 24
30 31
Printed by Calendar Creator Plus on 12/10/2001
September 2002
Council Schedule
1 2 3 4 5 6 7
Labour Day
8 9 10 11 12 13 14
15 16 17 18 19 20 21
6:00 PM
Planning/
Council
22 23 24 25 26 27 28
29 30 ~~l~;~~lll
Printed by Calendar Creator Plus on 12/10/2001
October 2002
Council Schedule
15 16 17118 19
, 22 23 2412526
Printed by Calendar Creator Plus on 12/10/2001
November 2002
Council Schedule
3
10
17
24
4
6:00 PM Regular
Council
11
5 6 7 8 i9
12
13
14
15
Day
18
6:00 PM
Planning/
Council
25
6:00 PM Regular
Council
19 2O
26 27
21
28
22
29
16
23
30
Printed by Calendar Creator Plus on 12/10/2001
December 2002
Council Schedule
m2
6:00 PM Regular
Council
6:00 PM
Planning/
Council
15 16 171181912021
6:00 PM Regular
Council
22 23 24 12.5~~tr~my26 127~o~g~Y128
/ oven er . / .anuary, _ ~
/ SMTWTF S/ S MT WI F S/
~~~17 18 19 20 21 22 23 19 20 21 22 23 24 25
Printed by Calendar Creator Plus on 12/10/2001
~orporate ~erv~ces Department
Clerk's Division
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
web site: www.city.niagarafalls.on.ca
Tel: (905) 356-7521
Fax: (905) 356-9083
E-maih wwagg@city.niagarafalls.on.ca
December 3, 2001.
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls
Members:
CD-2001-14
E.C. Wagg
City Clerk
RE: CD-2001-14 - Appointments to Boards, Commissions and Committcca
RECOMMENDATION:
That Council select appointees to serve for various terms on Boards, Commissions and Committees
and that the appointments be confirmed by the By-law to be passed at this meeting.
BACKGROUND:
It is necessary for Council to appoint Aldermanic and Citizen representatives to a number of Boards,
Commissions and Committees for the period commencing 2002 and 2003.
It is suggested that where applicable, the Citizen appointments be made by secret ballot with those
obtaining the highest number of votes down to the number of appointments required being appointed
and in the event of a tie vote, where both or all cannot be appointed, a secret ballot for the remaining
appointments will be held amongst the names tied. (Preprinted ballots will be available to assist in
the process).
Arts and Culture COmmission
Appointees required: Seven (7) Citizen Representatives for the 2002, 2003 Term.
Applications Received:
* Carol Cowlishaw ~
# Georg A. Kostyk ~
Philomena McCraken /N
Pat Piccirillo ~
* Brian Smylski ~
* = incumbent # = has applied for appointment to more than one board
CD-2001-14
Greater Niagara Transit Commission
Appointees Required: Two (2) Citizen Representatives for 2002, 2003 Term
Applications Received:
Wm. Frank Brant
# Georg A. Kostyk
Ron Planche ~
* R. T. (Ted) Salci
# Albert Scordino
Lou Stranges
* Ron Sunstrum
John Warren
Niagara Falls Board of Museums
Appointees Required: Three (3) Citizen appointees for the 2002, 2003, 2004 Term
Application Received: # GeorgKostyk ~ '~
Note: Insufficient applications were received to fill all three Citizen vacancies.
Property Standards Committee
Appointee Required: One (1) Citizen representative for the 2002, 2003, 2004 Term
Applications Received:
Sam B. Carrera
Jeff Eidt
* Sam LaRosa /
Anna Lee
* Albert Scordino
Recreation Commission
Appointees Required: Four (4) Citizen Appointees for the 2002, 2003 Term
Applications Received:
* Paul Campigotto ~
Donald (Don) W. Jackson
* Janet Kilty 1/~
# Georg Kostyk
* Tom Merrett /
Anna C. Phillips
Prepared by:
T. Ravenda
Executive Director of Corporate Services
TR:lw
Attach.
Respectfully submitted:
CD-2001-14
Chief Administrative Officer
ARTS & CULTURE
BOARDS, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE:
NAME OF APPLICANT: CAROL C0~LISH&~
3568 ARLINGTON AVEI~JE
ADDRESS:
NTAGARA FALLS,
POSTAL CODE: L2J
TELEPHONE NUNiBER: RESIDENCE: ~('~OS) '~.-~?'~R
BUSINESS: (905) 356-8080
OCCUPATION: CLERICAL ASSISTANT . NIAC~A FALLS PHBLIC LIBRARY
EDUCATION AND OTI~ER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET FOR
THE, ABOVE APPOINTMENT:
B.A. (Honours) in ~usic (Brock University)
Active member o£ Niagara Falls Concert Band
Volunteer, Gallery Players Association
An ~nterest ~n seeing the arts in N~agara promoted and the profile o~ the
arts community raised
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
and promoted to the£r fulL, potential. I would l~ke to do ~hat I can to
, r~e~ the a~tuat~ono
OTHER COMlVIENT$ RELATIVE TO THE APPLICATION:
Signature of Applicant ~
Date
Please complete and submit to:
C1'1'¥ CLERK
City Hall, 4310 Queen Street
P.O, Box 1023
Niagar~ Falls, ON L2E 6XS
Telephone: 90~-356-7521, ext. 4271
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
POSTALCODE:
TELEPHONE NUMBER:
.us: ~c~--~ /$?7
OCCUPATION: ~'~,a ,.,,~'~)<.~'/~,..~?~,.~ ~,,..,~/4~'~
EDUCATION AND OTHER QUALIFICATIONS ~HICH YOU FEEL WODLb~E AN ~ET~__
· "2-
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Please complete and submit to: R.O. Kallio, Acting City Clerk
City Hall, 4310 Queen Street
P. O. Box 1023
Niagara Falls, Ontario.
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONE NUMBER:
RES:
BUS:
OCCUPATION:
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Sign~ure of Applicant
~,~,,'~ J~_~ / , ~.~,~ /
Please complete and submit to:
R. O. Kallio, Acting City Clerk
City Hall, 4310 Queen Street
P. O. Box 1023
Niagara Falls, Ontario.
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
PH. (906)358-~274
Philomena McCmcken
Expedeflce
Education
Interests
1989 - Present Royal Bank of Canada
~ Selv~e Rel~
· Depcaits/Withdrawals
· Handle current accounts, draft money orders
, Certified cheques, travelers cheques
1994 - 2000 Gift Box / Victoria Vadety
· Responsible for purchasing & displays
· Scheduling, payroll, cashier
· Bank deposits, accounts payable
1984 - 1988 Robinsons Ogilvy
· Responsible for scheduling, inventory
· Purchasing, receiving
· Payroll, cashier
1977 - 1983 Rocky's Place
Restaam~t Me,agra'
· Responsible for scheduling, payroll
· Purchasing, receiving
· Cashier, waitress
1980- 1982 Niagara College
· Night course in accounting, typing
· Food and beverage control
1987 Niagara Falls C.V.I.
· Night course in computers
1979 - Present Peterson Community Workshop
· Art class teacher
Reading, arts and crafts, yoga
Knowledgeable in Vigilant, Word, Excel, Intemet
Niagara Falls, ON
Niagara Falls, ON
Niagara Falls, ON
Niagara Falls, ON
Welland, ON
Niagara Falls, ON
Niagara Falls, ON
The City of
Niagara Fallsll~l~.
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
NAME OF APPLICANT:~
ADDRESS:
POSTAL CODE:
TELEPHONE NUMBER:
OCCUPATION:
BUS:
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
-2-
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Please complete and submit to:
R. O. Kallio, Acting City Clerk
City Hall, 4310 Queen Street
P. O. Box 1023
Niagara Falls, Ontario.
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
The City of ~'~Jll~
Niagara Falls I~11~'
Please t~e or orint lctfibB/
APPLICATIONS EOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARDS, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE:
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONE NUMIlER:
OCCUPATION:
EDUCATION AND OTHER QUAL/FICATIONS WHICH YOU FEEL WOULD BE AN ASSET FOR
THE ABOVE APPOINTMENT:
-2-
¥o~ REASONS ~o~ D~sn~ Tins ~'POrNT~n~:
OT~R COMMENTS RELATIVE TO ~ APPLICATION:
Signature of Applicant
Dat~'
Please complete and submit to.'
City Hall, 4310 Queen Street
P.O. Box 1023
Niagara l~alls, ON LZE 6X5
Telephone: 905-3S6-7521, ext. 4271
NIAGARA TRANSIT
Re City of
Niagara Falls
pLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
NAME OF APPLICANT: w~. Em~K Emit
ADDRESS: 6068 VALLEYWAY
NIAGARA FALLS ONTARIO
L2E-1Y2
RES: (905)374~-1193
BUS:
POSTAL CODE:
TELEPHONE NUMBER:
OCCUPATION: RETIRRn (t,~'A~CAC.'~R n~ n~jTZON) NIAGARA TRANSIT
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
31 YEARS IN THE TRANSIT INDUSTRY
SERVED ON THE ULTIMATE PEOPLE MOVER COMMITTEE
COURSES INCLU~M- ARBITRATIONS
WOP~INC ~TAMDAP~S
ROUTE ASSESSMENT AND DEVELOPMENT
OTHER TRANSIT RELATED SEMINARS
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
. THE NEXT TWO TO THREE YEARS WILL HAVE A LOT TO DO ~J~TH THE 'FUTURE OF NIAGARA
TRANSIT. THERE WILL HAVE TO MAJOR CHANGES TO ACCOMODATE THE PEOPLEMOVER
SYSTEM. I FEEL WITH MY EXPERIENCE I WOULD BE AN ASSET TO THIS TRANSFORMATION,
~'~u~KE IS A POTENTIAL FOR A GREAT MODERN TRANSPOI%TATION IN THE MAKING
AND IT SHOULD BE IN THE PLANNING STATE VERY SOON,
OTHER COMMENTS RELATIVE TO THE APPLICATION:
AS I AM RETIRED I DO HAVE THE TIME AND INTEREST TO HELP MAKE OUR TRANSIT
SYSTEM A BENEFIT.--TO OUR LOCAL RESIDENTS AS WELL AS THE GROWING TOURIST'ii ~[
INDUSTRY.
Please complete and submit to:
S~'gna{ure of Applicant
E.C. Wagg, City Clerk
City Hall, 4310 Queen Street
P.O. Box 1023
Niagara Falls, Ontario L2E 6X5
Telephone: (905) 356-7521, Extension: 4271
Niagoro Foll$11Iia:.
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
NAME OF APPLICANT:
ADDRESS:
/~. 74 T-~')<~
POSTAL CODE: Z', ,O ~ / ..~""F,.._~
TELEPHONE NUMBER: RES:
BUS:
OCCUPATION:
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
-2-
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Please complet~an~'su~mit to: E.O.~a~rR~"~
City Hall, 4310 Queen Street
P.O. Box 1023
Niagara Falls, Ontario L2E 6X5
Telephone: (905) 356-7521, Extension: 4271
THE CITY OF
NIAGARA FALLS
CANADA
APPLICATION FOR APPOINTMENT FOR BOARDS, COMMISSIONS AND
COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
GREATER N ~I~GARA TRANSIT COMMISSION
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
Ron Planchc
6344 Forest Ridge Drive
Niagara Falls
Ontario,
L2J 4K2
TELEPHONE NUMBER:
FACIMILLIE:
MOBILE:
(905) 357-0809
(905) 357-6117
(905) 704-9244
E-Mail:
ronplanche~cogeco.ca
OCCUPATION:
Director of Revenue Development
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE
AN ASSET FOR THE ABOVE APPOINTMENT:
Education:
St. Thomas University: Graduated - Bachelor of Arts -History
Sheridan College - Creative Photography
York University - Marketing Communications
York University - Atkinson College - Art History
Business:
Crowmek Business Centres: National Sales Manager- CAD/Graphics
Harvest Business Centres: Vice-President, Sales and Marketing
Planche & Planche: Principal
Community Seri, ice:
· Governor, Sheridan College of Applied Arts and Technology
· Regional Municipality ofHalton - Regional Councilor
· Chair - Budget Review Committee
· Chair- Regional Public Works Committee
· Vice-Chair- Social and Family Service
· Municipality of the Town of Oakville - Councilor
· Planning Committee
· Transit Committee
· President, Rotary Club
· President, Community Living Association
· Founding Member/Director, The Centre for the Performing Arts
· Founder/Director, The Children's Centre
· Founding President, Haltun-Peel Youth Symphony Orchestra
· Director, Chamber of Commerce
· Director, YM-YWCA
· Director, Children's Aid Society
· Director, The Board of Health
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
I wish to make a strong positive contribution to the community to which I now belong.
Perhaps the many years of community service, an intense interest in smart community
development, emerging transportation issues and a fi:esh new look may be of benefit to
the Niagara Transit Commission.
New opportunities will emerge in the next couple of years and council will benefit by
having someone on the committee that has a strong understanding of budget, revenue
generation and management issues to maximize, integrate and strengthen the municipal
transit operation for the benefit of all.
OTHER COMMENTS RELATIVE TO THIS APPLICATION:
I have had the opportunity over the years to see some remarkable transit systems over the
years in places Ilke Portland, Denver, Atlanta, Paris, New Orleans, San Francisco and a
several smaller communities.
Friday, November 23, 2001
Please complete and submit to:
RiO. Kaillo, Acting City Clerk
City Hall, 4310 Queen Street,
P.O. Box 1023,
Niagara Falls, Ontario.
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
The City of
Niagara Falls I1~._
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMII'~EES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONE NUMBER:
RES:
BUS:
OCCUPATION:
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Please complete and submit to:
Signature of Applicant
Date
E.C. Wagg, City Clerk
City Hall, 4310 Queen Street
P.O. Box 1023
Niagara Falls, Ontario L2E 6X5
Telephone: (905) 356-7521, Extension: 4271
The City of J~iJ~
Niagara Falls
~ UUZ
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMIVIIS$ION AND CO1VIM/TTEE FOR WHICN APPLICATION
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONE NUMBER: RES: fi05 770~6 -75~
· JPfimary: Administrative, Co-or~ator, Re.on of Nia~
OCCO~AltON.]~econ~: ~opfietOr Ti~ F~ci~ & A~inis~ative [
EDUOATION AND OTHER QUALIFIOATJON~~~ ~N ASSET
FOR THE ABOVE A~POINTMENT; ' --- --
Please see attached resume for details concerning my qualifications
education. , ......
-2-
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
~,..___ ~,~, .., ~e t,o.e, nn.ance the tradition of providing the citizens
xn~agara vmls wtm anorrmole, convenient, timely, safe and reliable public
transportation.
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Recreation Commission Member
I have been a member of the Niagara Falls, Recreation Commission for
Several years. During my tenure as a member and v/ce-chaff of the
conumssion I have gained valuable knowledge and experience that will
serve me well in my role on the Transit Commission.
Catholic School Board Trustee
As a school Board Trustee I was constantly called upon to competently
discUss and make difficult decisions concerning: multi-milton dollar , ....
operational and capital budgets; policy development; human ~]
resources and ~-
collective bargaining. I propose that this experience will allow me t°
competently and effectively contribute to the management of the Niagara
Falls Transit. '
Signature oflAppl{cant --
Please complete and submit to:
R. O, Kallio, Acting City Clerk
City Hall, 4310 Queen Street
P. O. Box 1023
Niagara Falle, Ontario,
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
~8~2~[7o~ee ~.n_~li~[_.~_nt~lo_~ H 2~.N~---~ _ ~-~Phone 905-356-4898 Fax 905-356-9828 E-mail Istrangesl
@cogeco.ca
Lou Stranges
Education:
Ontario Association of Non-Profit Homes and Services for Seniors (OANHSS)
Administrator Certification
Ryerson University; Toronto, Ontario (1999)
Master of Business Administration Degree (MBA).
Niagara University; Niagara Falls, New York (1999 present)
Honours Bachelor of Commerce Degree
McMaster University; Hamilton, Ontario (1983-1987)
Major: Finance Minor: Accounting
Secondary School Honour Graduation Diploma
A.N. Myer High School; Niagara Falls, Ontario (1979-1983)
Professional Experience:
Administrative, Co-ordinator
The Regional Municipality of Niagara- Community Services Department-Seniors Division,
Sunset Haven I D.H. Rapejle Lodge Home for the Aged; Welland, Ontario (1987-present)
Assist the Administrator with the overall management of a 227 and 120 bed Long
Term Care facility and various Home committees and task forces;
Supervise and co-ordinate the provision of Home clerical and administrative
support by evaluating the effectiveness and efficiency of support processes,
functions, facilities, equipment, technology and telecommunications in relation to
"customer" needs and continuous quality improvement programs (CQI);
Hire, train, discipline, motivate, evaluate and manage Administrative department
staff;
Responsible for the homes' intake processes in terms of determination of rates
and other financial & administrative arrangements;
Ensure all administrative processes, financial reports and disclosures comply with
the applicable government standards, regulations, and organizational polices;
Manage resident information, trust, accounts payable and receivable systems by
monitoring and overseeing the Inputting of data into Compucare, a computerized
database system;
Interpret and apply three collective agreements (ONA #9, CUPE 1287, CUPE 1263);
Prepare and/or oversee the preparation and distribution of various documents,
reports and correspondence;
Respond to inquiries and complaints from residents, families, the public, staff,
government, business and community agencies;
Organize and co-ordinata special events as needed;
Represent the Home and/or the Administrator on various committees, taskforces
and meetings;
Co-ordinate, prepare, monitor, and analyze annual Home/departmental Budget(s);
Responsible for the homes accounting processes in-conjunction with the
Corporate services accounting staff;
Research and write comprehensive management reports, policies and procedures;
Liaise with regional department(s); government, business and community agencies
and associations;
Assistant to the Administrator Continued:
Assist in the development of Home strategic plans including the development and
Implementation of goals and objectives;
Assess, recommend and implement applicable office automation;
Per~orrn account receivables collection functions ss required;
Alternate Member of the Occupational Health and Safety Committee;
Continuously monitor the ever-chang ng legislative, technological and societal
environment to anticipate and strategically plan to meet current and future client
and staff needs by employing entrepreneurial business techniques.
Proprietor
Titan Financial & Administrative Services; Niagara Falls, Ontario (Part-time; 1994-present)
Financial consulting: loans, mortgages, Investments and tax avoidance strstegles
Consult on and prepare personal and business income tax returns.
Specialize in Seniors Income Security Programs
General Manager
Carousel Carts, Niagara Falls, Ontario (Summer 1983-1987)
Profitably operated a 5-sita novelty ice cream and beverage operation within the
Niagara tourist sector.
Languages Spoken: English, Italian & French.
Computer Knowledge:
Intermediate and advanced knowledge of: Microsoft Office Suite, Ms-Windows,
Interest Explorer, GEAC budgeting and General edger system, Cantax and Profile
Tax preparation and Financial Planning, Ross Payroll System, and several desktop
publishing programs;
Database management: development and maintenance - Microsoft Access,
Compucars -information, trust, accounts payable, billing and accounts receivable
system;
Pmgremming: Cobol and Basic Languages;
Avid user of Intarnet resources.
Special Education and Interests:
Orientation to the Manager's role in successful process improvement;
Ceom. pre. h. en, sive training and utilization of" value added through employee
aaersn,p ' (VITEL) process Improvement techniques;
Labour relations training Including coaching counseling and constructive
discipline;
Working knowledge of telecommunication systems programming, configuration
and maintenance;
Advanced knowledge of the Income Tax and Employment Standards Act;
Advanced knowledge of the Occupational Health and Safety Act
Successfully manage several rental propert es (1990-prasent};
Secretary - Treasurer for O.A.N.H.S.S Region #2 (1991-1999);
Life Long lasmer and health enthusiast.
Recent Career achievements:
Successfully coordinated the implementation of appropriate Computer networks
within and between two work sites;
Successfully, researched recommended and mp emented several
telecommunlcat ons systems within and between two work sites;
Successfully and creatively restructured the administrative departments within and
between two work sites to ensure the effective and efficient utilization of human
resources and the delivery of services;
Successfully, facilitated several stakeholder forums associated with the re-
development of Sunset Home for the Aged;
Trustee, Welland County Roman Catholic Separate School Board (1994-1997);
Inductee, the Niagara Falls Sports Wall of Fame {1999);
Volunteer Experience:
Member, the Niagara Falls Recreation Commission (1993-present);
Member, The Canadian Italian Professional and Business Association(CIPBA)
Vice-chairperson of the Regional Municipality of Niagara's United Way Campaign
(1991-1993);
Master of Ceremonies for the 1998 and 1999 televised Niagara Falls Volunteer
Recognition event;
Member of the Stamford Centre Volunteer Firefighters Association (1993-1999);
References Supplied Upon Request
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONE NUMBER:
OCCUPATION:
RON SUNS TRUM
8089 MARCON STREET
N IAG~dlA FALLS
L2H 3A9
(905) 374-4266
RES:
(905) 374-5200 ext. 5276,~
BUS:
CREDIT llA2qAG E R
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
- DIPLOMA BUSINESS ADMINISTRATION
- 6 YEARS SERVED ON NIAGARA TP~SIT AS SECRETARY TREASURER
- WORK EXPERIENCE (31 YEARS) INCLUDE MONITORING COSTS & BUDGETS
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
i WOULD LIKE TO CONTINUE SERVING',.'THE PEOPLE OF NIAGARA FALLS IN OVERSEEING
THE DAY-TO-DAY OPERATIONS OF NIAGARA TRANSITAS IN THE PAST 6 YEARS. I HAVE MADE
SEVERAL KEY CONNECTIONS WITH VARIOUS BUS COMPANIES WHICH USE OUR SERVICES WHILE
IN NIAGARA
OTHER COMMENTS RELATIVE TO THE APPLICATION:
~I BELIEVE CONTINUITY IS ESSENTIAL WHEN DEALING WITH CLIENTS. I FEEL I HAVE
REPRESENTED OUR CITY VERY WELL OVER THE PAST 6 YEARS AND HOPE TO CONTINUE
DOING SO.
Please complete and submit to:
Date
EC. Wagg, City Clerk
City Hall, 4310 Queen Street
P.O. Box 1023
Niagara Falls, Ontario L2E 6X5
Telephone: (905) 356-7521, Extension: 4271
.The Oily Of
Niagara Falls II1~_
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONE NUMBER:
OCCUPATION:
BUS:
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
-2-
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Please complete and submit to: R.O. Kalllo, Acting City Clerk
City Hall, 4310 Queen Street
P. O. Box 1023
Niagara Falls, Ontario.
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMII'TEE$
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONE NUMBER: RES: ~;~O-.~-J 7/- O~-~-~
OCCUPATION: ~;)O~~-- ~- ~// ~. ~
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
,/
o?.,,-,,,,'~ ,-,d/ ,.z'. ,-/
OTHER COMMENTS RELATIVE TO THE APPLICATION:
'~ ~p-plica nt
13nt~
Please complete and submit to:
R. O. Kallio, Acting City Clerk
City Hall, 4310 Queen Street
P. O. Box 1023
Niagara Falls, Ontario.
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
BOARD OF MUSEUMS
The City of ~JlJ~
Niogoro Fo,s llJ
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMXi'i'EE FOR WHICH APPLICATION
IS BEING MADE
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONE NUMBER:
OCCUPATION: ~~
EDUCATION AND OTHER QLIALIFICATIONS-WI'IICH YOU FEELWOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
-2-
YOUR REASONS FOR DESIRING THIS APPOIN'I::MENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Please complete and submit to:
E.C. Wagg, City Clerk
City Hall, 4310 Queen Street
P.O. Box 1023
Niagara Falls, Ontario L2E 6X5
Telephone: (905) 356-7521, Extension: 4271
PROPERTY STANDARDS
11/21/200l 10:50 BO52951Z~9
PLEASE TYPE QR PRINT LEGIBL'
APPiLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMIT'IT,,~.,S
BOARD, COMMISSION AND CONfMITI~E I~OR WHICll AI~PLICATION
I$ RILING [~I)E
k.~l,~.G.,A~ r~'ALL~ ~. ~
NAME OF APPLICANT:
ADDRESS:
POS~'rAL CODE:
TELEPHONE NUMBER:
BUS:_ ~ ~,~-~ E~,cr.~D,e,
ED~ATION AND OTHER QUALIFI~TION8 WHICH YOU FEEL WOULD BE ~ ~SET
FOR ~E A~VE APPOINTMENT:
- ~~._ I~~o~/P~ ~~
y~ ~~ ~~ (o,~,p,~.o.) .....
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Please complete and submit to:
Signature of Applicant
R. O. I(ellio, Acting City Clerk
Clty Hill, 4510 Queen Street
P. O. Box I02:l
Niagara Fails, Ontario.
L2E 6X$
Telephone (905) 356-752~, Ex't: 4243
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONE NUMBER:
OCCUPATION:
ANNA LEE
4423 KATHLEEN CRES.
NIAGARA FALLS
L2H 3H8
905-3541558
RES:
BUS: 905-374-2337
part own~ at Custom Brew
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
A REAL ESTATE DIPLOMA AT NIAGARA COLLEGE? AS WELL AS MARKETING. OTHER
COURSES INCLUDE COMMERCIAL CONCEPTS? KNOW YOUR ?RODUC~?NEW HOUSE SALES,
POS, REAL PROPERTY LAW. I SAT ON THE PROPERTY STANDARDS COMMITTEE FOR
NIAGARA FALLS REAL ESTA~E~;BQARD FOR 2 TERMS. PRESENTLY I SIT ON THE
MARKETING COMMITTEE FOR THE CHAMBER OF COMMERCE, THE ENVIRONMENTAL
PLANNING AND GREENING COMMITTEE FOR THE CITY OF NIAGARA FALLS AND THE
COMMUNITY RESOURCES CENTRE MANAGEMENT COMMITTEE FOR THE CITY OF NIAGARA
FALLS.
-2-
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
WANTING TO BECOME MORE INVOLVED IN THE COMMUNITY~' MY LOVE
THIS WONDERFUL CITY~/~ND THE DESIRE TO SEE IT PROSPER AND GROW.
FOR
PROPERTY STANDARDS IS A VITAL LINK TO UNIFORMITY WITH IN CITY BOUNDRIES
· MIS~MMITTEE DOES MAKE A DIFFERENCE. FINALLY LOCAL POLITICS HAVE
ALWAYS ~M~9~M~'[~INTMREST.
OTHER COMMENTS RELATIVE TO THE APPLICATION:
SITTING ON VARIOUS COMMITTEES HAS GIVEN ME THE EXPERIENCE NEEDED TO
SIT ON THIS COMMITTEE, WITH THE BACKGROUND IN REAL ESTATE I KNO~ iT .~' '
WOULD BE A PERFECT FIT.
A SUGGESTION: PLEASE LET US DOWN LOAD THESE APPLICATION FROM THE CITIES
WEB SITE SO WE DO NOT HAVE TO USE A PORTABLE TYPE~'WRTTER~!
Signature of Applicant
Please complete and submit to:
R. O. Kallio, Acting City Clerk
City Hall, 4310 Queen Street
P. O. Box 1023
Niagara Falls, Ontario.
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
' 'The City of
· Niagara FallsI
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
/
· ..... *r" ' , , ~, ~...~,--. , ..... · ,, , ,.:× ~ ,
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE: ~/~),~'
TELEPHONE NUMBER: RES: ~o,r--
BUS:
OCCUPATION: /~ o~ ~,~J /~#~
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Si~..~ture of Applicant
Please complete and submit to:
R. O. Kalllo, Acting City Clerk
City Hall, 4310 Queen Street
P. O. Box 1023
Niagara Falls, Ontario.
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
November 12, 2001
R.O. Kallio
Acting City Clerk
City Hall
4310 Queen Street
P.O. Box 1023
Niagara Falls, Ontario
L2E 6X5
Dear Mr. Kallio:
Re: Application for appointment to the Property Standards
Committee
Please find attached my application for an appointment to the
Property Standards Committee for the City of Niagara Falls.
In response to your first question on the application, I have
attached my Personal Resume, which I trust expresses both my
educational and professional qualifications that are relevant to the
selection to this committee.
This particular committee is of interest to me not only as a result
of my professional background, but being a life long resident of Niagara
Falls I am concerned with the direction to the city is heading. With all of
the growth ahead of us and the wonderful prosperity that is knocking at
our door, I would like to have some form of personal impact on the
direction of this growth and to ensure that high standards are
maintained.
If you have any questions or concerns, please feel free to call me at
anytime.
Yours truly,
Conrad Jeffrey Eidt
110 -3568MontroseRoad
Niagara Falls, Ontado
L2E 6S4
905-354-4607
905-351-1262
PROFESSIONAL EXPERIENCE
1997 to present St. Andrew's Niagara Housing Development Corp.
Position:
Property Manager
· Enhanced the quality of life of the residents and increased
resident satisfaction by opening channels of communication
and nurturing conciliation and mediation
· Increased accountability through the construction of a
detailed and readable accounting operating system and
enhanced the reporting format to the Board of Directors by
creating several other distinct sets of financial statements
· Established the format and reporting process for the
preparation and the monitoring of the annual budgets
· Developed and implemented written procedures for the
maintenance and preventative maintenance programs
· Authored a Policy and Procedure Manual, Fire Safety and
Security Manual and an Emergency Evacuation Manual
and ensured implementation to establish proper procedures
· Introduced innovative partnerships with the Regional
Governments Senior's Day Program and the Victoria
Order of Nurses
· Established a relevant and effective governance model
which allows for Quality Assurance and informative
reporting to the Board and residents
· Train and develop staff to ensure quality performance and
consistent high standards
1991 to 1997
Sanderson Property Management Inc.
Position:
Property Manager
· Restructure the management and accounting of nine Non
Profit Housing Corporations
· Established proper channels of communication and levels
of authority and governance for Boards and residents
1987 to 1991
Position:
1978 to 1987
Position:
Ensured all operations were according to governmental
guidelines and relevant parties were informed of decisions
and policies
Ganawageh Urban Homes
Property Manager
· Developed a computerized accounting program and rebuilt
the financial history of the Corporation
· Brought all of the financial and operational aspects under a
co-ordinated control mechanism and ensured proper
governance and approval for aifaspects of the operation
· Developed a Policy and Procedure manual and
Maintenance Manual and ensured consistent application
· Created levels of communication to ensure that residents
and Board members were aware of relevant areas of
concern
Children's Aid of the Niagara Region
Assistant Business Administrator
· Supervised accounting staff
· Responsible for month end procedures, monthly financial
statements, monthly reports to each department, payroll,
investments and reconciliation's
· Assisted in the preparation of the annual budget
· Supervised maintenance staff and ensured that all
maintenance activities were duly completed to a high
standard
EDUCATION
Bachelor of Commerce, St. Mary's University
University of Waterloo, completed accounting major
Certified General Accounting Program - completed 4th year
A.M.C.T.O. - completed required courses
AFFILIATIONS
Niagara Falls Rotary Club - Board of Directors
and Chairman of several major fund raising events
Victoria Order of Nurses - Board of Directors
and member of the Finance Committee
N.S.C.C. #1 - Board of Directors and Treasurer
Ontario Non Profit Housing Association - Finance Instructor
.T.h,e City of
Niagara Fails llllt
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WltICH APPLICATION
IS BEING MADE
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONE NUMBER:
Sam LaRosa
5765 Depew Avenue
Niagara Falls, Ontario
L2G 5M2
RES: 905 356 1400
BUS: 905 356 1922
Contractor
OCCUPATION:
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
I feel I can still be of service to this Committee because
I have filled this position f~r approximately Two Years
after the vacancy created by the death of Michael Aceti.
I have been in the Construction busihess for over Forty
Years and I feel my experience in this {~etd would be an
asset to this Committee.
-2-
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Please complete and submit to:
Signature of Applicant
Date
E.C. Wagg, City Clerk
City Hall, 4310 Queen Street
P.O. Box 1023
Niagara Falls, Ontario F2E 6X5
Telephone: (905) 356-7521, Extension: 4271
· The City of
Niagara Falls lie
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONE NUMBER:
OCCUPATION:
EDUCATION AND
FOR THE ABOVE APPOINTMENT:
OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Please complete and submit to:
R. O. Kallio, Acting City Clerk
City Hall, 4310 Queen Street
P. O. Box 1023
Niagara Falls, Ontario.
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
The City of ~.
Niclgc~rc~ F(311s ~1~_
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE:
RECREATION COMMISSION
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
PAUL CAt~IGOTTO
7666 Mount Carmel Blvd.
NiaKara Falls, Ont.
L2H 2Y3
TELEPHONE NUMBER:
BUSINESS:
OCCUPATION:
RESIDENCE:
(905) 354-7689
{905~ 374-5200 x 5560
Pavro]] Mana~mr
Acres International Ltd.
Niagara Falls
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
Please see attached
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
We must ensure that the recreation of the citizens of Niagara Falls
remains a priority.~
With cutbacks at all ~overnment levels~ volunteers will n~ed strong
Recreation Commission support more than ever. The next few years in
Niagara Falls will see many exciting changes. I request the opportunity
to help make these changes to better our recreational community.
OTHER COMMENTS RELATIVE TO THE APPLICATION:
In over 30 years of volunteer work, I have gained valuable evperience.
This translates to strong leadership, communication and organ4zmtional skills.
I would like to continue to share this expertise with the Recreation Coa~nissJon.
Thank you
Please complete and submit to:
Sig~Applicant
Nov. 7, 2001
Date
E.C. Wagg, City Clerk
City Hall, 4310 Queen Street
P.O. Box 1023
Niagara Falls, Ontario L2E 6X5
Telephone: (905) 356-7521, Extension: '4271
Paul Campigotto
Born and raised in Niagara Falls
Graduated University of Western Ontario B.A. Economics 1975
Payroll Manager Acres International Ltd. since 1979
Served 23 years as executive member of Greater Niagara Baseball Association
Awarded GNBA Life Membership in 1991
Awarded the "Canada 125" medal in 1992 for community service
Received the George McPha~l award in 1999 for outstanding volunteer service in
the city of Niagara Fails
Serves as chair of the St. Paul High School Council
In1998 1 was first appointed by council to the Recreation Commission. In 2000
and 2001 I was elected chair. To serve the Commission in this capacity has been
both an honour and a privilege. I will not run for the position of chair in 2002.
There are many good Commission members who deserve a chance to fulfill their
ambitions as I did a few years back. I do, however, wish to continue as a member
of The Recreation Commission. I hope my experience will be of benefit.
During the four years, I have been very active on the Recreation Commission. It
has been a great honour to host and emcee the past 2 volunteer recognition
evenings. As chair, I have been able to host many new neighbourhood park
official openings and Recreation Department seminars. I have helped at four
Canada Day Celebrations and look forward to my fourth Santa Claus Parade. I
was a member of the Millennium Committee and currently serve on the Wall Of
Fame Board.
It is my hope that the Recreation Commission can continue to provide our citizens
with programs and facilities that are second to none. I feel that the Recreation
Commission can and should take a more active role in decisions affecting
recreation in our city.
11/24/2081 1G: 25 985-358-8446 JACKSON PAGE
The City o!
Niagara Falls
Canada
02
APPUCATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE:
I~.CRF..ATION COMMI~ION
NAMF._O F APPLICANT: .
ADDRESS: (~'/70 ~-z_ C~-,~.
POSTAL CODE:
TELEPHONE NUMBER: RESIDENCE:
BUSINESS'.
OCCUPATION:
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
~/24/20~1~ ~6:25 905-358-844~ 5AC~SON PAGE 83
-2-
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
Please complete and eubmlt to:
R. O, Kellio, Acting City Clerk
City Hell, 4310 Queen Street
P. O. Box 1023
Niagara Falls, Ontario.
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
Niagara Falls ~1~._
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE:
RECREATION COMMISSION
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONENUMBER:
BUSINESS:
OCCUPATION:
RESIDENCE:
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
-2-
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
\ ~,c~-.,< ~w-,~.~ o__.~___~,.~.~ e~
~ ~~ .~ ~
OTHER COMMENTS RESTIVE TO THE APPLICATION:
Please complete and submit to:
R. O. Kallio, Acting City Clerk
City Hall, 4310 Queen Street
P. O. Box 1023
Niagara Falls, Ontario.
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
Niagara Falls JJ~j~
PLEASE TYPE OR PRINT LEGIBLY
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMII~EES
BOARD, COMMISSION AND COM1VII'I-IEE FOR WHICH APPLICATION
IS BEING MADE
NAME OF APPLICANT:
ADDRESS:
POSTAL CODE:
TELEPHONE NUMBER:
OCCUPATION:
.z. o ,-='- /u~o /,/o
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
-2-
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Please complete and submit to:
E.C. Wagg, City Clerk
City Hall, 4310 Queen Street
P.O. Box 1023
Niagara Falls, Ontario L2E 6X5
Telephone: (905) 356-7521, Extension: 4271
;l'he City of ~11~
Niagara Falls
I -
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE:
RECREATION COMMISSION
NAME OF APPLICANT: '~O ~
ADDRESS:
POSTAL CODE: L- ~ (T j-- ~ P 2-
TELEPHONE NUMBER: RESIDENCE:
BUSINESS: ~O~- ~ ~-7
OCCUpatiON: ~;~ ~ ~
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
-2-
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
- ', ~x. ~(~1~c~ ~, (~ ·
Please complete and submit to:
Signature,of Applicant '
R. O. Kallio, Acting City Clerk
City Hall, 4310 Queen Street
P. O. Box 1023
Niagara Falls, Ontario.
L2E 6X$
Telephone (905) 356-7521, Ext: 4243
APPLICATION FOR APPOINTMENT TO BOARDS, COMMISSIONS AND COMMITTEES
BOARD, COMMISSION AND COMMITTEE FOR WHICH APPLICATION
IS BEING MADE:
RECREATION COMMISSION
N~v~E OF APPLICANT:
ADDRESS:
POSTAL CODE: ~ H
TELEPHONE NUMBER:
BUSINESS:
OCCUPATION:
RESIDENCE:
· Ak k6 0 I~T.
EDUCATION AND OTHER QUALIFICATIONS WHICH YOU FEEL WOULD BE AN ASSET
FOR THE ABOVE APPOINTMENT:
-2-
YOUR REASONS FOR DESIRING THIS APPOINTMENT:
OTHER COMMENTS RELATIVE TO THE APPLICATION:
Signature of AppliCant
Please complete and submit to: R.O. Kallio, Acting City Clerk
City Hall, 4310 Queen Street
P. O. Box 1023
Niagara Falls, Ontario.
L2E 6X5
Telephone (905) 356-7521, Ext: 4243
Report of Body Rub Parlour Committee
Re: Marijana Kovinic
IN THE MATTER of a Heating pursuant to the
lbiuntct£alAc! and By-law Nos. 1999-184 and 2001-91
AND IN THE MATTER OF a Hearing regarding
Marijana Kovinic
Stage 1 Eligibility requirements in her
application for a Body-P~b Parlour Owner's Licence
INDBX
2.
3.
4.
Sur~m,~,'y of Bvid~ce ........................................................................... Pase
St~mmAry of Arguments presanted by the parties .................................... Page
F~nri;nEs of Fact ..................................................................................... Pase
Recomrnelldations of the Committee with reasoils therel~or ..................... Page
Page 1 of 4
1. SLrMMAKY OF EVIDENCE
Application for Body-Rub Parlour Owner's Liceme ofMarijana Kovinic dated
January 5, 2001;
Copy of l~cter from Niagara Regional Police Service, dated March l, 2001;
Copy ofl~ter from the City Clerk, dated April 18, 2001;
Copy of lease betwee~ Jihad Ma[ak and Mafij~ua Kovinic, dated July 14,
Copy of arnended leaze between Fthad Malak and Marijana Kovinic, dated July 14, 2000;
Copy of letter from Crraydon Sheppard, representing Zika Kovinic, to Malcolm C'rah~m.
rcpresenting Jihad Malak;
Copy of Agreement of Purchase and Sale between purch~er Zika Kovinic, in tn~st, and
vendor, Fthad Mils~. dated June 30, 2001;
Statements of Mr. Ray Kaliio, solic/tor for the City of Niagara_ Falls;
Statements of Mr. Luigi DeLisio, solidtor for Mmrijsna Kovinic;
Testimony of Ms. Marijaua Kovinic.
Page 2 of 4
SUMMARY OF ARGUlV~NTS PRESEN't'~D BY THE PARTIES
Mr, Kallio for thc City of'Niagara Falis
a. Mr. Kallio, as solicitor for thc City ofBFmgara Fal/s, claims that the Stage 1
application of Ms. Kovinic cs~not proceed because the lease which she submitted
as part of her application for a Body-Rub Parlous Owner's Licence, dated Janua~/
$, 2001, was not in compliance with Section I1 (1) b el'By-Law 99-164. This
section requires sumbission of a copy of the Icesc or any other document creating
or affec~ the legal relationship betwecn the applicant and the registered owner
of the property.
b. Thc copy of the lease submitted by Iris. Kovinic on lanuary $, 2001, had expired
on lanuary 4, 2001.
c. Subsequently, Ms. Kovinlc ~ubmit~od the same lease as above, with the t¢lm
changed, and to run from Fshma~y 1, 2001 to May 31, 2001.
d. Mr. Kallio, on behalf of the City of Niagara Falls, claims that neither the expired
lease nor thc amended [easc fult~l! the requirements of the By-Law. The first by
virtue of beln~ expired was void and therefore unacceptable. The second was
unacceptable because tho term of the leasc was for only 4 monihs, while the term
of the license was for I year, The applicant did not demonstrate that she kad valid
title to the property for the licencing period.
c. Furthermore, there is nothing in law or in fact to indicatc that M_s. Kovinic had ally
interest in the land except for the periods descn'oed in the lease, which did not
corrcspood to the term of the license,
f. According to Section 11 (1) (b) of the By-Law, there is no legal ril~ht to usc thc
property because the term had expired.
g. The termslofthe lease were also in doubt because Ms, Kovinic claimed in her
testimony to have paid the landlord $1,350.00 monthly, and not the $~2,000.00 '
monthly prescribed in the lease document.
Page 3 of 4
H
Mr. DeLislo for Marijam Kovi~ic
a. Mr. DeLisio argued that Ms. Kovinic's te~ncy contiuued on a month-to-month
basis aider the term oftha lease had expired, and that this was s~t~cient to comply
with Section 11 (1) (b) of the By-Law.
FINDINOS OF FACT
a. No evidence was submitted to the Commli'te~ to prove that Ms. Kovinic had title
to the property.
RECOMMENDATIONS OF COMMITTF~ WITH REASONS THR. RI~OR:
a. The Committee finds that Ms. Kovinic did not comply with $f~ction 11 (1) (b) of
the By-Law because sho did not prove that she had legal title to the property for
the duration of the term of the lkense.
b, The Committee recommends that Council direct the Clerk not to proceed with
processin~ the application unless and ~ntil:
i, Ms. Kovinic provides doct~m, entation on or before 4:30 p.m. on the
et~eaflt-day ofigetob~r, 2001, that she is either the owner or tenant of the
property, failint~ which the application will not be processed.,.
ii. Suoh documentation must comply with Section 11 (1) (b) of thc By.Law'
-and must be acceptable to the Clerk of the City of Niagara Falls.
Page 4 of 4
Aldcrmm Art Federow
Alderman Ga~ Hendershot
Alderman ~arolynn loamloni
Aldermma Selina Volpatfi (Chair)
The City of
Corporate Services Department
Legal Services
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
web site: www.city.niagarafalls.on.ca
Tel: (905) 356-7521
Fax: (905)374-7500
E-mail: rkallio@city.niagara falls.on.ca
R.O. Kallio
City Solicitor
L-2001-70
December 3,2001
His Worship Mayor Wayne Thomson
and Members of Municipal Council,
City of Niagara Falls, Ontario
Members:
L-2001-70, Establish Part 3 on 59R-11368 as a
Public Highway to be known as Garner Road
Our File No.: 2001-248
RECOMMENDATION:
That thc road widening, described as Part 3 on Reference Plan No. 59R-11368, be
established as a public highway to form part of Garner Road.
BACKGROUND:
As a condition of Committee of Adjustment approval, Frank Matthew Liefl and Elizabeth Catherine
Liefl were required to convey a road widening to the City. The subject land is located on the west
side of Garner Road and shown hatched on the plan attached. Staffis now recommending that the
subject land be established as a public highway to form part of Garner Road.
Prepared by:
S.M. Daniels, A.M.C.T.
Legal AssistanffProperty Manager.
Approved by:
Tony Ravenda,
Executive Director of Corporate Services.
Rec~...~ by:
R O Kallio,
City Solicitor.
Respectfully Submitted:
Edward P. Lustig,
Chief Administrative Officer.
Working Together to Serve Our Communi~
Clerk's Finance · Human Resources Information Systems Legal Planning & Development
E
AMFORD
S
PIN 64264-0063(LT)
PIN 64264-0064(LT)
TOWNSHIP
PIN 64264-0029
LOT
PART 2
-- PiN 64264-0066(LT)
INST, No. 2,5114B (FIRSTLY)
PART 2
I 59R-6166
151
PART 2
-O
E
NOTES
ALL FO(JND UONuM£NTA~;ON SHOWN ON
~4atthews, Comeron. Heywood. Kerry
IMPERIAL NOT[:
BEARING NOTE
LEGEND
Peri of Sfamford Tm
CITY OF NIAGARA FALl
REGIONAL MUNICIPALITY D
~RV[YOR'S C[RTWI~AT[
Niagara Falls
Corporate Services Department
Human Resources
4310 Queen Street
P.O. Box 1023
Niagara Falls, ON L2E 6X5
web site: www.dty.niagarafalls.on.ca
Tel: (905) 356-7521
Fax: (905) 356-5110
E-maih travenda@city.niagarafalls.on.ca
Tony Ravenda
Executive Director
HR 2001-06
December 3, 2001
COMMITTEE-OF-THE-WHOLE
His Worship Mayor Wayne Thomson
and Members of the Municipal Council
City of Niagara Falls
MeTnbers:
HR 2001 - 06; City Clerk
RECOMMENDATION:
That Council pass the appropriate by-law appointing Mr. Dean Iorfida to the position of City Clerk
at the start rate for the position effective December 17, 2001.
BACKGROUND:
On December 31, 2001, Woody Wagg officially retires as the Corporation's City Clerk. After an
extensive competition, Mr. Dean Iorfida, who is presently the Executive Assistant to the Mayor has
been offered the job, subject to Council's approval.
The: appointment of Mr. Iorfida will be conditional upon the following:
1. One year probationary period.
Preg..ared & Recommended by,
T. Ravenda
Executive Director of Corporate Services
Clerk's
2~. Enrollment/completion of AMCT designation.
E~. p..ect fqlly~b~gd,~
C~i;f Adr~inistrative Officer)
Working Together to Serve Our Community